fig 933A, drawing, Final design plan and drawings
fig 933B, drawing, Final design plan and drawings
fig 933C, drawing, Final design plan and drawings
fig 933D, drawing, Final design plan and drawings
fig 302A, WTC Sketch
fig 96A, mazda site koopvaardijlaan, Drawing of the interior structure on the exterior wall. Also the remnants of a connected wooden building that burned down in the 1970's is still visible in the drawing.
fig 96B, mazda site koopvaardijlaan, cast concrete column
fig 96C, mazda site koopvaardijlaan, View towards aisle on the side of the tracks.
fig 96D, mazda site koopvaardijlaan
fig 103A, RECTOLIGHT
fig 64A, DOME – EPS + SPRAYED CONCRETE, DOME - EPS + SPRAYED CONCRETE
fig 64B, DOME – EPS + SPRAYED CONCRETE
fig 64C, DOME – EPS + SPRAYED CONCRETE
fig 64D, DOME – EPS + SPRAYED CONCRETE
fig 942A, Axometrie
fig 756A, drawing, Projection of chessboard grid on Vynckier site
fig 582A, Proposal Facade Vynckier site
fig 560A, Section Vynckier Machinekamer
fig 673A, fragment model
fig 673B, fragment model
fig 673C, fragment model
fig 460A, bOb
fig 460B, bOb
fig 460C, bOb
fig 460D, bOb
fig 605A, drawing, English Garden – Lancelot Capability Brown
fig 201A, Floors sections
fig 70A, photo, Pictures Nonnemeersstraat, Ghent
fig 70B, photo, Pictures Nonnemeersstraat, Ghent
fig 110A, drawing, Current structure analyse
fig 110B, drawing, Current structure analyse
fig 110C, Current structure analyse
fig 110D, Current structure analyse
fig 123A, New structures
fig 797A, analysis facade hangar
fig 484A, model, Model housing tower
fig 135A, model, Final model
fig 289A, Louis Sullivan – The tall office building artistically considered
fig 407A, drawing, open apartment
fig 1006A, model, Gate Building, Gate Building
fig 1006B, Gate Building, Gate Building
fig 1006C, Gate Building, axis
fig 1006D, Gate Building, Bridge Structure
fig 552A, Prefab Walls
fig 576A, drawing, Masterplan
fig 469A, photo, workshop
fig 469B, workshop
fig 624A, Connecting grid model
fig 334A, WERKMAQUETTE_3.1
fig 334B, WERKMAQUETTE_3.1
fig 222A, model, proces_22
fig 44A, drawing, STEEL JOINT
fig 185A, DECORMAQUETTE
fig 807A, Vliegtuigloods Grimbergen
fig 366A, Opwervendag Nemo link
fig 366B, Opwervendag Nemo link
fig 366C, Opwervendag Nemo link
fig 366D, Opwervendag Nemo link
fig 688A, Model Manchester
fig 688B, Model Manchester
fig 688C, Model Manchester
fig 688D, Model Manchester
fig 215A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 478A, housewithonepencil.
fig 717A, Vynckier Circle Building
fig 717B, Vynckier Circle Building
fig 717C, Vynckier Circle Building
fig 717D, Vynckier Circle Building
fig 599A, Proposal masterplan Vynckier site
fig 48A, model vs Spa reine
fig 386A, CATHEDRALE COMMUNALE_PROGRAM
fig 386B, CATHEDRALE COMMUNALE_PROGRAM
fig 524A, ANALYSE Steilneset Memorial – PETER ZUMTHOR, Steilneset Memorial - Peter Zumthor
fig 89A, photo, Study models
fig 89B, Study models
fig 89C, photo, Study models, Using the same logic to connect two pieces to find the right length
fig 929A, Design details
fig 380A, Final design: looking inside the model
fig 380B, Final design: looking inside the model
fig 193A, meetings
fig 117A, model, Test model of 19 04 2017
fig 117B, model, Test model of 19 04 2017
fig 117C, model, Test model of 19 04 2017
fig 680A, model
fig 680B, model
fig 680C, model
fig 680D, model
fig 934A, Analyse Nachtergaele models
fig 934B, Analyse Nachtergaele models
fig 934C, Analyse Nachtergaele models
fig 934D, Analyse Nachtergaele models
fig 966A, finaale maquette
fig 966B, finaale maquette
fig 966C, finaale maquette
fig 492A, DETAIL – brick meets wood
fig 226A, drawing, proces_27
fig 849A, Structure analysis Erfoeddepot Trezoor, Kortrijk
fig 849B, Structure analysis Erfoeddepot Trezoor, Kortrijk
fig 849C, Structure analysis Erfoeddepot Trezoor, Kortrijk
fig 325A, work documents 20180417
fig 325B, work documents 20180417
fig 325C, work documents 20180417
fig 1019A, photo, Work on view at LifeCycles event 2022
fig 1019B, photo, Work on view at LifeCycles event 2022
fig 473A, work in progress
fig 473B, work in progress
fig 755A, photo, Eve Babitz playing chess with Marcel Duchamp, Pasadena 1963
fig 391A, Cathedrale Communale
fig 391B, Cathedrale Communale
fig 391C, Cathedrale Communale
fig 391D, Cathedrale Communale
fig 258A, model WTC
fig 521A, photo, Les Monseigneurs – Primary Talks
fig 521B, Les Monseigneurs – Primary Talks
fig 954A, structuur – detail
fig 954B, structuur – detail
fig 954C, structuur – detail
fig 954D, structuur – detail
fig 706A, photo, Vynckier, Masterplan, Functies
fig 976A, GROOTHANDELSMARKT DER VLAANDEREN
fig 976B, GROOTHANDELSMARKT DER VLAANDEREN
fig 976C, GROOTHANDELSMARKT DER VLAANDEREN
fig 534A, photo, Rue Franklin 25bis, Paris – Auguste Perret
fig 378A, Model structure
fig 50A, drawing, OLD vs. NEW
fig 511A, model, END MODEL
fig 511B, model, END MODEL
fig 511C, model, END MODEL
fig 910A, Analyse Picobello Roeselare
fig 910B, Analyse Picobello Roeselare
fig 851A, ERFGOEDDEPOT TREZOOR KORTRIJK
fig 851B, ERFGOEDDEPOT TREZOOR KORTRIJK
fig 851C, ERFGOEDDEPOT TREZOOR KORTRIJK
fig 276A, Structure WTC 1 +3 & +24
fig 276B, Structure WTC 1 +3 & +24
fig 276C, Structure WTC 1 +3 & +24
fig 276D, Structure WTC 1 +3 & +24
fig 443A, VERNACULAR
fig 675A, research existing structure
fig 675B, research existing structure
fig 675C, research existing structure
fig 675D, research existing structure
fig 499A, Housing tower – AXO
fig 690A, Modelshots CONNECTING GRID
fig 690B, Modelshots CONNECTING GRID
fig 690C, Modelshots CONNECTING GRID
fig 690D, Modelshots CONNECTING GRID
fig 583A, model, Proposal Masterplan Model
fig 676A, model, Dwarse snede woning
fig 251A, DEEP PLAN construction detail 1, structural detail 1
fig 46A, drawing, masterplan site gentbrugge
fig 46B, drawing, masterplan site gentbrugge
fig 46C, photo, masterplan site gentbrugge
fig 824A, Structure Pattyn Factory
fig 35A, drawing, Floor systems of bricks
fig 35B, drawing, Floor systems of bricks
fig 35C, drawing, Floor systems of bricks
fig 35D, model, Floor systems of bricks
fig 358A, Detailing sketches
fig 271A, Citygroup Center
fig 271B, Citygroup Center
fig 271C, Citygroup Center
fig 916A, THE RESULT, Plot 5, model 1/100 and 1/50 by Alexandre Moens
fig 916B, THE RESULT, Plot 5, model 1/100 and 1/50 by Alexandre Moens
fig 287A, WTC 1 axo tetris
fig 925A, JURY studio 21, Gent Wiedauwkaai
fig 925B, JURY studio 21, Gent Wiedauwkaai
fig 925C, JURY studio 21, Gent Wiedauwkaai
fig 925D, JURY studio 21, Gent Wiedauwkaai
fig 965A, omgevings maquette voorontwerp
fig 965B, omgevings maquette voorontwerp
fig 523A, Photo during construction – Healey Guest House – ‘Cocoon House’
fig 529A, photo, Vynckier 1981-94
fig 529B, photo, Vynckier 1981-94
fig 221A, model, work in progress
fig 809A, V-Profiles used in the ceiling (lost formwork), V-Profile 1978
fig 415A, model, werkmaquette
fig 415B, model, werkmaquette
fig 709A, photo, Vynckier, Masterplan, Overdekte markt met passerelle
fig 616A, photo, SCHETSEN 1/04
fig 616B, SCHETSEN 1/04
fig 616C, photo, SCHETSEN 1/04
fig 616D, drawing, SCHETSEN 1/04
fig 362A, WTC 1 – model of mosque
fig 362B, WTC 1 – model of mosque
fig 663A, OMA
fig 663B, OMA
fig 663C, OMA
fig 663D, OMA
fig 816A, photo, Loods Soubry, Roeselare – Ruff
fig 617A, lecture atelier Haegheman Temmerman
fig 361A, Bamboo exoskeleton stairs , Vertical garden
fig 361B, Bamboo exoskeleton stairs , Vertical garden
fig 810A, o n l i n e
fig 748A, photo, Vynckier 2, Principe, Maquette, Inkom
fig 90A, Connection of a steel beam to a concrete wall
fig 90B, Connection of a steel beam to a concrete wall
fig 535A, photo, Palais d’Iéna, Paris – Auguste Perret
fig 263A, structureel schema plint
fig 775A, photo, Thomas Ruff Collages, Autographe, Wavre,Teamwork with Jill Gielen.
fig 775B, photo, Thomas Ruff Collages, Mopac, Lommel,Teamwork with Jill Gielen.
fig 775C, photo, Thomas Ruff Collages, Stukwerkers, Gent,Teamwork with Jill Gielen.
