fig 368A, Bochten testen
fig 368B, Bochten testen
fig 368C, Bochten testen
fig 227A, proces_29
fig 650A, The Nantes Saint-Nazaire Higher School of Fine Arts
fig 653A, Building with shed structure
fig 13A, photo, Arrival_Tower
fig 139A, DT
fig 139B, DT
fig 562A, section engine room archive
fig 267A, John Hancock Center
fig 267B, John Hancock Center
fig 267C, John Hancock Center
fig 267D, John Hancock Center
fig 218A, drawing, proces_18
fig 760A, ontwerpschetsen
fig 760B, ontwerpschetsen
fig 760C, ontwerpschetsen
fig 760D, ontwerpschetsen
fig 209A, drawing, proces_10
fig 7A, drawing, types of compound beam
fig 184A, Design
fig 184B, Design
fig 184C, Design
fig 184D, Design
fig 153A, DRAWINGS
fig 153B, DRAWINGS
fig 153C, DRAWINGS
fig 153D, DRAWINGS
fig 197A, work in progress … axonometry
fig 696A, Modelshots CONNECTING GRID
fig 696B, Modelshots CONNECTING GRID
fig 696C, Modelshots CONNECTING GRID
fig 696D, Modelshots CONNECTING GRID
fig 568A, Photo of of interior staircase at building 4, Vynckier site
fig 36A, photo, Woonzorgcentrum Van Lierde, the blocks can be used for structural and non-structural purposes
fig 193A, meetings
fig 531A, drawing, Sketch of Art & Architecture Building
fig 662A, photo, shed structure
fig 464A, House Botte – bOb Van Reeth
fig 123A, New structures
fig 737A, Primary Circles_structural system
fig 495A, test materiality – housing tower
fig 57A, Mid-Process model
fig 101A, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101B, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101C, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101D, drawing, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 722A, axo existing structure
fig 673A, Structuur Manchester 2
fig 245A, model, Axel Fangueiro and Luna Fonseca
fig 286A, werfbezoek – kraan in liftschacht
fig 457A, Enclosed houses
fig 457B, photo, Enclosed houses
fig 163A, Proces
fig 163B, drawing, Proces, detail exploded view
fig 163C, Proces
fig 163D, Proces
fig 494A, NG17 – preliminary design 06/05 – hostel + offices
fig 494B, NG17 – preliminary design 06/05 – hostel + offices
fig 686A, model
fig 686B, model
fig 686C, model
fig 686D, model
fig 293A, WTC I: Axo op 2 verdiepen
fig 397A, model, Final scale model
fig 81A, drawing, ANALYSE EXISTING STRUCTURES
fig 481A, KANAL review KUL UCL ULB
fig 481B, KANAL review KUL UCL ULB
fig 481C, KANAL review KUL UCL ULB
fig 578A, Model of vision on masterplan, scale 1/1000
fig 496A, drawing, Betonnen wafelstructuur
fig 693A, research existing structure
fig 484A, work in progress
fig 484B, work in progress
fig 549A, Bijgebouw Manchester 1
fig 180A, model, Site de Porre – primary structure model, A
fig 338A, Werkmaquette
fig 277A, Ceiling Infrastructure plan
fig 183A, Structural Analysis
fig 183B, Structural Analysis
fig 183C, Structural Analysis
fig 183D, Structural Analysis
fig 131A, Blekerijstraat site photos
fig 131B, Blekerijstraat site photos
fig 131C, Blekerijstraat site photos
fig 131D, Blekerijstraat site photos
fig 121A, Pictures Model
fig 121B, Pictures Model
fig 504A, Housing tower – AXO
fig 426A, drawing, pt.2
fig 426B, drawing, pt.2
fig 426C, drawing, pt.2
fig 473A, GEORGE & GILBERT
fig 473B, GEORGE & GILBERT
fig 547A, Aansluiting staalframebouw
fig 157A, model masterplan
fig 77A, Concrete building elements
fig 77B, Concrete building elements
fig 77C, Concrete building elements
fig 77D, Concrete building elements
fig 590A, Proposal Masterplan
fig 706A, De Nieuwe Vynckier – Incubator – Concept
fig 15A, photo, SILOS, TANKS & HOLDERS, Rotating the panels allows vertical forces to be guided down
fig 15B, drawing, SILOS, TANKS & HOLDERS, Basic dimensions of a cold rolled steel silo panel
fig 58A, Model #1
fig 58B, Model #1
fig 436A, CATHEDRALE COMMUNALE_JURY
fig 436B, CATHEDRALE COMMUNALE_JURY
fig 436C, CATHEDRALE COMMUNALE_JURY
fig 436D, CATHEDRALE COMMUNALE_JURY
fig 341A, Detail of 1 Bligh Street
fig 756A, photo, Vynckier 2, Principe, Maquette, Inkom
fig 574A, Vynckier Site masterplan sketch
fig 633A, fake Mies
fig 633B, fake Mies
fig 748A, photo, Jubileumlaan, construction soilmixwall
fig 233A, model, Valentin Graf and Borja Fernandez
fig 708A, De Nieuwe Vynckier – Incubator – Model
fig 194A, meetings
fig 142A, Urban design
fig 142B, Urban design
fig 681A, model, Dwarse snede woning
fig 727A, photo, Vynckier 2, Vynckier 2, Principe gevel- en dakopbouw
fig 542A, ECAM – Agwa Architects
fig 542B, ECAM – Agwa Architects
fig 419A, drawing, proces
fig 419B, proces
fig 647A, PALACE OF LABOUR, TURIN, 1961
fig 367A, Axo volumes
fig 367B, Axo volumes
fig 339A, Ingang wtc via kern
fig 763A, photo, Eve Babitz playing chess with Marcel Duchamp, Pasadena 1963
fig 280A, werfbezoek, SAMSUNG CSC
fig 87A, Analysis structure De Porre, De Porre - floorplan
fig 87B, Analysis structure De Porre, De Porre - level +1
fig 87C, Analysis structure De Porre, Isometric view - surroundings
fig 87D, Analysis structure De Porre, Isometric view - structure
fig 204A, meetings, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 537A, The Smithsons’ New Brutalism
fig 537B, The Smithsons’ New Brutalism
fig 302A, Basiliek van Koekelberg
fig 302B, Basiliek van Koekelberg
fig 418A, model, werkmaquette
fig 418B, model, werkmaquette
fig 294A, WTC NIV + 27
fig 365A, WTC 1 – model of mosque
fig 365B, WTC 1 – model of mosque
fig 335A, REFERENTIE_2
fig 334A, WERKMAQUETTE_3.0
fig 637A, Structure ConnectingGrid
fig 640A, Shed structure with new volume
fig 640B, Shed structure with new volume
fig 60A, photo, SIMPLE CONSTRUCTION
