PRIMARY STRUCTURE TECHNICAL DETAILS Location: TONDELIER (Rabot-Blaisantsvest), Technical details concerning the Gasometers at the Tondeliersiteposted by Alexander Van den Spiegel at 24.05.17 in Gent, 2017 LOGIN
fig 93A, Technical detail on the guiding rails
fig 93B, Technical detail on the connection between the steel structure & foundation

Related posts by author