fig 122A, Structure site Nieuwevaart Gent
fig 122B, Structure site Nieuwevaart Gent
fig 447A, photo, Collage geïnspireerd op Gilbert & George
fig 230A, proces_32
fig 937A, drawing, Jury 27mei2021
fig 937B, Jury 27mei2021
fig 937C, Jury 27mei2021
fig 937D, Jury 27mei2021
fig 815A, photo, A. Mangiarotti
fig 815B, photo, A. Mangiarotti
fig 815C, A. Mangiarotti
fig 815D, drawing, A. Mangiarotti
fig 404A, drawing, DETAIL_SILO
fig 640A, Maquette
fig 640B, Maquette
fig 235A, model, Laia Bonet and Charlette Frémont
fig 371A, Research roof structure diving tank
fig 371B, Research roof structure diving tank
fig 911A, primary structure maquette
fig 911B, photo, primary structure maquette
fig 911C, photo, primary structure maquette
fig 911D, photo, primary structure maquette
fig 191A, meetings
fig 990A, Brug Util
fig 679A, 27/05
fig 679B, 27/05
fig 679C, 27/05
fig 679D, drawing, 27/05
fig 383A, CATHEDRALE COMMUNALE_PLANS
fig 1005A, End Presentation, Drawings
fig 1005B, drawing, End Presentation, Drawings
fig 1005C, drawing, End Presentation, Drawings
fig 1005D, End Presentation, Drawings
fig 120A, Reference structure steel
fig 120B, Reference structure steel
fig 120C, Reference structure steel
fig 328A, Werf station parking
fig 328B, Werf station parking, plan ondergrondse parking
fig 328C, Werf station parking, wapening om 4 bogen op aan te sluiten, door een fout is het beton te hoog gegoten waardoor alles terug is uitgekapt. Hierdoor komt de wapening in het beton bloot te liggen.
fig 328D, Werf station parking, beton voor de Kiss&Ride wordt gegoten.
fig 8A, photo, FRAC, Dunkerque by Lacaton & Vasal, Frontal Facade, showing the old building and new 'copy' next to each other
fig 8B, photo, FRAC, Dunkerque by Lacaton & Vasal
fig 8C, photo, FRAC, Dunkerque by Lacaton & Vasal, The beautiful transparency of the skin invites the outside world in and ceases to be distant as an art institution might be. The shell does only what it is meant to do, protect its core from the outer elements. The glass and steel myth was reinterpreted and altered with a plastic and steel frame.
fig 8D, photo, FRAC, Dunkerque by Lacaton & Vasal, Steel connection between the old and new building.
fig 250A, working session
fig 310A, Architecture Noordwijk
fig 310B, Architecture Noordwijk
fig 273A, References Prestige Towers
fig 376A, Wooden box in steel structure
fig 959A, FINAL DESIGN
fig 132A, 4 Column House
fig 423A, Early plan social triplex
fig 804A, Casa a tre cilindri
fig 722A, photo, Vynckier 2, Vynckier 2, Wachtgevel
fig 309A, Balkony garden
fig 309B, Balkony garden
fig 309C, Balkony garden
fig 309D, Balkony garden
fig 374A, WERKMAQUETTE_4.1
fig 792A, EL Beton – Structuur plan
fig 363A, cathédrale communale work documents
fig 363B, cathédrale communale work documents
fig 790A, miro miro
fig 790B, miro miro
fig 264A, Manhattan project
fig 264B, Manhattan project
fig 264C, Manhattan project
fig 655A, Steel Frame Box
fig 592A, drawing, 25/03
fig 592B, drawing, 25/03
fig 592C, model, 25/03
fig 817A, Willemen Infra Asfaltcentrale Gent
fig 817B, Willemen Infra Asfaltcentrale Gent
fig 55A, section draft
fig 564A, In het spoor van Serafinus
fig 746A, vynckier 2020
fig 293A, Core WTC
fig 406A, drawing, Facade
fig 814A, photo, Autographe, Teamwork with Jill Gielen.
fig 677A, Axonometrie primaire structuur
fig 677B, Axonometrie primaire structuur
fig 150A, Composite steel columns
fig 385A, CATHEDRALE COMMUNALE
fig 209A, drawing, proces_10
fig 568A, photo, WATER TOWER, Public square as entrance.
fig 568B, photo, WATER TOWER, Manchester's are for living and the heart of industry (water tower) between them.
fig 333A, REFERENTIE_2
fig 21A, photo, Tram depot Marconi – site visit
fig 21B, photo, Tram depot Marconi – site visit
fig 21C, photo, Tram depot Marconi – site visit
fig 260A, REA new ramp
fig 699A, Facades
fig 699B, Facades
fig 518A, drawing, Kimbell Art Center
fig 518B, Kimbell Art Center
fig 106A, drawing, SITE
fig 106B, drawing, SITE
fig 438A, Gilbert & George
fig 563A, Photo of of interior staircase at building 4, Vynckier site
fig 835A, drawing, Facq building, primary & secondary structure
fig 665A, Plan 1 terminal
fig 651A, Circle Building section
fig 82A, model, Analysis structure “De Porre”, Part of structure with cantilever
fig 82B, Analysis structure “De Porre”, Part of structure with cantilever - top
fig 82C, Analysis structure “De Porre”, Part of structure with cantilever
fig 164A, photo, CREE LCT building system, Floor slab with the holes in it for the steel bar of the columns
fig 164B, CREE LCT building system, wall piece with the columns attached
fig 441A, Visible structure
fig 36A, photo, Woonzorgcentrum Van Lierde, the blocks can be used for structural and non-structural purposes
fig 161A, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 161B, drawing, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 161C, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 161D, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 43A, photo, Hot Rivet, knooppunt staalstructuur
fig 249A, photo, working session
fig 914A, FIETSBRUG WIEDAUWKAAI
fig 914B, FIETSBRUG WIEDAUWKAAI
fig 914C, FIETSBRUG WIEDAUWKAAI
fig 914D, photo, FIETSBRUG WIEDAUWKAAI
fig 229A, proces_31
fig 3A, drawing, Voorhaven Site, The column is constructed with leftovers from the world expo in Antwerp 1985
fig 3B, photo, Voorhaven Site
fig 3C, drawing, Voorhaven Site, how hot riveting is done.
fig 995A, Photo Assignment
fig 995B, Photo Assignment
fig 995C, Photo Assignment
fig 995D, Photo Assignment
fig 41A, drawing, Steel structure
fig 41B, drawing, Steel structure
fig 41C, drawing, Steel structure
fig 41D, drawing, Steel structure
fig 315A, Tetris Within A Tetris
fig 620A, Structuur Schijf
fig 945A, Onderzoek industriebouw
fig 945B, Onderzoek industriebouw
fig 945C, Onderzoek industriebouw
fig 648A, Building with shed structure
fig 503A, BEEKSTRAAT
fig 503B, BEEKSTRAAT
fig 503C, BEEKSTRAAT
fig 451A, collage de canal.brussels á la G&G
fig 343A, Open structure + circulation
fig 32A, drawing, Hangar INCO, Exploded construction of the hangar
fig 32B, drawing, Hangar INCO, Composition detail of brick, concrete columns and plinth
fig 32C, Hangar INCO
fig 32D, Hangar INCO
fig 10A, drawing, CORRUGATED WEB BEAM, Production GLP Beam
fig 10B, photo, CORRUGATED WEB BEAM, Connection GLP to GLP
fig 10C, photo, CORRUGATED WEB BEAM, Connection GLP to column
fig 10D, photo, CORRUGATED WEB BEAM, Example project
fig 267A, OCBC Bank
fig 59A, PUNCHED/PUNCTURED BEAM
fig 59B, PUNCHED/PUNCTURED BEAM
fig 59C, PUNCHED/PUNCTURED BEAM
fig 996A, photo, End Presentation, Axonometric Drawing
fig 698A, Masterplan
fig 698B, Masterplan
fig 545A, Manchester building – structure
fig 545B, Manchester building – structure
fig 604A, Masterplan V2
fig 604B, Masterplan V2
fig 700A, De Nieuwe Vynckier – Incubator – Concept
fig 413A, Final design detail
fig 413B, Final design detail
fig 305A, Site Visit 1
fig 305B, Site Visit 1
fig 305C, Site Visit 1
fig 305D, Site Visit 1
fig 848A, Structure analysis Erfoeddepot Trezoor, Kortrijk
fig 367A, Structural model WTC brewery
fig 367B, Structural model WTC brewery
fig 470A, volumestudie
fig 501A, Section A110
fig 772A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 926A, Vertical farming
fig 926B, Vertical farming
fig 926C, Vertical farming
fig 926D, Vertical farming
fig 759A, Ghent expo
fig 311A, Analysing the parking lot
fig 311B, Analysing the parking lot
fig 311C, Analysing the parking lot
fig 311D, Analysing the parking lot
fig 565A, Vynckier oude luchtfoto
fig 348A, Scheme connections in steel
fig 618A, U VYNCKIER
fig 618B, U VYNCKIER
fig 357A, Overlaying Bamboo “hinge”
fig 13A, photo, Arrival_Tower
fig 589A, photo, Vynckier Site, masterplan, sketch
fig 632A, Structure ConnectingGrid
fig 457A, Enclosed house
fig 107A, drawing, details in color
fig 107B, details in color
fig 107C, details in color
fig 107D, details in color
fig 866A, THE RESULT, Plans, sections and axonometry with Alexandre Moens
fig 866B, THE RESULT, Plans, sections and axonometry with Alexandre Moens
fig 866C, drawing, THE RESULT, Plans, sections and axonometry with Alexandre Moens
fig 993A, Plan Walkway
fig 993B, Plan Walkway
fig 993C, Plan Walkway
fig 993D, Plan Walkway
fig 480A, Werkmaquettes concept DAUWSTRAAT/PICARDSTRAAT, Processed with VSCO with preset
fig 480B, Werkmaquettes concept DAUWSTRAAT/PICARDSTRAAT, Processed with VSCO with preset
fig 198A, sketch
fig 935A, drawing, Intermediate design proposal week 12
fig 935B, Intermediate design proposal week 12
fig 935C, drawing, Intermediate design proposal week 12
fig 935D, drawing, Intermediate design proposal week 12
fig 920A, Design model 1/50
fig 446A, photo, Gilbert & George
fig 562A, drawing, Plan floor level (+0) of building 4 and 4A, Vynckier site
fig 811A, Detail betonnen loods Ieper
fig 811B, Detail betonnen loods Ieper
fig 685A, facades
fig 685B, facades
fig 685C, facades
fig 685D, facades
fig 382A, WTC EXISTING STRUCTURE
fig 130A, Example sites photos
fig 130B, Example sites photos
fig 130C, Example sites photos
fig 538A, ECAM – Agwa Architects
fig 538B, ECAM – Agwa Architects
fig 83A, drawing, SITE ANALYSE
fig 83B, drawing, SITE ANALYSE
fig 83C, drawing, SITE ANALYSE
fig 537A, ECAM – Agwa Architects
fig 537B, ECAM – Agwa Architects
fig 200A, photo, Axonometry Limit – Axel and Luna :)
fig 95A, Tube and Coupler Scaffolds
fig 95B, Tube and Coupler Scaffolds
fig 95C, Tube and Coupler Scaffolds
fig 95D, Tube and Coupler Scaffolds
fig 703A, De Nieuwe Vynckier – Incubator – Passerel
fig 864A, Circular Stacking ; RUFF
fig 62A, container cut outs
fig 62B, container cut outs
fig 62C, container cut outs
fig 62D, container cut outs
fig 57A, Mid-Process model
fig 134A, model, Structure models
fig 183A, Structural Analysis
fig 183B, Structural Analysis
fig 183C, Structural Analysis
fig 183D, Structural Analysis
fig 435A, Jury WTC
fig 435B, Jury WTC
fig 435C, Jury WTC
fig 435D, Jury WTC
fig 644A, Green Industry ?