fig 60B, SIMPLE CONSTRUCTION
fig 60C, SIMPLE CONSTRUCTION
fig 313A, Analysing the parking lot
fig 313B, Analysing the parking lot
fig 313C, Analysing the parking lot
fig 313D, Analysing the parking lot
fig 470A, Collage Rules
fig 263A, drawing, WTC_subtraction, WTC_subtraction
fig 263B, drawing, WTC_subtraction, WTC_axonometry
fig 695A, Modelshots CONNECTING GRID
fig 695B, Modelshots CONNECTING GRID
fig 695C, model, Modelshots CONNECTING GRID
fig 695D, Modelshots CONNECTING GRID
fig 731A, Vynckier Circle
fig 731B, Vynckier Circle
fig 731C, Vynckier Circle
fig 161A, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 161B, drawing, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 161C, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 161D, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 108A, photo, Gent Voorhaven PortService Warehouses, Large Warehouse facades
fig 108B, photo, Gent Voorhaven PortService Warehouses, small warehouse
fig 108C, photo, Gent Voorhaven PortService Warehouses, Bombed structure inside
fig 108D, photo, Gent Voorhaven PortService Warehouses, Bombed structure old warehouses
fig 743A, drawing, Manchester, concept apartments and stores
fig 743B, drawing, Manchester, concept structure
fig 743C, drawing, Manchester, concept offices
fig 743D, drawing, Manchester, entrance
fig 349A, Scheme structures silo
fig 349B, Scheme structures silo
fig 471A, belibel
fig 133A, photo, Final urban model
fig 133B, Final urban model
fig 133C, model, Final urban model
fig 396A, model, Cathedrale Communale
fig 396B, model, Cathedrale Communale
fig 396C, model, Cathedrale Communale
fig 396D, model, Cathedrale Communale
fig 702A, Axonometries CONNECTING GRID
fig 702B, Axonometries CONNECTING GRID
fig 720A, photo, Vynckier 2, Vynckier 2, Primaire en secundaire structuur
fig 512A, Final maquette
fig 512B, Final maquette
fig 512C, photo, Final maquette
fig 420A, sfeer
fig 383A, Final design: looking inside the model
fig 383B, Final design: looking inside the model
fig 125A, Site visit
fig 520A, space and event
fig 137A, model, photos models
fig 137B, photo, photos models
fig 137C, model, photos models
fig 137D, photos models
fig 333A, REFERENTIE_1
fig 288A, sketch on existing plan
fig 159A, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159B, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159C, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159D, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 545A, Bambow bridge – Atelier Lai
fig 545B, Bambow bridge – Atelier Lai
fig 684A, 27/05
fig 684B, 27/05
fig 684C, 27/05
fig 684D, drawing, 27/05
fig 680A, research existing structure
fig 680B, research existing structure
fig 680C, research existing structure
fig 680D, research existing structure
fig 3A, drawing, Voorhaven Site, The column is constructed with leftovers from the world expo in Antwerp 1985
fig 3B, photo, Voorhaven Site
fig 3C, drawing, Voorhaven Site, how hot riveting is done.
fig 100A, Steel Prefab Structure, construction site
fig 100B, Steel Prefab Structure, steel components joint
fig 100C, Steel Prefab Structure, steel components ridge joint
fig 100D, Steel Prefab Structure, steel components joint
fig 149A, Sketches
fig 149B, Sketches
fig 178A, model, Final model, B, 1:50
fig 448A, VERNACULAR
fig 289A, WTC 1 axo tetris
fig 564A, Machinekamer Vynckier site
fig 466A, Structure, Libelco
fig 466B, Structure, Libelco
fig 201A, Floors sections
fig 73A, drawing, Construction details of the warehouse on site
fig 73B, drawing, Construction details of the warehouse on site
fig 73C, drawing, Construction details of the warehouse on site
fig 217A, drawing, proces_17
fig 668A, OMA
fig 668B, OMA
fig 668C, OMA
fig 668D, OMA
fig 144A, structural options. Isolating a container outside
fig 144B, structural options. Isolating a container outside
fig 215A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 497A, DETAIL – brick meets wood
fig 478A, work in progress
fig 478B, work in progress
fig 579A, Sketch of masterplan, scale 1/1000
fig 444A, hopvandenbrandenstraat.
fig 444B, hopvandenbrandenstraat.
fig 444C, hopvandenbrandenstraat.
fig 519A, Werfbeeld 51 Rue Raynouard – Perret
fig 480A, Wachtstaven
fig 399A, drawing, Final plans
fig 765A, expo Vynckier @ WTF
fig 765B, expo Vynckier @ WTF
fig 765C, expo Vynckier @ WTF
fig 765D, expo Vynckier @ WTF
fig 624A, drawing, Vynckier
fig 624B, drawing, Vynckier
fig 624C, drawing, Vynckier
fig 624D, drawing, Vynckier
fig 690A, ingrepen op aanwezige context
fig 690B, ingrepen op aanwezige context
fig 462A, Enclosed house
fig 226A, drawing, proces_27
fig 524A, The Smithsons’ New Brutalism
fig 242A, axonometric alejandra and joao
fig 93A, TECHNICAL DETAILS, Technical detail on the guiding rails
fig 93B, TECHNICAL DETAILS, Technical detail on the connection between the steel structure & foundation
fig 607A, Superstudio, Adolfo Natalini, Monumento Continuo, 1969
fig 572A, photo, Vynckier, Vynckier_Productiehal
fig 717A, photo, Vynckier, Masterplan, Zicht op Manchester 1 en overdekte markt
fig 554A, Parkeergebouw Ledeberg, Nieuw Parkeergebouw Ledeberg
fig 583A, model, Masterplan Vynckier
fig 164A, photo, CREE LCT building system, Floor slab with the holes in it for the steel bar of the columns
fig 164B, CREE LCT building system, wall piece with the columns attached
fig 39A, drawing, Japan wood connection in chamonix
fig 351A, Scheme structures silo
fig 351B, Scheme structures silo
fig 592A, Vynckier Site, first proposal, scheme
fig 358A, Notre-Dame in BXL?
