fig 16A, photo, The large wooden beams ready to be installed.
fig 16B, photo, Prefabricated elements are fixed on the columns.
fig 16C, photo, Steel elements where the secondary wooden beams will be fixed on.
fig 16D, photo, The building of the extension of the store of Aveve.
fig 16E, photo, The existing store of Aveve.