fig 806A, Haus ohne eigenschaften
fig 317A, Lina Bo Bardi MASP under construction
fig 555A, Vynckier
fig 555B, Vynckier
fig 294A, Structure Niv +27 WTC
fig 244A, model, Maurício Muller and Jerónimo Bailat
fig 609A, Pavilion on Vynckier Site
fig 609B, Pavilion on Vynckier Site
fig 609C, Pavilion on Vynckier Site
fig 609D, Pavilion on Vynckier Site
fig 320A, exploded toren
fig 979A, geel tracé
fig 979B, geel tracé
fig 504A, TOWER
fig 504B, TOWER
fig 504C, TOWER
fig 504D, TOWER
fig 789A, Detail foto hoekprofiel – Lake Short Drive – Mies VDR
fig 608A, drawing, 01/04
fig 608B, drawing, 01/04
fig 608C, drawing, 01/04
fig 269A, Shanghai Tower
fig 432A, FINAL MODEL – JURY
fig 432B, FINAL MODEL – JURY
fig 432C, FINAL MODEL – JURY
fig 432D, FINAL MODEL – JURY
fig 400A, drawing, Connection to the floor
fig 240A, drawing, axonometry Marta and Luciana
fig 682A, Maquette Masterplan
fig 740A, photo, Jubileumlaan, construction soilmixwall
fig 204A, meetings, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 713A, structure proposition
fig 713B, structure proposition
fig 713C, structure proposition
fig 732A, model, Project, Manchester Two
fig 732B, drawing, Project, Manchester Two
fig 732C, drawing, Project, Manchester Two
fig 732D, drawing, Project, Manchester Two
fig 323A, Werfbezoek
fig 323B, Werfbezoek
fig 323C, Werfbezoek
fig 323D, Werfbezoek
fig 99A, Basic Concrete Prefab Construction, construction site
fig 99B, Basic Concrete Prefab Construction, Connection in the center of a diagonal buttress
fig 99C, Basic Concrete Prefab Construction, Top connection of a diagonal buttress
fig 99D, Basic Concrete Prefab Construction, Floor connection of a diagonal buttress
fig 614A, werfbezoek
fig 372A, cathédrale communale work documents
fig 372B, cathédrale communale work documents
fig 87A, Analysis structure De Porre, De Porre - floorplan
fig 87B, Analysis structure De Porre, De Porre - level +1
fig 87C, Analysis structure De Porre, Isometric view - surroundings
fig 87D, Analysis structure De Porre, Isometric view - structure
fig 963A, FINAL DESIGN
fig 963B, FINAL DESIGN
fig 986A, photo, 1/5000 identiteit vlekken (studie)
fig 986B, photo, 1/5000 identiteit vlekken (studie)
fig 661A, drawing, 27/05
fig 661B, drawing, 27/05
fig 661C, model, 27/05
fig 661D, drawing, 27/05
fig 928A, Design spaces
fig 928B, Design spaces
fig 928C, Design spaces
fig 946A, Gottfried Semper
fig 946B, Gottfried Semper
fig 834A, model, Facq building model section, roller bridge
fig 778A, photo, Eames Case Study House 8, Interior steel Truss, aesthetics of prefab
fig 974A, photo, Oosterweel verbinding, construction site
fig 974B, photo, Oosterweel verbinding, construction site
fig 974C, photo, Oosterweel verbinding, construction site
fig 948A, Analyse
fig 281A, werfbezoek – fout wapeningsstaal
fig 490A, test materiality – housing tower
fig 731A, Primary Circles_Model
fig 969A, Bedrijfsverzamelgebouw
fig 969B, Bedrijfsverzamelgebouw
fig 4A, photo, Hidden interior structure of the Tondelier sasholders, Interior of the Tondelier gasholders.
fig 4B, photo, Hidden interior structure of the Tondelier sasholders, Interior of the Tondelier gasholders.
fig 4C, photo, Hidden interior structure of the Tondelier sasholders, Interior of the Tondelier gasholders.
fig 4D, photo, Hidden interior structure of the Tondelier sasholders, Remaining structure Tondelier gasholder
fig 774A, The Cube
fig 283A, werfbezoek – logisitek verdeelverdiep
fig 283B, werfbezoek – logisitek verdeelverdiep
fig 467A, werf, Aldi. Sint-Niklaas
fig 467B, werf, Aldi. Sint-Niklaas
fig 300A, Basiliek van Koekelberg
fig 300B, Basiliek van Koekelberg
fig 464A, l’unionfaitlaforce
fig 781A, SUPERSTUDIO quaderna console tables for zanotta 1971
fig 988A, Viaduct als groene as
fig 486A, Structure Beekstraat
fig 509A, photo, A. Lavalléestraat
fig 509B, photo, A. Lavalléestraat
fig 509C, A. Lavalléestraat
fig 509D, photo, A. Lavalléestraat
fig 839A, ambiguous prouvé
fig 493A, model, Work in progress model CNC-site
fig 794A, bOb van Reeth, House Van Roosmalen, design sketch
fig 179A, Primary & New
fig 704A, Model
fig 142A, Urban design
fig 142B, Urban design
fig 803A, Briona 72
fig 517A, Marika-Alderton House – Glenn Murcutt
fig 536A, Rudolf Olgiati Column
fig 401A, model, CATHEDRALE COMMUNALE_DETAIL
fig 401B, model, CATHEDRALE COMMUNALE_DETAIL
fig 336A, Werkmaquette
fig 827A, Facade Pattyn Factory
fig 827B, Facade Pattyn Factory
fig 390A, Is It a Niemeyer?
fig 390B, Is It a Niemeyer?
fig 625A, model, De Schijf
fig 625B, model, De Schijf
fig 297A, WTC situation plan
fig 584A, drawing, VERTICAL FARMING WITH WATER PURIFICATION
fig 584B, photo, VERTICAL FARMING WITH WATER PURIFICATION
fig 86A, photo, Wittemolenstraat, Sint – Amandsberg, OLYMPUS DIGITAL CAMERA
fig 86B, Wittemolenstraat, Sint – Amandsberg, OLYMPUS DIGITAL CAMERA
fig 442A, George&Gilbert
fig 126A, URBAN FARM
fig 126B, URBAN FARM
fig 321A, plan woning
fig 40A, photo, Schuur Gentbrugge – Site
fig 40B, photo, Schuur Gentbrugge – Site
fig 40C, photo, Schuur Gentbrugge – Site
fig 40D, drawing, Schuur Gentbrugge – Site
fig 603A, stay safe
fig 710A, photo, Vynckier, Masterplan, Zicht op plein
fig 829A, Analyse EL beton – Detail dakspant 1
fig 786A, Isometrie – Lange & Esthers Houses – Mies VDR
fig 858A, Concrete stacking blocks ; variations in form and size
fig 494A, roof structure
fig 392A, model, Cathedrale Communale
fig 392B, model, Cathedrale Communale
fig 392C, model, Cathedrale Communale
fig 392D, model, Cathedrale Communale
fig 654A, accordeon raam detail
fig 97A, drawing, SITE & BUILDING ANALYSIS, Exploded view from different construction segments
fig 97B, SITE & BUILDING ANALYSIS, Detailed plan from below and above the ground
fig 600A, photo, Recycled U, Een manier van bouwen die de aarde zo min mogelijk belast. Als schakel tussen wonen en industrie die de site verbindt.