fig 755A, photo, Vynckier 2, Principe, Maquette
fig 86A, photo, Wittemolenstraat, Sint – Amandsberg, OLYMPUS DIGITAL CAMERA
fig 86B, Wittemolenstraat, Sint – Amandsberg, OLYMPUS DIGITAL CAMERA
fig 10A, drawing, CORRUGATED WEB BEAM, Production GLP Beam
fig 10B, photo, CORRUGATED WEB BEAM, Connection GLP to GLP
fig 10C, photo, CORRUGATED WEB BEAM, Connection GLP to column
fig 10D, photo, CORRUGATED WEB BEAM, Example project
fig 249A, photo, working session
fig 46A, drawing, masterplan site gentbrugge
fig 46B, drawing, masterplan site gentbrugge
fig 46C, photo, masterplan site gentbrugge
fig 24A, photo, Steel truss, center piece
fig 24B, photo, Steel truss, Beam and truss connection
fig 92A, MODEL #2, Cross-section model of the gasholder
fig 92B, MODEL #2, Cross-section model of the gasholder
fig 92C, MODEL #2, Cross-section model of the gasholder
fig 663A, future for the fireplace
fig 612A, drawing, Vynckier
fig 612B, model, Vynckier
fig 612C, drawing, Vynckier
fig 384A, ANALYSIS WTC
fig 384B, ANALYSIS WTC
fig 25A, photo, Hole deck, Holedeck construction
fig 25B, model, Hole deck
fig 646A, Masterplan
fig 521A, Column Peter Märkli
fig 739A, Primary Circles_Detailed section
fig 223A, drawing, proces_23
fig 752A, STADSPARK VYNCKIER/ DE SCHIJF
fig 240A, drawing, axonometry Marta and Luciana
fig 432A, WTC remodel – a tower can have a lot of different plans
fig 432B, WTC remodel – a tower can have a lot of different plans
fig 432C, WTC remodel – a tower can have a lot of different plans
fig 432D, WTC remodel – a tower can have a lot of different plans
fig 655A, Building shed structure new addition
fig 251A, DEEP PLAN construction detail 1, structural detail 1
fig 336A, WERKMAQUETTE_3.1
fig 336B, WERKMAQUETTE_3.1
fig 352A, How To Become A Niemeyer
fig 745A, model, Site model, site Vynkier
fig 409A, drawing, Facade
fig 676A, model, Schijf x Manchester
fig 676B, Schijf x Manchester
fig 676C, Schijf x Manchester
fig 676D, Schijf x Manchester
fig 89A, photo, Study models
fig 89B, Study models
fig 89C, photo, Study models, Using the same logic to connect two pieces to find the right length
fig 604A, Proposal masterplan Vynckier site
fig 274A, Zuidertoren
fig 274B, Zuidertoren
fig 274C, Zuidertoren
fig 14A, photo, Industrial project
fig 14B, photo, Industrial project
fig 14C, photo, Industrial project
fig 14D, photo, Industrial project
fig 679A, drawing, Langse snede
fig 234A, model, João Branco and Alejandra Calvo
fig 357A, WERKMAQUETTE_3.3_BUREN
fig 475A, volumestudie
fig 278A, Structure WTC 1 +3 & +24
fig 278B, Structure WTC 1 +3 & +24
fig 278C, Structure WTC 1 +3 & +24
fig 278D, Structure WTC 1 +3 & +24
fig 584A, Mosterdfabriek Oudenaarde
fig 728A, photo, Vynckier 2, Vynckier 2, Wachtgevel
fig 541A, Rudolf Olgiati Column
fig 486A, detail – concrete & wood connection
fig 670A, Plan 1 terminal
fig 47A, drawing, Every Big Box has its structure
fig 47B, drawing, Every Big Box has its structure
fig 63A, Model tests
fig 66A, photo, Test Model – Drawing
fig 507A, Axonometric NG17
fig 654A, Building shed structure axonometric
fig 376A, Cathedrale Communale
fig 112A, photo, Hans Chr. Hansen, Amager Koblingsstation, Facade detail
fig 112B, photo, Hans Chr. Hansen, Amager Koblingsstation
fig 112C, photo, Hans Chr. Hansen, Amager Koblingsstation
fig 122A, Structure site Nieuwevaart Gent
fig 122B, Structure site Nieuwevaart Gent
fig 456A, collage de canal.brussels á la G&G
fig 67A, College Football Hall of Fame, Robert Venturi & Denise Scott Brown
fig 67B, College Football Hall of Fame, Robert Venturi & Denise Scott Brown
fig 402A, drawing, New vs old structure, steel vs concrete
fig 391A, CATHEDRALE COMMUNALE_DETAILS
fig 750A, STADSPARK VYNCKIER/ DE SCHIJF
fig 750B, STADSPARK VYNCKIER/ DE SCHIJF
fig 750C, STADSPARK VYNCKIER/ DE SCHIJF
fig 750D, STADSPARK VYNCKIER/ DE SCHIJF
fig 320A, Axonometric WTC
fig 270A, Knights of Columbus
fig 270B, Knights of Columbus
fig 270C, Knights of Columbus
fig 586A, Proposal Masterplan Vynckier
fig 707A, De Nieuwe Vynckier – Incubator – Section
fig 400A, drawing, Isometrie gevel
fig 132A, 4 Column House
fig 598A, drawing, 25/03
fig 598B, drawing, 25/03
fig 598C, model, 25/03
fig 265A, structureel schema plint
fig 254A, The ramp
fig 254B, The ramp
fig 254C, The ramp
fig 565A, Section Vynckier Machinekamer
fig 379A, Wooden box in steel structure
fig 91A, MODEL #1, Interior wooden structure
fig 91B, MODEL #1, Interior wooden structure
fig 59A, PUNCHED/PUNCTURED BEAM
fig 59B, PUNCHED/PUNCTURED BEAM
fig 59C, PUNCHED/PUNCTURED BEAM
fig 340A, Maquette 1/50
fig 377A, WERKMAQUETTE_4.1
fig 30A, photo, Silos, tanks & holders, Bottom-up construction
fig 30B, photo, Silos, tanks & holders, Interior view
fig 30C, photo, Silos, tanks & holders, Assembling the topcover
fig 30D, photo, Silos, tanks & holders, Surreal image
fig 459A, George&Gilbert
fig 29A, model, STEKO – Building Blocks, The basic elements of the STEKO® building system
fig 29B, photo, STEKO – Building Blocks
fig 29C, photo, STEKO – Building Blocks
fig 485A, Werkmaquettes concept DAUWSTRAAT/PICARDSTRAAT, Processed with VSCO with preset
fig 485B, Werkmaquettes concept DAUWSTRAAT/PICARDSTRAAT, Processed with VSCO with preset
fig 304A, WTC Sketch
fig 253A, Working session
fig 173A, model, model analyse
fig 411A, drawing, Sfeer
fig 411B, drawing, Sfeer
fig 411C, drawing, Sfeer
fig 372A, Section analysis of fermentation tank
fig 291A, Louis Sullivan – The tall office building artistically considered
fig 761A, detail schetsen
fig 761B, detail schetsen
fig 761C, detail schetsen
fig 761D, detail schetsen
fig 435A, model, jury WTC
fig 435B, model, jury WTC
fig 435C, model, jury WTC
fig 359A, Diving Tank, WTC
fig 764A, drawing, Projection of chessboard grid on Vynckier site
fig 424A, Final presentation
fig 424B, Final presentation
fig 424C, Final presentation
fig 424D, Final presentation
fig 308A, Site Visit 2
fig 308B, Site Visit 2
fig 308C, Site Visit 2
fig 308D, Site Visit 2
fig 177A, Final model
fig 177B, Final model, C
fig 75A, model, Construction details of a car dealers garage, Joint of a column, primary and secondary roof beams.
