PRIMARY STRUCTURE, Program, The site in total is 13.000 m2. From which 3.350 is build and 7.000 m2 is being used as a carpark. The 2.650 m2 of green is divided into small pieces. posted by Anton Parys at 30.05.17, filed under: brick, concrete, glass, plastics, steel, wood, STUDIO: studio17-1, Location: IJzerweglaan 101, Gent, back-button PRIMARY STRUCTURE, Program, The site in total is 13.000 m2. From which 3.350 is build and 7.000 m2 is being used as a carpark. The 2.650 m2 of green is divided into small pieces. posted by Anton Parys at 30.05.17, filed under: brick, concrete, glass, plastics, steel, wood, STUDIO: studio17-1, Location: IJzerweglaan 101, Gent, back-button
fig 116A, drawing, Freeing the site of cars by putting them in a tower of the same height as his modernistic neighbor. © Anton Parys
fig 116B, photo, Entering the city via the E17 viaduct © Anton Parys
fig 116C, drawing, © Anton Parys
fig 116D, photo, © Anton Parys
fig 116E, drawing, Program © Anton Parys