fig 600B, Recycled U
fig 339A, Detail of 1 Bligh Street
fig 646A, BOX ON STEEL
fig 961A, FINAL DESIGN
fig 607A, drawing, Vynckier
fig 607B, model, Vynckier
fig 607C, drawing, Vynckier
fig 838A, Becher Price
fig 572A, les 18/03
fig 572B, drawing, les 18/03
fig 572C, drawing, les 18/03
fig 100A, Steel Prefab Structure, construction site
fig 100B, Steel Prefab Structure, steel components joint
fig 100C, Steel Prefab Structure, steel components ridge joint
fig 100D, Steel Prefab Structure, steel components joint
fig 398A, Brewery visit
fig 398B, Brewery visit
fig 547A, photo, Site visit
fig 547B, photo, Site visit
fig 547C, photo, Site visit
fig 512A, model, END MODEL CNC
fig 512B, model, END MODEL CNC
fig 512C, END MODEL CNC
fig 397A, drawing, Isometrie gevel
fig 1002A, Beelden by Floris
fig 1002B, Beelden by Floris
fig 1002C, Beelden by Floris
fig 1002D, Beelden by Floris
fig 342A, Drawing of concrete silo
fig 862A, Circular Stacking ; Isometric drawing
fig 1012A, photo, Model 1/500 – 1/50 residential
fig 1012B, photo, Model 1/500 – 1/50 residential
fig 1012C, photo, Model 1/500 – 1/50 residential
fig 296A, WTC sections
fig 912A, FIETSBRUG WIEDAUWKAAI
fig 912B, FIETSBRUG WIEDAUWKAAI
fig 912C, FIETSBRUG WIEDAUWKAAI
fig 912D, FIETSBRUG WIEDAUWKAAI
fig 91A, MODEL #1, Interior wooden structure
fig 91B, MODEL #1, Interior wooden structure
fig 708A, photo, Vynckier, Masterplan, Maquette
fig 573A, Model of vision on masterplan, scale 1/1000
fig 211A, proces_12
fig 206A, drawing, proces_01
fig 119A, model, Test model of 3 05 2017
fig 216A, drawing, proces_13
fig 109A, photo, Japanese House, 1907, Wood construction by 'master carpenter' Nishida Isaburo
fig 488A, detail – wood & wood connection
fig 488B, detail – wood & wood connection
fig 488C, detail – wood & wood connection
fig 88A, MODEL #4
fig 758A, warehouse Zoutman ghent
fig 758B, warehouse Zoutman ghent
fig 154A, HAMAM – 17.04
fig 154B, HAMAM – 17.04
fig 711A, photo, Vynckier, Masterplan, Zicht op Manchester 1 en overdekte markt
fig 578A, model, Masterplan Vynckier
fig 667A, Masterplan Vynckier
fig 585A, Proposal Masterplan
fig 265A, John Hancock Center
fig 265B, John Hancock Center
fig 265C, John Hancock Center
fig 265D, John Hancock Center
fig 444A, Old vs. new
fig 579A, Mosterdfabriek Oudenaarde
fig 788A, Detail – Neue National Galerie – Mies VDR
fig 666A, Site section Terminal
fig 104A, drawing, supporting points in sports
fig 104B, supporting points in sports
fig 104C, supporting points in sports
fig 930A, Design model 1/100
fig 930B, Design model 1/100
fig 199A, sketch
fig 156A, photo, research structure, A
fig 1A, drawing, STEEL JOINT
fig 77A, Concrete building elements
fig 77B, Concrete building elements
fig 77C, Concrete building elements
fig 77D, Concrete building elements
fig 58A, Model #1
fig 58B, Model #1
fig 1003A, Busstation/Public Area Brusselsesteenweg
fig 1003B, Busstation/Public Area Brusselsesteenweg
fig 1003C, Busstation/Public Area Brusselsesteenweg
fig 1003D, Busstation/Public Area Brusselsesteenweg
fig 474A, vertrapping
fig 163A, Proces
fig 163B, drawing, Proces, detail exploded view
fig 163C, Proces
fig 163D, Proces
fig 261A, drawing, WTC_subtraction, WTC_subtraction
fig 261B, drawing, WTC_subtraction, WTC_axonometry
fig 114A, drawing, Existing structure
fig 114B, drawing, Existing structure, Axo
fig 114C, drawing, Existing structure, Section
fig 114D, photo, Existing structure
fig 202A, WALL LIMIT AXONOMETRIC
fig 730A, Primary Circles_structural system
fig 831A, photo, BERND AND HILLA BECHER FACQ
fig 629A, drawing, SECTION VYNCKIER
fig 567A, photo, Vynckier, Vynckier_Productiehal
fig 157A, model masterplan
fig 745A, STADSPARK VYNCKIER/ DE SCHIJF
fig 745B, STADSPARK VYNCKIER/ DE SCHIJF
fig 745C, STADSPARK VYNCKIER/ DE SCHIJF
fig 745D, STADSPARK VYNCKIER/ DE SCHIJF
fig 852A, MAISTER HEADQ., concrete pink architecture facade
fig 796A, bOb van Reeth, House Botte
fig 65A, test model: terraces &facade
fig 219A, drawing, proces_19
fig 136A, Sint – Amandsberg site, Gent. Detail Model, OLYMPUS DIGITAL CAMERA
fig 113A, drawing, Site Ijzerweglaan, City fabric
fig 113B, photo, Site Ijzerweglaan, Island cut off by the river Schelde and the E17 Viaduct
fig 113C, model, Site Ijzerweglaan
fig 113D, drawing, Site Ijzerweglaan, Different existing typologies
fig 841A, Bernd and Hilla Becher
fig 652A, drawing parochiezaal
fig 833A, drawing, section detail structure
fig 177A, Final model
fig 177B, Final model, C
fig 818A, axo, STORAGE FOR GRANULATES, NEXT TO CONCRETE PLANT
fig 649A, Building shed structure axonometric
fig 364A, Axo volumes
fig 364B, Axo volumes
fig 550A, Werf GENT
fig 188A, porto class 17
fig 428A, drawing, WTC remodel – section and facades
fig 428B, drawing, WTC remodel – section and facades
fig 428C, drawing, WTC remodel – section and facades
fig 428D, WTC remodel – section and facades
fig 754A, maquette
fig 754B, maquette
fig 754C, maquette
fig 754D, maquette
fig 674A, drawing, Langse snede
fig 409A, drawing, Detail
fig 1020A, photo, conceptual text
fig 951A, MODEL 1/500
fig 951B, MODEL 1/500
fig 951C, MODEL 1/500
fig 734A, Vynckier site, model
fig 982A, studio
fig 30A, photo, Silos, tanks & holders, Bottom-up construction
fig 30B, photo, Silos, tanks & holders, Interior view
fig 30C, photo, Silos, tanks & holders, Assembling the topcover
fig 30D, photo, Silos, tanks & holders, Surreal image
fig 187A, studio at carlos ramos’ pavillion
fig 984A, photo, Aldo Rossi
fig 160A, PROCES – AFBREKEN VS OPBOUW
fig 160B, PROCES – AFBREKEN VS OPBOUW
fig 670A, drawing, Masterplan
fig 997A, End Presentation, Model
fig 997B, End Presentation, Model
fig 997C, model, End Presentation, Model
fig 997D, model, End Presentation, Model
fig 684A, ingrepen op aanwezige context
fig 684B, ingrepen op aanwezige context
fig 971A, The Family – Isamu Noguchi (Photo by Ezra Stoller)
fig 691A, 3RROR cad to jpg
fig 196A, AXONOMETRIC
fig 627A, Vynckier 2
fig 635A, Shed structure with new volume
fig 635B, Shed structure with new volume
fig 808A, Ruff Collage | Admisol, Toonzaal + woning | Luc Van Landuyt | 1978
fig 255A, WTC pillar dimensions
fig 85A, photo, Analysis of the site, structure, detail, 2D build-up of steel truss
fig 85B, photo, Analysis of the site, structure, detail, isometric
fig 85C, photo, Analysis of the site, structure, detail, isometric
fig 85D, photo, Analysis of the site, structure, detail, isometric
fig 224A, studio
fig 14A, photo, Industrial project
fig 14B, photo, Industrial project
fig 14C, photo, Industrial project
fig 14D, photo, Industrial project
fig 139A, DT
fig 139B, DT
fig 733A, Primaru Circles_photos
fig 116A, drawing, Program, Freeing the site of cars by putting them in a tower of the same height as his modernistic neighbor.
fig 116B, photo, Program, Entering the city via the E17 viaduct
fig 116C, drawing, Program
fig 116D, photo, Program
fig 352A, LOFTS With gardens in double skin facade
fig 420A, reference
fig 420B, reference
fig 420C, reference, construction
fig 22A, photo, factory Gentbrugge – Site, wooden beam pattern
fig 22B, drawing, factory Gentbrugge – Site
fig 22C, drawing, factory Gentbrugge – Site
fig 22D, drawing, factory Gentbrugge – Site, masonry
fig 138A, Sint – Amandsberg site, Gent. Details
fig 93A, TECHNICAL DETAILS, Technical detail on the guiding rails
fig 93B, TECHNICAL DETAILS, Technical detail on the connection between the steel structure & foundation
fig 24A, photo, Steel truss, center piece
fig 24B, photo, Steel truss, Beam and truss connection
fig 314A, Conceptual thinking
fig 522A, photo, Analyse Swiss Sound Box – Peter Zumthor, Swiss Sound Box - Peter Zumthor
fig 913A, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 913B, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 913C, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 539A, Isomo uitsparing voor TPG betonvloer
fig 168A, Tempory billboard on tempory structure
fig 487A, Work in progress – Dauwstraat, Processed with VSCO with preset
fig 47A, drawing, Every Big Box has its structure
fig 47B, drawing, Every Big Box has its structure
fig 262A, Opbouw maquette S1:50 WTC
fig 288A, Voorstel programma toren
fig 587A, Vynckier Site, first proposal, scheme
fig 419A, waffle slab
fig 419B, waffle slab
fig 349A, Scheme structures silo
fig 349B, Scheme structures silo
fig 802A, Briona 72
fig 220A, drawing, proces_20
fig 304A, work documents
fig 840A, Becher prize
fig 840B, Becher prize
fig 1022A, drawing, conceptual scheme
fig 557A, section engine room archive
fig 863A, Circular Stacking ; Stacked roof detail
fig 727A, Vynckier Saw Shedroof
fig 727B, Vynckier Saw Shedroof
fig 727C, Vynckier Saw Shedroof
fig 634A, shed structure
fig 634B, shed structure
fig 360A, Structure between diving tank and WTC 2tower
fig 541A, Bambow bridge – Atelier Lai
fig 266A, WTC Massive Model
fig 559A, Machinekamer Vynckier site
fig 837A, BSF-Connection
fig 259A, model detail
fig 458A, Marc-Antoine Laugier ‘Essay on Architecture’
fig 458B, Marc-Antoine Laugier ‘Essay on Architecture’
fig 396A, drawing, Final plans
fig 799A, analysis facade
fig 307A, STRUCTURE WTC
fig 307B, STRUCTURE WTC
fig 39A, drawing, Japan wood connection in chamonix
fig 225A, drawing, proces_24
fig 626A, drawing, Section of a Tulou, traditional housing in China
fig 626B, drawing, Section of a Tulou, traditional housing in China
fig 606A, drawing, Vynckier
fig 606B, model, Vynckier
fig 606C, drawing, Vynckier
fig 26A, photo, Lumat Site Gent
fig 26B, photo, Lumat Site Gent