fig 75B, drawing, Construction details of a car dealers garage, Joint of a column, primary and secondary roof beams.
fig 75C, drawing, Construction details of a car dealers garage, Connection of the structure of the two halls.
fig 472A, werf, Aldi. Sint-Niklaas
fig 472B, werf, Aldi. Sint-Niklaas
fig 595A, masterplan
fig 621A, photo, SCHETSEN 1/04
fig 621B, SCHETSEN 1/04
fig 621C, photo, SCHETSEN 1/04
fig 621D, drawing, SCHETSEN 1/04
fig 94A, INDUSTRIAL CONSTRUCTION SITE, Prefab structure
fig 94B, INDUSTRIAL CONSTRUCTION SITE, Two truss crossing
fig 94C, INDUSTRIAL CONSTRUCTION SITE, Cross bracing of the structure
fig 733A, Vynckier Saw Shedroof
fig 733B, Vynckier Saw Shedroof
fig 733C, Vynckier Saw Shedroof
fig 284A, werfbezoek – zettingsvoegen
fig 49A, Model #2
fig 546A, Bambow bridge – Atelier Lai
fig 127A, model, Final
fig 127B, drawing, Final
fig 127C, drawing, Final
fig 80A, drawing, Site analyse
fig 80B, drawing, Site analyse
fig 80C, drawing, Site analyse
fig 80D, drawing, Site analyse
fig 514A, photo, A. Lavalléestraat
fig 514B, photo, A. Lavalléestraat
fig 514C, A. Lavalléestraat
fig 514D, photo, A. Lavalléestraat
fig 171A, drawing, Analysis structure De Porre, Cantilever in concrete
fig 356A, Vertical Garden WTC, “Hanging the stairs” Sketches
fig 42A, photo, Renovation factory Kotrijk
fig 42B, photo, Renovation factory Kotrijk
fig 42C, photo, Renovation factory Kotrijk
fig 42D, photo, Renovation factory Kotrijk
fig 674A, Aanzicht westgevel
fig 645A, Maquette
fig 645B, Maquette
fig 487A, test housing tower
fig 160A, PROCES – AFBREKEN VS OPBOUW
fig 160B, PROCES – AFBREKEN VS OPBOUW
fig 114A, drawing, Existing structure
fig 114B, drawing, Existing structure, Axo
fig 114C, drawing, Existing structure, Section
fig 114D, photo, Existing structure
fig 643A, Georgia
fig 303A, WTC Plan/Section Studentdorms
fig 678A, fragment model
fig 678B, fragment model
fig 678C, fragment model
fig 651A, BOX ON STEEL
fig 656A, Circle Building section
fig 573A, photo, WATER TOWER, Public square as entrance.
fig 573B, photo, WATER TOWER, Manchester's are for living and the heart of industry (water tower) between them.
fig 146A, Visit Industrial Natural stone factory
fig 146B, Visit Industrial Natural stone factory
fig 310A, Vertical Garden
fig 195A, visits
fig 505A, Section A110
fig 732A, stil leven de werf
fig 732B, stil leven de werf
fig 732C, stil leven de werf
fig 732D, stil leven de werf
fig 206A, drawing, proces_01
fig 447A, George&Gilbert
fig 318A, Notre Dame
fig 82A, model, Analysis structure “De Porre”, Part of structure with cantilever
fig 82B, Analysis structure “De Porre”, Part of structure with cantilever - top
fig 82C, Analysis structure “De Porre”, Part of structure with cantilever
fig 599A, NIEUWE VYNCKIER
fig 513A, model, DAUWSTRAAT MODEL
fig 513B, DAUWSTRAAT MODEL
fig 513C, DAUWSTRAAT MODEL
fig 513D, DAUWSTRAAT MODEL
fig 115A, photo, Site visit
fig 115B, photo, Site visit
fig 115C, photo, Site visit
fig 115D, photo, Site visit
fig 503A, photo, Tandartsenpraktijk
fig 317A, Tetris Within A Tetris
fig 321A, exploded sokkel
fig 43A, photo, Hot Rivet, knooppunt staalstructuur
fig 126A, URBAN FARM
fig 126B, URBAN FARM
fig 629A, Connecting grid model
fig 558A, Section Store Shed
fig 364A, Bamboo exoskeleton stairs , Vertical garden
fig 364B, Bamboo exoskeleton stairs , Vertical garden
fig 290A, Voorstel programma toren
fig 130A, Example sites photos
fig 130B, Example sites photos
fig 130C, Example sites photos
fig 540A, photo, Palais d’Iéna, Paris – Auguste Perret
fig 712A, photo, Vynckier, Masterplan, Functies
fig 325A, Werfbezoek
fig 325B, Werfbezoek
fig 325C, Werfbezoek
fig 325D, Werfbezoek
fig 241A, axonometric
fig 241B, axonometric
fig 387A, CATHEDRALE COMMUNALE_SECTIONS
fig 387B, CATHEDRALE COMMUNALE_SECTIONS
fig 145A, STRUCTURAL DESIGN PRINCIPLES
fig 145B, STRUCTURAL DESIGN PRINCIPLES
fig 145C, STRUCTURAL DESIGN PRINCIPLES
fig 145D, STRUCTURAL DESIGN PRINCIPLES
fig 408A, drawing, SECTION_BREWERY_AA’
fig 415A, analyse plint
fig 415B, analyse plint
fig 415C, drawing, analyse plint
fig 415D, analyse plint
fig 17A, photo, SITE VISIT °2, On top you can see the combination of the concrete columns with the steel trusses.
fig 17B, photo, SITE VISIT °2, Prefabricated concrete elements fits perfectly in each other.
fig 17C, photo, SITE VISIT °2, The holes in the beams are made to put ducts through them.
fig 17D, photo, SITE VISIT °2, Prefabricated concrete elements fits perfectly in each other.
