PRIMARY STRUCTURE, RECTOLIGHT, Flexible solution for flooring (renovation as for new projects) Light, easy, integration of techniques and insulation. Can be placed without scaffolding. posted by Manon Coppens at 24.05.17, filed under: concrete, wood, STUDIO: studio17-1, back-button PRIMARY STRUCTURE, RECTOLIGHT, Flexible solution for flooring (renovation as for new projects) Light, easy, integration of techniques and insulation. Can be placed without scaffolding. posted by Manon Coppens at 24.05.17, filed under: concrete, wood, STUDIO: studio17-1, back-button
fig 103A,