fig 26C, photo, Lumat Site Gent
fig 489A, NG17 – preliminary design 06/05 – hostel + offices
fig 489B, NG17 – preliminary design 06/05 – hostel + offices
fig 192A, sketch
fig 29A, model, STEKO – Building Blocks, The basic elements of the STEKO® building system
fig 29B, photo, STEKO – Building Blocks
fig 29C, photo, STEKO – Building Blocks
fig 695A, Plan / section Manchester
fig 695B, Plan / section Manchester
fig 695C, Plan / section Manchester
fig 650A, Building shed structure new addition
fig 483A, Stut-opties
fig 500A, Section A110
fig 427A, WTC remodel – a tower can have a lot of different plans
fig 427B, WTC remodel – a tower can have a lot of different plans
fig 427C, WTC remodel – a tower can have a lot of different plans
fig 427D, WTC remodel – a tower can have a lot of different plans
fig 631A, Masterplan level 1
fig 292A, WTC NIV + 27
fig 27A, drawing, Types of steel trusses
fig 741A, drawing, STADSPARK VYNCKIER/ DE SCHIJF
fig 741B, STADSPARK VYNCKIER/ DE SCHIJF
fig 741C, STADSPARK VYNCKIER/ DE SCHIJF
fig 741D, STADSPARK VYNCKIER/ DE SCHIJF
fig 377A, Wooden stairs in steel structure
fig 822A, THE SITE, Belgian lust for construction
fig 664A, Maquette Terminal
fig 664B, Maquette Terminal
fig 664C, Maquette Terminal
fig 664D, Maquette Terminal
fig 610A, Masterplan 25/03 & 1/04 2020
fig 481A, detail – concrete & wood connection
fig 121A, Pictures Model
fig 121B, Pictures Model
fig 577A, Vynckier 5
fig 860A, WIEDAUWKAAI ; 1/500 model
fig 860B, WIEDAUWKAAI ; 1/500 model
fig 693A, Axonometry of fragment CONNECTING GRID
fig 693B, Axonometry of fragment CONNECTING GRID
fig 155A, drawing, ISO
fig 394A, model, Final scale model
fig 337A, Ingang wtc via kern
fig 899A, model, I-joist factory
fig 899B, I-joist factory
fig 899C, I-joist factory
fig 393A, model, Cathedrale Communale
fig 393B, model, Cathedrale Communale
fig 393C, model, Cathedrale Communale
fig 393D, model, Cathedrale Communale
fig 237A, final axonometry
fig 298A, WTC axo concepts
fig 770A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 747A, photo, Vynckier 2, Principe, Maquette
fig 433A, finaal model
fig 433B, finaal model
fig 433C, finaal model
fig 178A, model, Final model, B, 1:50
fig 73A, drawing, Construction details of the warehouse on site
fig 73B, drawing, Construction details of the warehouse on site
fig 73C, drawing, Construction details of the warehouse on site
fig 845A, Hannelore Van Dijck – Primary Talks
fig 92A, MODEL #2, Cross-section model of the gasholder
fig 92B, MODEL #2, Cross-section model of the gasholder
fig 92C, MODEL #2, Cross-section model of the gasholder
fig 992A, Viaduct Gentbrugge
fig 823A, photo, Visit Building Nachtergaele, back facade, Steel, old and new, renovation
fig 823B, photo, Visit Building Nachtergaele, Canopy, conncection, structure, wood, steel, detail
fig 823C, photo, Visit Building Nachtergaele, Montage, original plans
fig 823D, photo, Visit Building Nachtergaele, Facade, floor, conncetion, 3D, lost form, steel, concrete
fig 308A, Vertical Garden
fig 701A, De Nieuwe Vynckier – Incubator – Section
fig 999A, Foto opdracht
fig 999B, Foto opdracht
fig 999C, Foto opdracht
fig 999D, Foto opdracht
fig 653A, primary arcs
fig 980A, photo, Site visit W6
fig 980B, photo, Site visit W6
fig 980C, photo, Site visit W6
fig 678A, 27/05
fig 678B, 27/05
fig 678C, 27/05
fig 678D, drawing, 27/05
fig 687A, research existing structure
fig 152A, Reference: ALEXANDER BRODSKY 95 DEGREES RESTAURANT
fig 152B, photo, Reference: ALEXANDER BRODSKY 95 DEGREES RESTAURANT
fig 152C, photo, Reference: ALEXANDER BRODSKY 95 DEGREES RESTAURANT
fig 527A, drawing, Section of Art & Architecture Building
fig 570A, Masterplan
fig 943A, Analyse Loods
fig 943B, model, Analyse Loods
fig 943C, drawing, Analyse Loods
fig 943D, drawing, Analyse Loods
fig 218A, drawing, proces_18
fig 588A, Vynckier Site, first proposal, sketches
fig 440A, mapping trough the lens of G&G
fig 69A, models
fig 590A, masterplan
fig 923A, Design Sections
fig 454A, George&Gilbert
fig 68A, collage: walls around the field
fig 915A, Analyse EL beton – Foto’s Maquette
fig 915B, Analyse EL beton – Foto’s Maquette
fig 915C, Analyse EL beton – Foto’s Maquette
fig 915D, Analyse EL beton – Foto’s Maquette
fig 16A, photo, SITE VISIT, The large wooden beams ready to be installed.
fig 16B, photo, SITE VISIT, Prefabricated elements are fixed on the columns.
fig 16C, photo, SITE VISIT, Steel elements where the secondary wooden beams will be fixed on.
fig 16D, photo, SITE VISIT, The building of the extension of the store of Aveve.
fig 669A, Aanzicht westgevel
fig 170A, photo, REFERENCES
fig 170B, REFERENCES
fig 170C, REFERENCES
fig 170D, REFERENCES
fig 528A, Study of the capital
fig 354A, WERKMAQUETTE_3.3_BUREN
fig 767A, Teatro del Mondo, Aldo Rossi
fig 856A, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856B, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 856C, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856D, photo, Final Jury Brecht De Roose & Wannes De Brouwer
fig 643A, MASTERPLAN VYNCKIER
fig 515A, space and event
fig 513A, Structural analysis, AFASIA, P. FLammer
fig 456A, Enclosed house
fig 813A, photo, Autographe, Teamwork with Jill Gielen.
fig 813B, photo, Autographe, Teamwork with Jill Gielen.
fig 813C, photo, Autographe, Teamwork with Jill Gielen.
fig 813D, photo, Autographe, Teamwork with Jill Gielen.
fig 71A, photo, axonometric view on docks site
fig 12A, photo, Industrial Structure
fig 12B, photo, Industrial Structure
fig 239A, PHOTO
fig 672A, drawing, Dwarse snede
fig 318A, Axonometric WTC
fig 63A, Model tests
fig 61A, roof on/between containers
fig 61B, roof on/between containers
fig 61C, roof on/between containers
fig 61D, roof on/between containers
fig 213A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 944A, model, JURY 26/05/’21
fig 944B, model, JURY 26/05/’21
fig 944C, model, JURY 26/05/’21
fig 944D, drawing, JURY 26/05/’21
fig 715A, photo, Vynckier 2, Vynckier 2, Architectuurplan, Gelijkvloers
fig 1010A, model, Living Above The Road 12-01-22
fig 1010B, model, Living Above The Road 12-01-22
fig 1010C, model, Living Above The Road 12-01-22
fig 1010D, model, Living Above The Road 12-01-22
fig 729A, model, Project, The Modern Tulou
fig 729B, model, Project, The Modern Tulou
fig 729C, model, Project, The Modern Tulou
fig 729D, model, Project, The Modern Tulou
fig 953A, onderzoek structuur – vorm – werking
fig 953B, onderzoek structuur – vorm – werking
fig 102A, drawing, club house
fig 977A, Fotoreeks
fig 977B, Fotoreeks
fig 977C, Fotoreeks
fig 977D, Fotoreeks
fig 958A, FINAL DESIGN
fig 750A, photo, Vynckier 2, Principe authentieke en groene gevel, Maquette
fig 242A, axonometric alejandra and joao
fig 316A, Notre Dame
fig 502A, Axonometric NG17
fig 299A, WTC – plan section
fig 998A, End Presentation, Site Model
fig 284A, werfbezoek – kraan in liftschacht
fig 765A, Piazza dell’Anfiteatro
fig 765B, Piazza dell’Anfiteatro
fig 601A, drawing, voorstellen inplanting
fig 601B, voorstellen inplanting
fig 622A, drawing, Construction in wood for Manchester
fig 540A, Bambow bridge – Atelier Lai
fig 540B, Bambow bridge – Atelier Lai
fig 143A, structural color
fig 143B, structural color
fig 952A, MODEL 1/100
fig 952B, MODEL 1/100
fig 952C, MODEL 1/100
fig 952D, MODEL 1/100
fig 236A, model,Jukyung & Uk
fig 659A, Concrete Disc building
fig 275A, Ceiling Infrastructure plan
fig 671A, model, Schijf x Manchester
fig 671B, Schijf x Manchester
fig 671C, Schijf x Manchester
fig 671D, Schijf x Manchester
fig 268A, Knights of Columbus
fig 268B, Knights of Columbus
fig 268C, Knights of Columbus
fig 338A, Maquette 1/50
fig 639A, Staal-beton kolom
fig 639B, Staal-beton kolom
fig 994A, Hangend gebouw onder viaduct
fig 994B, Hangend gebouw onder viaduct
fig 994C, Hangend gebouw onder viaduct
fig 994D, Hangend gebouw onder viaduct
fig 270A, Willis Tower
fig 270B, Willis Tower
fig 597A, Masterplan 25/03
fig 15A, photo, SILOS, TANKS & HOLDERS, Rotating the panels allows vertical forces to be guided down
fig 15B, drawing, SILOS, TANKS & HOLDERS, Basic dimensions of a cold rolled steel silo panel
fig 901A, I-joist factory
fig 353A, Vertical Garden WTC, “Hanging the stairs” Sketches
fig 232A, proces_33
fig 169A, research / site model
fig 169B, research / site model
fig 169C, research / site model
fig 553A, Section Store Shed
fig 1009A, photo, Bernard Tshumi, Rotterdam Railway Tunnel Site via Event Cities
fig 975A, The courtyard
fig 972A, drawing, Renaat Braem, ideology of reconstruction 1950
fig 972B, drawing, Renaat Braem, ideology of reconstruction 1950
fig 972C, photo, Renaat Braem, ideology of reconstruction 1950
fig 162A, REFERENCE – ALDO VAN EYCK SONSBEEK PAVILJOEN
fig 332A, WERKMAQUETTE_3.0
fig 978A, Kaduk…Kadukaduk…kadukaduk…kadukaduk…
fig 857A, Analyse
fig 857B, model, Analyse
fig 857C, Analyse
fig 274A, Welkom in de Noord-wijk
fig 274B, Welkom in de Noord-wijk
fig 274C, Welkom in de Noord-wijk
fig 274D, Welkom in de Noord-wijk
fig 54A, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54B, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54C, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54D, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 431A, CATHEDRALE COMMUNALE_JURY
fig 431B, CATHEDRALE COMMUNALE_JURY
fig 431C, CATHEDRALE COMMUNALE_JURY
fig 431D, CATHEDRALE COMMUNALE_JURY
fig 780A, drawing, Eames Case Study House 8, Axo deciphering the different constuctive elements inside the Eames House.