fig 577A, les 18/03
fig 577B, drawing, les 18/03
fig 577C, drawing, les 18/03
fig 28A, photo, Industrial warehouse, connection between foundation and column
fig 28B, photo, Industrial warehouse, connection between column and beam
fig 28C, photo, Industrial warehouse
fig 28D, photo, Industrial warehouse, connection between beams
fig 56A, sketches container : Stacking;Connection
fig 56B, sketches container : Stacking;Connection
fig 56C, sketches container : Stacking;Connection
fig 56D, sketches container : Stacking;Connection
fig 19A, photo, SUPPORTING FACADE STRUCTURE, steel supporting structure
fig 295A, Core WTC
fig 393A, Is It a Niemeyer?
fig 393B, Is It a Niemeyer?
fig 292A, Reference: Standard Bank Centre – Hentrich, Petschnigg & Partners ( 1970)
fig 35A, drawing, Floor systems of bricks
fig 35B, drawing, Floor systems of bricks
fig 35C, drawing, Floor systems of bricks
fig 35D, model, Floor systems of bricks
fig 252A, Pillar Catalogue
fig 90A, Connection of a steel beam to a concrete wall
fig 90B, Connection of a steel beam to a concrete wall
fig 152A, Reference: ALEXANDER BRODSKY 95 DEGREES RESTAURANT
fig 152B, photo, Reference: ALEXANDER BRODSKY 95 DEGREES RESTAURANT
fig 152C, photo, Reference: ALEXANDER BRODSKY 95 DEGREES RESTAURANT
fig 450A, Adjacent
fig 557A, Prefab Walls
fig 268A, WTC Massive Model
fig 639A, shed structure
fig 639B, shed structure
fig 427A, Distinction in program
fig 427B, Distinction in program
fig 762A, maquette
fig 762B, maquette
fig 762C, maquette
fig 762D, maquette
fig 389A, CATHEDRALE COMMUNALE_PROGRAM
fig 389B, CATHEDRALE COMMUNALE_PROGRAM
fig 523A, drawing, Kimbell Art Center
fig 523B, Kimbell Art Center
fig 699A, Axonometry of fragment CONNECTING GRID
fig 699B, Axonometry of fragment CONNECTING GRID
fig 166A, photo, FACADE DETAIL, The final fragmented detail of one of the three variations.
fig 166B, photo, FACADE DETAIL, The final fragmented detail of one of the three variations.
fig 166C, photo, FACADE DETAIL, Isometric view of the three variation on the outside columns.
fig 166D, photo, FACADE DETAIL, Handmade concrete
fig 394A, Cathedrale Communale
fig 394B, Cathedrale Communale
fig 394C, Cathedrale Communale
fig 394D, Cathedrale Communale
fig 421A, drawing, snede
fig 493A, detail – wood & wood connection
fig 493B, detail – wood & wood connection
fig 493C, detail – wood & wood connection
fig 689A, section
fig 689B, section
fig 689C, section
fig 455A, Collage Gilbert and Georges
fig 445A, mapping trough the lens of G&G
fig 489A, model, Model housing tower
fig 196A, AXONOMETRIC
fig 326A, werfbezoek
fig 326B, werfbezoek
fig 326C, werfbezoek
fig 606A, drawing, voorstellen inplanting
fig 606B, voorstellen inplanting
fig 490A, Structure LaVallée
fig 113A, drawing, Site Ijzerweglaan, City fabric
fig 113B, photo, Site Ijzerweglaan, Island cut off by the river Schelde and the E17 Viaduct
fig 113C, model, Site Ijzerweglaan
fig 113D, drawing, Site Ijzerweglaan, Different existing typologies
fig 641A, circular building
fig 641B, circular building
fig 635A, OFFICE – RTS Building
fig 635B, OFFICE – RTS Building
fig 555A, Werf GENT
fig 666A, drawing, 27/05
fig 666B, drawing, 27/05
fig 666C, model, 27/05
fig 666D, drawing, 27/05
fig 188A, porto class 17
fig 97A, drawing, SITE & BUILDING ANALYSIS, Exploded view from different construction segments
fig 97B, SITE & BUILDING ANALYSIS, Detailed plan from below and above the ground
fig 26A, photo, Lumat Site Gent
fig 26B, photo, Lumat Site Gent
fig 26C, photo, Lumat Site Gent
fig 438A, finaal model
fig 438B, finaal model
fig 438C, finaal model
fig 675A, drawing, Masterplan
fig 176A, FINAL MODEL
fig 176B, FINAL MODEL
fig 575A, Masterplan
fig 386A, CATHEDRALE COMMUNALE_PLANS
fig 511A, drawing, PICARDSTRAAT DETAILSECTION
fig 610A, drawing, English Garden – Lancelot Capability Brown
fig 506A, Section A110
fig 124A, photo, Construction clt
fig 644A, Staal-beton kolom
fig 644B, Staal-beton kolom
fig 548A, Constructie detail werfbezoek
fig 316A, Conceptual thinking
fig 40A, photo, Schuur Gentbrugge – Site
fig 40B, photo, Schuur Gentbrugge – Site
fig 40C, photo, Schuur Gentbrugge – Site
fig 40D, drawing, Schuur Gentbrugge – Site
fig 305A, atelier
fig 306A, work documents
fig 412A, drawing, Detail
fig 440A, Jury WTC
fig 440B, Jury WTC
fig 440C, Jury WTC
fig 440D, Jury WTC
fig 324A, Fotos werfbezoek
fig 324B, Fotos werfbezoek
fig 324C, Fotos werfbezoek
fig 738A, Primary Circles_Model
fig 601A, Masterplan Model 2
fig 430A, first test extra facade
fig 229A, proces_31
fig 191A, meetings
fig 413A, axo details
fig 413B, drawing, axo details
fig 119A, model, Test model of 3 05 2017
fig 404A, model, CATHEDRALE COMMUNALE_DETAIL
fig 404B, model, CATHEDRALE COMMUNALE_DETAIL
fig 716A, photo, Vynckier, Masterplan, Zicht op plein
fig 275A, References Prestige Towers
fig 158A, Model of the Site, The final position of the new added buildings.
fig 158B, Model of the Site, Model without any of the existing structures.
