PRIMARY STRUCTUREIndustrial warehouseLocation: Ter Eike, 8840 Staden, It's our own new warehouse. In order te keep the construction cost low the warehouse is designed by the dimensions of the concrete panels. This allowed us to cover a relatively large area within our budget.posted by Thomas Monsy at 15.03.17in Gent, 2017LOGIN
fig 28A, photo, connection between foundation and column
fig 28B, photo, connection between column and beam
fig 28C, photo,
fig 28D, photo, connection between beams
fig 28E, photo, connection between column and beam