PRIMARY STRUCTURE Hot Rivet Location: wijkpark De Porre Gentbrugge, In the construction steel you have to dril an exact same whole, then you put the heated nail inside it. By holding one side and pounding it with a hydraulic hammer, you form on one side the material in such way that the nail holds the plates in between in place. This is a permanent connection. posted by Hannes Mol at 15.03.17 in Gent, 2017 LOGIN
fig 43A, photo, knooppunt staalstructuur

Related posts by author