fig 785A, Mies van der Rohe – Crown Hall – Isometrie
fig 151A, photo, Site ‘Huidevetterken’, L-profile column
fig 151B, photo, Site ‘Huidevetterken’, Steel detail
fig 783A, Mies van der Rohe – Farnsworth House
fig 694A, Axonometries CONNECTING GRID
fig 694B, Axonometries CONNECTING GRID
fig 208A, drawing, proces_09
fig 280A, werfbezoek – ultiem grid 740 x 740
fig 280B, werfbezoek – ultiem grid 740 x 740
fig 327A, WTC – model
fig 327B, WTC – model
fig 79A, drawing, detail construction garage box, construction detail precast concrete elements
fig 569A, Vynckier Site masterplan sketch
fig 53A, visit construction site
fig 53B, visit construction site
fig 53C, visit construction site
fig 739A, photo, Strabag – Stapelplein Gent, Hole for crane inside basement
fig 416A, drawing, proces
fig 416B, proces
fig 989A, Walkway
fig 989B, Walkway
fig 989C, Walkway
fig 1015A, drawing, Urban plan 1/5000
fig 175A, drawing, Project BOMA
fig 175B, drawing, Project BOMA
fig 175C, drawing, Project BOMA
fig 175D, drawing, Project BOMA
fig 257A, WTC beams
fig 566A, bouw fabriek schoorsteen
fig 566B, bouw fabriek schoorsteen
fig 566C, bouw fabriek schoorsteen
fig 108A, photo, Gent Voorhaven PortService Warehouses, Large Warehouse facades
fig 108B, photo, Gent Voorhaven PortService Warehouses, small warehouse
fig 108C, photo, Gent Voorhaven PortService Warehouses, Bombed structure inside
fig 108D, photo, Gent Voorhaven PortService Warehouses, Bombed structure old warehouses
fig 697A, 1 UNIT
fig 697B, 1 UNIT
fig 973A, bOb Van Reeth, House Botte, 1968-70
fig 476A, KANAL review KUL UCL ULB
fig 476B, KANAL review KUL UCL ULB
fig 476C, KANAL review KUL UCL ULB
fig 696A, Axonometries CONNECTING GRID
fig 696B, Axonometries CONNECTING GRID
fig 425A, first test extra facade
fig 507A, Final maquette
fig 507B, Final maquette
fig 507C, photo, Final maquette
fig 645A, The Nantes Saint-Nazaire Higher School of Fine Arts
fig 800A, Granulate Storage Shed, Axo
fig 306A, Site Visit 2
fig 306B, Site Visit 2
fig 306C, Site Visit 2
fig 306D, Site Visit 2
fig 900A, I-joist factory
fig 388A, CATHEDRALE COMMUNALE_DETAILS
fig 922A, Design isometrie
fig 542A, Aansluiting staalframebouw
fig 633A, Idea Superstudio on ConnectingGrid
fig 987A, photo, Construction site
fig 987B, photo, Construction site
fig 987C, photo, Construction site
fig 987D, photo, Construction site
fig 72A, drawing, Structure of the big warehouse on docks site
fig 621A, Masterplan Model 2
fig 955A, structuur – detail knoop
fig 84A, photo, Study models, Model 1/25
fig 84B, photo, Study models, Model 1/25
fig 84C, photo, Study models, Model 1/25
fig 776A, photo, Eames case study house 8, Eames case study house No.8, exterior
fig 776B, photo, Eames case study house 8, Eames case study house No. 8, Bare steel frame
fig 819A, Fotoreportage context
fig 7A, drawing, types of compound beam
fig 514A, Werfbeeld 51 Rue Raynouard – Perret
fig 205A, meetings, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 282A, werfbezoek – zettingsvoegen
fig 429A, drawing, WTC remodel – detail of roof of rooftop extension
fig 429B, drawing, WTC remodel – detail of roof of rooftop extension
fig 429C, drawing, WTC remodel – detail of roof of rooftop extension
fig 429D, drawing, WTC remodel – detail of roof of rooftop extension
fig 596A, Masterplan Model 2
fig 277A, Steel connections WTC +24
fig 277B, Steel connections WTC +24
fig 277C, Steel connections WTC +24
fig 277D, Steel connections WTC +24
fig 842A, Chernobyl radar
fig 45A, drawing, shipping container
fig 45B, drawing, shipping container
fig 45C, drawing, shipping container
fig 689A, Modelshots CONNECTING GRID
fig 689B, Modelshots CONNECTING GRID
fig 689C, model, Modelshots CONNECTING GRID
fig 689D, Modelshots CONNECTING GRID
fig 37A, drawing, corner of the sport fence
fig 821A, SUPERSTUDIO Le dodici Città Ideali 1971
fig 683A, section
fig 683B, section
fig 683C, section
fig 766A, drawing, Città Analoga, Aldo Rossi
fig 850A, Structure analysis Erfoeddepot Trezoor, Kortrijk
fig 742A, STADSPARK VYNCKIER/ DE SCHIJF
fig 742B, STADSPARK VYNCKIER/ DE SCHIJF
fig 742C, STADSPARK VYNCKIER/ DE SCHIJF
fig 742D, STADSPARK VYNCKIER/ DE SCHIJF
fig 938A, Luminus
fig 350A, How To Become A Niemeyer
fig 74A, model, MODEL – WASSERIJ DER VLAANDEREN, WASSERIJ DER VLAANDEREN
fig 561A, Front façade and back façade of building 4 and 4A, Vynckier site
fig 828A, Analyse EL beton – total overvieuw
fig 98A, Quick steel
fig 365A, Bochten testen
fig 365B, Bochten testen
fig 365C, Bochten testen
fig 752A, ontwerpschetsen
fig 752B, ontwerpschetsen
fig 752C, ontwerpschetsen
fig 752D, ontwerpschetsen
fig 932A, model, Final design Model 1/100
fig 932B, model, Final design Model 1/100
fig 932C, model, Final design Model 1/100
fig 932D, model, Final design Model 1/100
fig 581A, Proposal Masterplan Vynckier
fig 399A, drawing, New vs old structure, steel vs concrete
fig 795A, drawing, bOb Van Reeth, Circle vs Square, The basic operation in the design is playing the circle and parts of the circle off against the equality, the peace and quiet, and the infinite expandability and divisibility of the square and the grid. Because every square is otherwise perfectly divisible and fits in without a different figure ever being created. A square certainly does centre but at thesame time the four sides decentre and orient, the sides are just as strong as the cenre. A circle on the other hand radiates but centres to a much greater degree, detaches itself, and never shares its borderline with a second circle. It is enough to draw a circle in or around a square, or to construct a circle from an angle of a square, to obtain a dynamic heterogenous division of the plane with centred and non centred, single and complex planes, regular primary figures and secondary spaces, insides and outsides, direction.
fig 637A, Masterplan model
fig 801A, photo, storage for granulates, next to concrete plant, facade
fig 801B, drawing, storage for granulates, next to concrete plant, section
fig 312A, A Cut Into Our Model
fig 312B, A Cut Into Our Model
fig 312C, A Cut Into Our Model
fig 544A, Bijgebouw Manchester 1
fig 426A, FINAL Model WTC
fig 426B, FINAL Model WTC
fig 426C, FINAL Model WTC
fig 173A, model, model analyse
fig 714A, photo, Vynckier 2, Vynckier 2, Primaire en secundaire structuur
fig 241A, axonometric
fig 241B, axonometric
fig 330A, CONCEPTBEELD_1
fig 656A, Parochiezaal
fig 656B, Parochiezaal
fig 445A, Adjacent
fig 272A, Zuidertoren
fig 272B, Zuidertoren
fig 272C, Zuidertoren
fig 6A, drawing, Drawing connection of steel structure
fig 6B, drawing, Drawing connection of steel structure
fig 736A, drawing, Tulou, reference - China
fig 736B, model, Tulou, rammed earth and wood structure
fig 736C, model, Tulou, rammed earth and wood structure
fig 736D, model, Tulou, structure
fig 381A, ANALYSIS WTC
fig 381B, ANALYSIS WTC
fig 485A, Structure LaVallée
fig 830A, drawing, ISO_Facq
fig 658A, future for the fireplace
fig 753A, detail schetsen
fig 753B, detail schetsen
fig 753C, detail schetsen
fig 753D, detail schetsen
fig 763A, Palazzo della Ragione
fig 763B, Palazzo della Ragione
fig 38A, drawing, pergola without roof connection
fig 526A, drawing, Sketch of Art & Architecture Building
fig 335A, REFERENTIE_3
fig 459A, House Botte – bOb Van Reeth
fig 412A, analyse plint
fig 412B, analyse plint
fig 412C, drawing, analyse plint
fig 412D, analyse plint
fig 313A, Experience the real stuff
fig 313B, Experience the real stuff
fig 313C, Experience the real stuff
fig 146A, Visit Industrial Natural stone factory
fig 146B, Visit Industrial Natural stone factory
fig 611A, drawing, Masterplan CONNECTING GRID 1.0, scale 1/1000
fig 67A, College Football Hall of Fame, Robert Venturi & Denise Scott Brown
fig 67B, College Football Hall of Fame, Robert Venturi & Denise Scott Brown
fig 246A, Axonometria
fig 31A, photo, Silos, tanks & holders, Fully assembled
fig 31B, photo, Silos, tanks & holders, Positioning the different panels
fig 31C, photo, Silos, tanks & holders, Pre-asssembly of the different panels
fig 782A, Detail – Lake Short Drive – Mies VDR
fig 303A, atelier
fig 346A, Site visite Orsi Academy
fig 346B, Site visite Orsi Academy
fig 346C, Site visite Orsi Academy
fig 346D, Site visite Orsi Academy
fig 190A, meetings
fig 452A, Enclosed houses
fig 452B, photo, Enclosed houses
fig 408A, drawing, Sfeer
fig 408B, drawing, Sfeer
fig 408C, drawing, Sfeer
fig 768A, Erfgoeddepot Trezoor, Kortrijk
fig 505A, drawing, DAUWSTRAAT DETAILSECTION
fig 375A, STRUCTUREMODEL_SERVICEFLATS_1
fig 375B, STRUCTUREMODEL_SERVICEFLATS_1
fig 165A, analysing site Gents Bakkershuis
fig 543A, Constructie detail werfbezoek
fig 9A, photo, Getting some help, Getting some help.