fig 544A, Isomo uitsparing voor TPG betonvloer
fig 33A, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre Gentbrugge - site
fig 33B, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre - Primary structure
fig 33C, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre Gentbrugge - Concrete ceiling
fig 33D, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre - fragment
fig 361A, Detailing sketches
fig 366A, cathédrale communale work documents
fig 366B, cathédrale communale work documents
fig 458A, renovated structure
fig 143A, structural color
fig 143B, structural color
fig 212A, final isometric Axel and Luna
fig 591A, Masterplan Proposal
fig 150A, Composite steel columns
fig 255A, WTC pillar dimensions
fig 704A, Masterplan
fig 704B, Masterplan
fig 474A, photo, workshop
fig 474B, workshop
fig 390A, CATHEDRALE COMMUNALE_ISOMETRIC
fig 138A, Sint – Amandsberg site, Gent. Details
fig 328A, WTC model progress week 8
fig 617A, drawing, Section connection Manchester and CONNECTING GRID 1.0
fig 244A, model, Maurício Muller and Jerónimo Bailat
fig 380A, Wooden stairs in steel structure
fig 551A, Jun Igarashi – Hat H house
fig 199A, sketch
fig 718A, photo, Vynckier 2, Vynckier 2, Structuur, Grid Vynckier 1
fig 613A, drawing, 01/04
fig 613B, drawing, 01/04
fig 613C, drawing, 01/04
fig 388A, CATHEDRALE COMMUNALE
fig 228A, proces_30
fig 128A, drawing, Final drawings
fig 128B, model, Final drawings
fig 128C, drawing, Final drawings
fig 128D, drawing, Final drawings
fig 353A, WERKMAQUETTE_PLINT
fig 749A, drawing, STADSPARK VYNCKIER/ DE SCHIJF
fig 749B, STADSPARK VYNCKIER/ DE SCHIJF
fig 749C, STADSPARK VYNCKIER/ DE SCHIJF
fig 749D, STADSPARK VYNCKIER/ DE SCHIJF
fig 207A, model
fig 734A, primary structure
fig 734B, primary structure
fig 734C, primary structure
fig 734D, primary structure
fig 272A, Willis Tower
fig 272B, Willis Tower
fig 208A, drawing, proces_09
fig 611A, drawing, Vynckier
fig 611B, model, Vynckier
fig 611C, drawing, Vynckier
fig 186A, Model
fig 186B, Model
fig 186C, Model
fig 593A, Vynckier Site, first proposal, sketches
fig 446A, Visible structure
fig 371A, Structural model WTC brewery
fig 371B, Structural model WTC brewery
fig 62A, container cut outs
fig 62B, container cut outs
fig 62C, container cut outs
fig 62D, container cut outs
fig 463A, Marc-Antoine Laugier ‘Essay on Architecture’
fig 463B, Marc-Antoine Laugier ‘Essay on Architecture’
fig 331A, WERKMAQUETTE_1-2
fig 331B, WERKMAQUETTE_1-2
fig 515A, final jury @ KANAL bxl
fig 515B, final jury @ KANAL bxl
fig 515C, final jury @ KANAL bxl
fig 515D, final jury @ KANAL bxl
fig 527A, photo, Analyse Swiss Sound Box – Peter Zumthor, Swiss Sound Box - Peter Zumthor
fig 567A, drawing, Plan floor level (+0) of building 4 and 4A, Vynckier site
fig 31A, photo, Silos, tanks & holders, Fully assembled
fig 31B, photo, Silos, tanks & holders, Positioning the different panels
fig 31C, photo, Silos, tanks & holders, Pre-asssembly of the different panels
fig 556A, Vynckier Manchester I Foundation
fig 68A, collage: walls around the field
fig 725A, photo, Vynckier 2, Vynckier 2, Snede
fig 83A, drawing, SITE ANALYSE
fig 83B, drawing, SITE ANALYSE
fig 83C, drawing, SITE ANALYSE
fig 27A, drawing, Types of steel trusses
fig 238A, AXONOMETRIC, Jukyung & Uk
fig 437A, FINAL MODEL – JURY
fig 437B, FINAL MODEL – JURY
fig 437C, FINAL MODEL – JURY
fig 437D, FINAL MODEL – JURY
fig 332A, CONCEPTBEELD_1
fig 429A, northern quarter voyeurism, An MQ-9 Reaper and MQ-1 Predator sit on display in brand new Hangar three at Holloman Air Force Base, N.M.
fig 429B, northern quarter voyeurism
fig 587A, Proposal Facade Vynckier site
fig 502A, photo, Huisartsenpraktijk
fig 273A, Citygroup Center
fig 273B, Citygroup Center
fig 273C, Citygroup Center
fig 147A, model, ‘HUIDEVETTERKEN’ werkmaquette
fig 147B, drawing, ‘HUIDEVETTERKEN’ werkmaquette, existing situation plan
fig 147C, model, ‘HUIDEVETTERKEN’ werkmaquette
fig 363A, Structure between diving tank and WTC 2tower
fig 439A, MAQUETTE_WTC_ONTWERP
fig 439B, MAQUETTE_WTC_ONTWERP
fig 439C, MAQUETTE_WTC_ONTWERP
fig 439D, MAQUETTE_WTC_ONTWERP
fig 687A, volume maquette en masterplan ingreep
fig 687B, volume maquette en masterplan ingreep
fig 118A, photo, Test model of 26 04 2017
fig 118B, photo, Test model of 26 04 2017
fig 118C, photo, Test model of 26 04 2017
fig 723A, Vynckier Circle Building
fig 723B, Vynckier Circle Building
fig 723C, Vynckier Circle Building
fig 723D, Vynckier Circle Building
fig 190A, meetings
fig 569A, In het spoor van Serafinus
fig 250A, working session
fig 632A, Vynckier 2
fig 258A, Hidden Structure
fig 258B, Hidden Structure
fig 258C, Hidden Structure
fig 258D, drawing, Hidden Structure
fig 239A, PHOTO
fig 266A, Manhattan project
fig 266B, Manhattan project
fig 266C, Manhattan project
fig 296A, Structure Niv +27 WTC
fig 129A, Pictures site Nieuwevaart
fig 129B, Pictures site Nieuwevaart
fig 98A, Quick steel
fig 99A, Basic Concrete Prefab Construction, construction site
fig 99B, Basic Concrete Prefab Construction, Connection in the center of a diagonal buttress
fig 99C, Basic Concrete Prefab Construction, Top connection of a diagonal buttress
fig 99D, Basic Concrete Prefab Construction, Floor connection of a diagonal buttress
fig 348A, Site visite Orsi Academy
fig 348B, Site visite Orsi Academy
fig 348C, Site visite Orsi Academy
fig 348D, Site visite Orsi Academy
fig 596A, Masterplan Vynckiersite Gent
fig 596B, Masterplan Vynckiersite Gent
fig 596C, Masterplan Vynckiersite Gent
fig 703A, 1 UNIT
fig 703B, 1 UNIT
fig 741A, Primaru Circles_photos
fig 736A, Primary Circles_Sections
fig 736B, Primary Circles_Sections
