PRIMARY STRUCTURE, Industrial warehouse, It's our own new warehouse. In order te keep the construction cost low the warehouse is designed by the dimensions of the concrete panels. This allowed us to cover a relatively large area within our budget. posted by Thomas Monsy at 15.03.17, filed under: steel, STUDIO: studio17-1, Location: Ter Eike, 8840 Staden,
back-button
PRIMARY STRUCTURE, Industrial warehouse, It's our own new warehouse. In order te keep the construction cost low the warehouse is designed by the dimensions of the concrete panels. This allowed us to cover a relatively large area within our budget. posted by Thomas Monsy at 15.03.17, filed under: steel, STUDIO: studio17-1, Location: Ter Eike, 8840 Staden, back-button
fig 30A, photo, connection between foundation and column
fig 30B, photo, connection between column and beam
fig 30C, photo,
fig 30D, photo, connection between beams
fig 30E, photo, connection between column and beam
fig 30F, photo,