fig 94A, INDUSTRIAL CONSTRUCTION SITE, Prefab structure
fig 94B, INDUSTRIAL CONSTRUCTION SITE, Two truss crossing
fig 94C, INDUSTRIAL CONSTRUCTION SITE, Cross bracing of the structure
fig 149A, Sketches
fig 149B, Sketches
fig 76A, Project Kievit
fig 76B, Project Kievit
fig 76C, Project Kievit
fig 76D, Project Kievit
fig 174A, drawing, current structure analyse
fig 764A, Analyse Robert Venturi en Denise Scott Brown, Sainsbury Wing National Gallery
fig 764B, Analyse Robert Venturi en Denise Scott Brown, Sainsbury Wing National Gallery
fig 764C, Analyse Robert Venturi en Denise Scott Brown, Sainsbury Wing National Gallery
fig 115A, photo, Site visit
fig 115B, photo, Site visit
fig 115C, photo, Site visit
fig 115D, photo, Site visit
fig 133A, photo, Final urban model
fig 133B, Final urban model
fig 133C, model, Final urban model
fig 217A, drawing, proces_17
fig 129A, Pictures site Nieuwevaart
fig 129B, Pictures site Nieuwevaart
fig 805A, Haus ohne eigenschaften
fig 924A, Design facades
fig 668A, Structuur Manchester 2
fig 940A, Analyse Robert Venturi en Denise Scott Brown
fig 940B, Analyse Robert Venturi en Denise Scott Brown
fig 940C, Analyse Robert Venturi en Denise Scott Brown
fig 940D, Analyse Robert Venturi en Denise Scott Brown
fig 630A, OFFICE – RTS Building
fig 630B, OFFICE – RTS Building
fig 34A, model, Lignatur floor/ roof element, Lignatur floor element - hollow core slab
fig 34B, model, Lignatur floor/ roof element, Lignatur floor element - Detail possibilties ducts
fig 254A, The ramp
fig 254B, The ramp
fig 254C, The ramp
fig 533A, drawing, Magney House – Glenn Murcutt – section
fig 533B, drawing, Magney House – Glenn Murcutt – section
fig 80A, drawing, Site analyse
fig 80B, drawing, Site analyse
fig 80C, drawing, Site analyse
fig 80D, drawing, Site analyse
fig 75A, model, Construction details of a car dealers garage, Joint of a column, primary and secondary roof beams.
fig 75B, drawing, Construction details of a car dealers garage, Joint of a column, primary and secondary roof beams.
fig 75C, drawing, Construction details of a car dealers garage, Connection of the structure of the two halls.
fig 549A, Parkeergebouw Ledeberg, Nieuw Parkeergebouw Ledeberg
fig 716A, axo existing structure
fig 867A, model, THE RESULT, model of the site 1/500 with Alexandre Moens
fig 867B, THE RESULT, model of the site 1/500 with Alexandre Moens
fig 411A, Torre Velasca
fig 411B, Torre Velasca
fig 909A, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 909B, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 909C, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 909D, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 359A, Structure underneath diving tank
fig 628A, fake Mies
fig 628B, fake Mies
fig 983A, photo, Blockbebauung Paltaufgasse, Vienna, Austria, 1997 via © Werk, Bauen + Wohnen 1998/3
fig 983B, photo, Blockbebauung Paltaufgasse, Vienna, Austria, 1997 via © Werk, Bauen + Wohnen 1998/3
fig 253A, Working session
fig 771A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 506A, drawing, PICARDSTRAAT DETAILSECTION
fig 854A, POCO LOCO FACTORY
fig 387A, CATHEDRALE COMMUNALE_ISOMETRIC
fig 450A, Collage Gilbert and Georges
fig 919A, EL Beton – model 1/20
fig 78A, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78B, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78C, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78D, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 417A, sfeer
fig 127A, model, Final
fig 127B, drawing, Final
fig 127C, drawing, Final
fig 434A, MAQUETTE_WTC_ONTWERP
fig 434B, MAQUETTE_WTC_ONTWERP
fig 434C, MAQUETTE_WTC_ONTWERP
fig 434D, MAQUETTE_WTC_ONTWERP
fig 184A, Design
fig 184B, Design
fig 184C, Design
fig 184D, Design
fig 475A, Wachtstaven
fig 719A, photo, Vynckier 2, Vynckier 2, Snede
fig 195A, visits
fig 548A, Parkeergebouw Ledeberg, Nieuw Parkeergebouw Ledeberg
fig 580A, drawing, Drawing proposal Masterplan
fig 370A, Glass corner “box” vertical garden
fig 291A, WTC I: Axo op 2 verdiepen
fig 23A, photo, Poco Loco – Fully automatic warehouse, View from the street
fig 23B, photo, Poco Loco – Fully automatic warehouse, section build on the ground
fig 23C, photo, Poco Loco – Fully automatic warehouse, connection of 2 different sections
fig 23D, photo, Poco Loco – Fully automatic warehouse, reinforcement for windloads
fig 931A, Design model 1/50
fig 931B, Design model 1/50
fig 402A, drawing, Drawing of buildup wintergarden
fig 619A, drawing, Vynckier
fig 619B, drawing, Vynckier
fig 619C, drawing, Vynckier
fig 619D, drawing, Vynckier
fig 861A, Circular Stacking ; 1/100 model
fig 861B, Circular Stacking ; 1/100 model
fig 861C, Circular Stacking ; 1/100 model
fig 861D, Circular Stacking ; 1/100 model
fig 290A, Reference: Standard Bank Centre – Hentrich, Petschnigg & Partners ( 1970)
fig 324A, werfbezoek
fig 324B, werfbezoek
fig 324C, werfbezoek
fig 495A, A110 – 2M wide cohousing
fig 558A, inplantingsmaquette, burst
fig 1013A, drawing, Plan 1/500 mobility hub
fig 991A, Unite d’habitation
fig 477A, Review Primary structure – Kanal Brussels, Processed with VSCO with m5 preset
fig 1007A, Bas Princen
fig 615A, werfbezoek
fig 147A, model, ‘HUIDEVETTERKEN’ werkmaquette
fig 147B, drawing, ‘HUIDEVETTERKEN’ werkmaquette, existing situation plan
fig 147C, model, ‘HUIDEVETTERKEN’ werkmaquette
fig 927A, Vertical farming
fig 927B, Vertical farming
fig 194A, meetings
fig 301A, WTC Plan/Section Studentdorms
fig 571A, model, Masterplan Vynckiersite
fig 571B, model, Masterplan Vynckiersite
fig 20A, drawing, stabilizing structural systems, different ways to stabilize structure
fig 743A, STADSPARK VYNCKIER/ DE SCHIJF
fig 743B, STADSPARK VYNCKIER/ DE SCHIJF
fig 743C, STADSPARK VYNCKIER/ DE SCHIJF
fig 964A, interieur render voorontwerp
fig 1008A, Superstudio
fig 773A, Mushroom farm
fig 516A, Column Peter Märkli
fig 153A, DRAWINGS
fig 153B, DRAWINGS
fig 153C, DRAWINGS
fig 153D, DRAWINGS
fig 1014A, photo, Plan 1/500 residential
fig 865A, THE ANALYSIS, Oostmalle Delften
fig 865B, THE ANALYSIS, Oostmalle Delften
fig 865C, drawing, THE ANALYSIS, Oostmalle Delften
fig 865D, THE ANALYSIS, Oostmalle Delften
fig 243A, model, Luciana Ligeiro and Marta Faustino
fig 728A, primary structure
fig 728B, primary structure
fig 728C, primary structure
fig 728D, primary structure
fig 853A, INTERBETON
fig 189A, MAIN PLAN
fig 735A, drawing, Manchester, concept apartments and stores
fig 735B, drawing, Manchester, concept structure
fig 735C, drawing, Manchester, concept offices
fig 735D, drawing, Manchester, entrance
fig 1001A, Jury in progress
fig 1001B, Jury in progress
fig 1001C, Jury in progress
fig 1001D, Jury in progress
fig 482A, test housing tower
fig 705A, photo, Vynckier, Masterplan, Vooraanzicht maquette
fig 981A, Velsertunnel (A22) Ventilation Towers, NL
fig 636A, circular building
fig 636B, circular building
fig 660A, working in quarantaine
fig 574A, Sketch of masterplan, scale 1/1000
fig 128A, drawing, Final drawings
fig 128B, model, Final drawings
fig 128C, drawing, Final drawings
fig 128D, drawing, Final drawings
fig 554A, Combination industry and living, Biestebroek quay – Plusoffice Architects & Collectif WRKSHP
fig 554B, Combination industry and living, Biestebroek quay – Plusoffice Architects & Collectif WRKSHP
fig 554C, Combination industry and living, Biestebroek quay – Plusoffice Architects & Collectif WRKSHP
fig 424A, northern quarter voyeurism, An MQ-9 Reaper and MQ-1 Predator sit on display in brand new Hangar three at Holloman Air Force Base, N.M.
fig 424B, northern quarter voyeurism
fig 51A, photo, Project Nonnemeersstraat, Ghent
fig 51B, drawing, Project Nonnemeersstraat, Ghent
fig 51C, drawing, Project Nonnemeersstraat, Ghent
fig 51D, drawing, Project Nonnemeersstraat, Ghent
fig 52A, CONSTRUCTION SITE
fig 439A, hopvandenbrandenstraat.
fig 439B, hopvandenbrandenstraat.
fig 439C, hopvandenbrandenstraat.