fig 736C, Primary Circles_Sections
fig 736D, Primary Circles_Sections
fig 210A, drawing, proces_11
fig 628A, Masterplan level 1
fig 203A, sketch
fig 76A, Project Kievit
fig 76B, Project Kievit
fig 76C, Project Kievit
fig 76D, Project Kievit
fig 181A, final drawings
fig 181B, drawing, final drawings
fig 585A, drawing, Drawing proposal Masterplan
fig 559A, Combination industry and living, Biestebroek quay – Plusoffice Architects & Collectif WRKSHP
fig 559B, Combination industry and living, Biestebroek quay – Plusoffice Architects & Collectif WRKSHP
fig 559C, Combination industry and living, Biestebroek quay – Plusoffice Architects & Collectif WRKSHP
fig 342A, Manitoba hydro place
fig 22A, photo, factory Gentbrugge – Site, wooden beam pattern
fig 22B, drawing, factory Gentbrugge – Site
fig 22C, drawing, factory Gentbrugge – Site
fig 22D, drawing, factory Gentbrugge – Site, masonry
fig 652A, New Shed structure
fig 652B, New Shed structure
fig 23A, photo, Poco Loco – Fully automatic warehouse, View from the street
fig 23B, photo, Poco Loco – Fully automatic warehouse, section build on the ground
fig 23C, photo, Poco Loco – Fully automatic warehouse, connection of 2 different sections
fig 23D, photo, Poco Loco – Fully automatic warehouse, reinforcement for windloads
fig 110A, drawing, Current structure analyse
fig 110B, drawing, Current structure analyse
fig 110C, Current structure analyse
fig 110D, Current structure analyse
fig 219A, drawing, proces_19
fig 314A, A Cut Into Our Model
fig 314B, A Cut Into Our Model
fig 314C, A Cut Into Our Model
fig 616A, drawing, Masterplan CONNECTING GRID 1.0, scale 1/1000
fig 48A, model vs Spa reine
fig 522A, Marika-Alderton House – Glenn Murcutt
fig 140A, model making in the sun
fig 140B, model making in the sun
fig 422A, concerthal akoestiek
fig 422B, model, concerthal akoestiek
fig 422C, drawing, concerthal akoestiek
fig 281A, werfbezoek – breedplaatwanden
fig 281B, werfbezoek – breedplaatwanden
fig 111A, ComFlor® 51+
fig 111B, model, ComFlor® 51+
fig 111C, photo, ComFlor® 51+
fig 385A, WTC EXISTING STRUCTURE
fig 107A, drawing, details in color
fig 107B, details in color
fig 107C, details in color
fig 107D, details in color
fig 247A, WTC pattern of the pillars
fig 78A, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78B, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78C, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78D, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 688A, Maquette Masterplan
fig 711A, photo, Vynckier, Masterplan, Vooraanzicht maquette
fig 55A, section draft
fig 202A, WALL LIMIT AXONOMETRIC
fig 683A, Axonometrie primaire structuur
fig 683B, Axonometrie primaire structuur
fig 451A, photo, Gilbert & George
fig 605A, photo, Recycled U, Een manier van bouwen die de aarde zo min mogelijk belast. Als schakel tussen wonen en industrie die de site verbindt.
fig 605B, Recycled U
fig 51A, photo, Project Nonnemeersstraat, Ghent
fig 51B, drawing, Project Nonnemeersstraat, Ghent
fig 51C, drawing, Project Nonnemeersstraat, Ghent
fig 51D, drawing, Project Nonnemeersstraat, Ghent
fig 72A, drawing, Structure of the big warehouse on docks site
fig 378A, STRUCTUREMODEL_SERVICEFLATS_1
fig 378B, STRUCTUREMODEL_SERVICEFLATS_1
fig 735A, model, Project, The Modern Tulou
fig 735B, model, Project, The Modern Tulou
fig 735C, model, Project, The Modern Tulou
fig 735D, model, Project, The Modern Tulou
fig 536A, Schets, demonteerbare structuur, Jean Prouvé
fig 175A, drawing, Project BOMA
fig 175B, drawing, Project BOMA
fig 175C, drawing, Project BOMA
fig 175D, drawing, Project BOMA
fig 167A, photo, WORK – tussen
fig 167B, WORK – tussen
fig 85A, photo, Analysis of the site, structure, detail, 2D build-up of steel truss
fig 85B, photo, Analysis of the site, structure, detail, isometric
fig 85C, photo, Analysis of the site, structure, detail, isometric
fig 85D, photo, Analysis of the site, structure, detail, isometric
fig 225A, drawing, proces_24
fig 477A, FUNDERING
fig 754A, vynckier 2020
fig 538A, drawing, Magney House – Glenn Murcutt – section
fig 538B, drawing, Magney House – Glenn Murcutt – section
fig 256A, drawing, Structural core
fig 256B, drawing, Structural core
fig 709A, De Nieuwe Vynckier – Incubator – Passerel
fig 533A, Study of the capital
fig 329A, WTC – model
fig 329B, WTC – model
fig 156A, photo, research structure, A
fig 724A, photo, Vynckier 2, Vynckier 2, Principe 'bloembakken'
fig 103A, RECTOLIGHT
fig 740A, model, Project, Manchester Two
fig 740B, drawing, Project, Manchester Two
fig 740C, drawing, Project, Manchester Two
fig 740D, drawing, Project, Manchester Two
fig 309A, STRUCTURE WTC
fig 309B, STRUCTURE WTC
fig 71A, photo, axonometric view on docks site
fig 84A, photo, Study models, Model 1/25
fig 84B, photo, Study models, Model 1/25
fig 84C, photo, Study models, Model 1/25
fig 602A, Masterplan 25/03
fig 498A, model, Work in progress model CNC-site
fig 618A, Model of masterplan CONNECTING GRID 1.0
fig 224A, studio
fig 753A, STADSPARK VYNCKIER/ DE SCHIJF
fig 753B, STADSPARK VYNCKIER/ DE SCHIJF
fig 753C, STADSPARK VYNCKIER/ DE SCHIJF
fig 753D, STADSPARK VYNCKIER/ DE SCHIJF
fig 315A, Experience the real stuff
fig 315B, Experience the real stuff
fig 315C, Experience the real stuff
fig 580A, Digital masterplan, scale 1/1000
fig 65A, test model: terraces &facade
fig 319A, Lina Bo Bardi MASP under construction
fig 375A, cathédrale communale work documents
fig 375B, cathédrale communale work documents
fig 465A, bOb
fig 465B, bOb
fig 465C, bOb
fig 465D, bOb
fig 323A, plan woning
fig 271A, Shanghai Tower
fig 468A, drawing, hopvandenbrandenstraat.
