PRINT
FORMAT
publication
poster
SIZE
A5
A4
A3
A2
A1
A0
SCALE
full
third
half
quarter
back-button
Fit in page
PRIMARY STRUCTURE
,
Eames Case Study House 8,
September 1950 issue of Architectural Forum, The Magazine of Building.
posted by
David Van Oostende
at 02.03.21,
filed under: glass, steel,
STUDIO: gent-2021,
Location: Los Angeles, California,
LOGIN
reset password
back-button
PRIMARY STRUCTURE
,
Eames Case Study House 8,
September 1950 issue of Architectural Forum, The Magazine of Building.
posted by
David Van Oostende
at 02.03.21,
filed under: glass, steel,
STUDIO: gent-2021,
Location: Los Angeles, California,
LOGIN
back-button
PRIMARY STRUCTURE
,
Eames Case Study House 8,
September 1950 issue of Architectural Forum, The Magazine of Building.
posted by
David Van Oostende
at 02.03.21,
filed under: glass, steel,
STUDIO: gent-2021,
Location: Los Angeles, California,
LOGIN
back-button
fig 777A, photo,
RESOURCES
1
Eames Office Official Website