PRIMARY STRUCTURE, Project, Manchester Two, posted by Isra Cekaj at 27.05.20, filed under: STUDIO: gent-2020,
back-button
PRIMARY STRUCTURE, Project, Manchester Two, posted by Isra Cekaj at 27.05.20, filed under: STUDIO: gent-2020, back-button
fig 740A, model,
fig 740B, drawing,
fig 740C, drawing,
fig 740D, drawing,
fig 740E,