fig 247A, WTC pattern of the pillars
fig 642A, PALACE OF LABOUR, TURIN, 1961
fig 124A, photo, Construction clt
fig 602A, Superstudio, Adolfo Natalini, Monumento Continuo, 1969
fig 329A, WERKMAQUETTE_1-2
fig 329B, WERKMAQUETTE_1-2
fig 238A, AXONOMETRIC, Jukyung & Uk
fig 148A, Inversion of the field
fig 917A, industrial buildings, grafted onto rammed earth wall with common functions
fig 917B, industrial buildings, grafted onto rammed earth wall with common functions
fig 917C, industrial buildings, grafted onto rammed earth wall with common functions
fig 917D, industrial buildings, grafted onto rammed earth wall with common functions
fig 227A, proces_29
fig 182A, drawing, Masterplan final site gentbrugge
fig 182B, drawing, Masterplan final site gentbrugge, coworking
fig 182C, drawing, Masterplan final site gentbrugge
fig 182D, photo, Masterplan final site gentbrugge
fig 455A, depotdesign
fig 295A, Civic Center – SOM
fig 947A, Analyse
fig 947B, Analyse
fig 947C, Analyse
fig 947D, Analyse
fig 530A, Werf, Temporary school of Villejuif, Jean Prouvé
fig 11A, photo, FC Muide
fig 11B, photo, FC Muide
fig 11C, photo, FC Muide
fig 466A, belibel
fig 641A, Masterplan
fig 60A, photo, SIMPLE CONSTRUCTION
fig 60B, SIMPLE CONSTRUCTION
fig 60C, SIMPLE CONSTRUCTION
fig 508A, model, DAUWSTRAAT MODEL
fig 508B, DAUWSTRAAT MODEL
fig 508C, DAUWSTRAAT MODEL
fig 508D, DAUWSTRAAT MODEL
fig 448A, wonen VS industrie
fig 777A, photo, Eames Case Study House 8
fig 389A, CATHEDRALE COMMUNALE_PERSPECTIVE
fig 158A, Model of the Site, The final position of the new added buildings.
fig 158B, Model of the Site, Model without any of the existing structures.
fig 726A, stil leven de werf
fig 726B, stil leven de werf
fig 726C, stil leven de werf
fig 726D, stil leven de werf
fig 49A, Model #2
fig 825A, Structural Plan Pattyn Factory
fig 720A, photo, Vynckier 2, Vynckier 2, Schets inkom
fig 918A, Design model 1/100
fig 918B, Design model 1/100
fig 918C, Design model 1/100
fig 686A, floorplan
fig 686B, floorplan
fig 686C, floorplan
fig 647A, New Shed structure
fig 647B, New Shed structure
fig 556A, Model Engine Room
fig 556B, Model Engine Room
fig 496A, photo, maquettefoto A. Lavalléestraat
fig 941A, model, Analyse Picobello
fig 941B, model, Analyse Picobello
fig 941C, Analyse Picobello
fig 463A, drawing, hopvandenbrandenstraat.
fig 176A, FINAL MODEL
fig 176B, FINAL MODEL
fig 613A, Model of masterplan CONNECTING GRID 1.0
fig 812A, Beton model y-kolom
fig 812B, Beton model y-kolom
fig 812C, Beton model y-kolom
fig 322A, Fotos werfbezoek
fig 322B, Fotos werfbezoek
fig 322C, Fotos werfbezoek
fig 379A, The masters refer
fig 449A, Repitition
fig 950A, Omgeving isometrie
fig 950B, Omgeving isometrie
fig 1004A, End Presentation, Models
fig 1004B, End Presentation, Models
fig 1004C, End Presentation, Models
fig 551A, Vynckier Manchester I Foundation
fig 421A, drawing, pt.2
fig 421B, drawing, pt.2
fig 421C, drawing, pt.2
fig 341A, Axo concrete factory
fig 962A, FINAL DESIGN
fig 921A, EL Beton A0 analyse
fig 723A, Vynckier Site Saw-tooth roof
fig 723B, Vynckier Site Saw-tooth roof
fig 723C, Vynckier Site Saw-tooth roof
fig 723D, Vynckier Site Saw-tooth roof
fig 105A, WASSERIJ DER VLAANDEREN
fig 105B, WASSERIJ DER VLAANDEREN
fig 105C, WASSERIJ DER VLAANDEREN
fig 105D, WASSERIJ DER VLAANDEREN
fig 968A, Bedrijfsverzamelgebouw
fig 968B, Bedrijfsverzamelgebouw
fig 968C, Bedrijfsverzamelgebouw
fig 593A, drawing, 25/03
fig 593B, drawing, 25/03
fig 593C, model, 25/03
fig 595A, The Brewing Process
fig 970A, Viaduct Gent 2021
fig 970B, Viaduct Gent 2021, Constructie
fig 347A, Scheme structures silo
fig 347B, Scheme structures silo
fig 33A, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre Gentbrugge - site
fig 33B, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre - Primary structure
fig 33C, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre Gentbrugge - Concrete ceiling
fig 33D, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre - fragment
fig 140A, model making in the sun
fig 140B, model making in the sun
fig 2A, photo, ‘De Nobele’ – Site, Alongside the structure there's a workspace for a local artist.
fig 2B, photo, ‘De Nobele’ – Site, The unfinished upper part of the old textile factory.
fig 2C, photo, ‘De Nobele’ – Site, Detail of a main concrete column.
fig 2D, ‘De Nobele’ – Site, Analysis on which structure stays and which one disappears.
fig 1000A, Foto
fig 751A, model, Vynckier 2, Principe, Inkom
fig 479A, work in progress
fig 479B, work in progress
fig 172A, drawing, Research new structures in combination with existing
fig 172B, drawing, Research new structures in combination with existing
fig 172C, drawing, Research new structures in combination with existing, acoustic solutions - new vs. existing (2)
fig 172D, drawing, Research new structures in combination with existing
fig 531A, Schets, demonteerbare structuur, Jean Prouvé
fig 532A, The Smithsons’ New Brutalism
fig 532B, The Smithsons’ New Brutalism
fig 112A, photo, Hans Chr. Hansen, Amager Koblingsstation, Facade detail
fig 112B, photo, Hans Chr. Hansen, Amager Koblingsstation
fig 112C, photo, Hans Chr. Hansen, Amager Koblingsstation
fig 908A, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 908B, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 908C, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 908D, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 345A, La Fábrica – Ricardo Bofill
fig 787A, Mies van der Rohe – Farnsworth House – Hoekdetail
fig 712A, photo, Vynckier 2, Vynckier 2, Structuur, Grid Vynckier 1
fig 784A, Mies van der Rohe – Kruiskolom
fig 81A, drawing, ANALYSE EXISTING STRUCTURES
fig 844A, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844B, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844C, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844D, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 403A, model, Cathedrale Communale 1/200
fig 403B, model, Cathedrale Communale 1/200
fig 403C, model, Cathedrale Communale 1/200
fig 403D, model, Cathedrale Communale 1/200
fig 351A, WERKMAQUETTE_PLINT
fig 757A, theory research Gottfried semper
fig 681A, volume maquette en masterplan ingreep
fig 681B, volume maquette en masterplan ingreep
fig 957A, FINAL DESIGN
fig 519A, The Smithsons’ New Brutalism
fig 575A, Digital masterplan, scale 1/1000
fig 203A, sketch
fig 779A, Eames Case Study House 8, build sketch from Eames' Movie: House - after 5 years of living in it.
fig 594A, NIEUWE VYNCKIER
fig 171A, drawing, Analysis structure De Porre, Cantilever in concrete
fig 145A, STRUCTURAL DESIGN PRINCIPLES
fig 145B, STRUCTURAL DESIGN PRINCIPLES
fig 145C, STRUCTURAL DESIGN PRINCIPLES
fig 145D, STRUCTURAL DESIGN PRINCIPLES
fig 344A, How to become a Niemeyer
fig 245A, model, Axel Fangueiro and Luna Fonseca
fig 762A, Analyse Robert Venturi en Denise Scott Brown, Big Donut Drive-in
fig 369A, Section analysis of fermentation tank
fig 167A, photo, WORK – tussen
fig 167B, WORK – tussen
fig 405A, drawing, SECTION_BREWERY_AA’
fig 279A, werfbezoek – breedplaatwanden
fig 279B, werfbezoek – breedplaatwanden
fig 497A, photo, Huisartsenpraktijk
fig 430A, model, jury WTC
fig 430B, model, jury WTC
fig 430C, model, jury WTC
fig 724A, Vynckier Site Masterplan
fig 859A, WOODPROTECT ; Storage of wooden sleepers
fig 17A, photo, SITE VISIT °2, On top you can see the combination of the concrete columns with the steel trusses.
fig 17B, photo, SITE VISIT °2, Prefabricated concrete elements fits perfectly in each other.
fig 17C, photo, SITE VISIT °2, The holes in the beams are made to put ducts through them.
fig 17D, photo, SITE VISIT °2, Prefabricated concrete elements fits perfectly in each other.
fig 368A, Structural model WTC brewery
fig 368B, Structural model WTC brewery
fig 384A, CATHEDRALE COMMUNALE_SECTIONS
fig 384B, CATHEDRALE COMMUNALE_SECTIONS
fig 118A, photo, Test model of 26 04 2017
fig 118B, photo, Test model of 26 04 2017
fig 118C, photo, Test model of 26 04 2017
fig 820A, SUPERSTUDIO Un catalogo di ville 1968-1970, Villa Suburbana A6
fig 197A, work in progress … axonometry
fig 186A, Model
fig 186B, Model
fig 186C, Model
fig 725A, Vynckier Circle
fig 725B, Vynckier Circle
fig 725C, Vynckier Circle
fig 707A, photo, Vynckier, Masterplan, Structuur site
fig 223A, drawing, proces_23
fig 760A, fire station Mechelen
fig 5A, photo, Concrete Structure, Concrete Grid Structure
fig 5B, photo, Concrete Structure, Concrete Skylight
fig 798A, Facade, office vs storage, Kleimoer, Office vs Storage
fig 791A, Alfred Hardy
fig 791B, Alfred Hardy
fig 791C, Alfred Hardy
fig 791D, Alfred Hardy
fig 19A, photo, SUPPORTING FACADE STRUCTURE, steel supporting structure
fig 638A, Georgia
fig 985A, drawing, Section Column
fig 738A, drawing, axo Manchester and Tulou, axonometric drawing
fig 471A, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 471B, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 471C, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 832A, model, foto maquette
fig 355A, Notre-Dame in BXL?
fig 101A, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101B, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101C, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101D, drawing, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 586A, Masterplan Proposal
fig 248A, photo, exploring the deep plan
fig 144A, structural options. Isolating a container outside
fig 144B, structural options. Isolating a container outside
fig 331A, REFERENTIE_1
fig 18A, photo, Wood Hollow Core Slab
fig 18B, photo, Wood Hollow Core Slab
fig 769A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 761A, Nieuwstraat Sint-Gillis-Waas
fig 453A, renovated structure
fig 228A, proces_30