fig 236A, model,Jukyung & Uk
fig 623A, U VYNCKIER
fig 623B, U VYNCKIER
fig 381A, Model structure
fig 476A, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 476B, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 476C, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 312A, Architecture Noordwijk
fig 312B, Architecture Noordwijk
fig 661A, Parochiezaal
fig 661B, Parochiezaal
fig 552A, photo, Site visit
fig 552B, photo, Site visit
fig 552C, photo, Site visit
fig 406A, model, Cathedrale Communale 1/200
fig 406B, model, Cathedrale Communale 1/200
fig 406C, model, Cathedrale Communale 1/200
fig 406D, model, Cathedrale Communale 1/200
fig 509A, TOWER
fig 509B, TOWER
fig 509C, TOWER
fig 509D, TOWER
fig 516A, model, END MODEL
fig 516B, model, END MODEL
fig 516C, model, END MODEL
fig 346A, How to become a Niemeyer
fig 691A, facades
fig 691B, facades
fig 691C, facades
fig 691D, facades
fig 529A, ANALYSE Steilneset Memorial – PETER ZUMTHOR, Steilneset Memorial - Peter Zumthor
fig 535A, Werf, Temporary school of Villejuif, Jean Prouvé
fig 441A, model, WTC remodel – final presentation
fig 441B, model, WTC remodel – final presentation
fig 441C, model, WTC remodel – final presentation
fig 441D, model, WTC remodel – final presentation
fig 483A, housewithonepencil.
fig 374A, Research roof structure diving tank
fig 374B, Research roof structure diving tank
fig 64A, DOME – EPS + SPRAYED CONCRETE, DOME - EPS + SPRAYED CONCRETE
fig 64B, DOME – EPS + SPRAYED CONCRETE
fig 64C, DOME – EPS + SPRAYED CONCRETE
fig 64D, DOME – EPS + SPRAYED CONCRETE
fig 330A, Werf station parking
fig 330B, Werf station parking, plan ondergrondse parking
fig 330C, Werf station parking, wapening om 4 bogen op aan te sluiten, door een fout is het beton te hoog gegoten waardoor alles terug is uitgekapt. Hierdoor komt de wapening in het beton bloot te liggen.
fig 330D, Werf station parking, beton voor de Kiss&Ride wordt gegoten.
fig 162A, REFERENCE – ALDO VAN EYCK SONSBEEK PAVILJOEN
fig 4A, photo, Hidden interior structure of the Tondelier sasholders, Interior of the Tondelier gasholders.
fig 4B, photo, Hidden interior structure of the Tondelier sasholders, Interior of the Tondelier gasholders.
fig 4C, photo, Hidden interior structure of the Tondelier sasholders, Interior of the Tondelier gasholders.
fig 4D, photo, Hidden interior structure of the Tondelier sasholders, Remaining structure Tondelier gasholder
fig 510A, drawing, DAUWSTRAAT DETAILSECTION
fig 192A, sketch
fig 667A, Markthal
fig 667B, model, Markthal
fig 667C, drawing, Markthal
fig 667D, model, Markthal
fig 608A, stay safe
fig 9A, photo, Getting some help, Getting some help.
fig 525A, Vynckier site bezoek
fig 257A, WTC beams
fig 2A, photo, ‘De Nobele’ – Site, Alongside the structure there's a workspace for a local artist.
fig 2B, photo, ‘De Nobele’ – Site, The unfinished upper part of the old textile factory.
fig 2C, photo, ‘De Nobele’ – Site, Detail of a main concrete column.
fig 2D, ‘De Nobele’ – Site, Analysis on which structure stays and which one disappears.
fig 701A, Plan / section Manchester
fig 701B, Plan / section Manchester
fig 701C, Plan / section Manchester
fig 120A, Reference structure steel
fig 120B, Reference structure steel
fig 120C, Reference structure steel
fig 297A, Civic Center – SOM
fig 276A, Welkom in de Noord-wijk
fig 276B, Welkom in de Noord-wijk
fig 276C, Welkom in de Noord-wijk
fig 276D, Welkom in de Noord-wijk
fig 155A, drawing, ISO
fig 18A, photo, Wood Hollow Core Slab
fig 18B, photo, Wood Hollow Core Slab
fig 237A, final axonometry
fig 50A, drawing, OLD vs. NEW
fig 570A, Vynckier oude luchtfoto
fig 705A, Facades
fig 705B, Facades
fig 659A, accordeon raam detail
fig 622A, lecture atelier Haegheman Temmerman
fig 642A, Masterplan model
fig 343A, Axo concrete factory
fig 744A, drawing, Tulou, reference - China
fig 744B, model, Tulou, rammed earth and wood structure
fig 744C, model, Tulou, rammed earth and wood structure
fig 744D, model, Tulou, structure
fig 16A, photo, SITE VISIT, The large wooden beams ready to be installed.
fig 16B, photo, SITE VISIT, Prefabricated elements are fixed on the columns.
fig 16C, photo, SITE VISIT, Steel elements where the secondary wooden beams will be fixed on.
fig 16D, photo, SITE VISIT, The building of the extension of the store of Aveve.
fig 714A, photo, Vynckier, Masterplan, Maquette
fig 431A, FINAL Model WTC
fig 431B, FINAL Model WTC
fig 431C, FINAL Model WTC
fig 205A, meetings, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 715A, photo, Vynckier, Masterplan, Overdekte markt met passerelle
fig 200A, photo, Axonometry Limit – Axel and Luna :)
fig 311A, Balkony garden
fig 311B, Balkony garden
fig 311C, Balkony garden
fig 311D, Balkony garden
fig 301A, WTC – plan section
fig 232A, proces_33
fig 634A, drawing, SECTION VYNCKIER
fig 453A, wonen VS industrie
fig 169A, research / site model
fig 169B, research / site model
fig 169C, research / site model
fig 726A, photo, Vynckier 2, Vynckier 2, Schets inkom
fig 259A, model WTC
fig 698A, Behind the scenes
fig 698B, Behind the scenes
fig 41A, drawing, Steel structure
fig 41B, drawing, Steel structure
fig 41C, drawing, Steel structure
fig 41D, drawing, Steel structure
fig 337A, REFERENTIE_3
fig 428A, Early plan social triplex
fig 669A, Maquette Terminal
fig 669B, Maquette Terminal
fig 669C, Maquette Terminal
fig 669D, Maquette Terminal
fig 136A, Sint – Amandsberg site, Gent. Detail Model, OLYMPUS DIGITAL CAMERA
fig 561A, Model Engine Room
fig 561B, Model Engine Room
fig 282A, werfbezoek – ultiem grid 740 x 740
fig 282B, werfbezoek – ultiem grid 740 x 740
fig 532A, drawing, Section of Art & Architecture Building
fig 543A, ECAM – Agwa Architects
fig 543B, ECAM – Agwa Architects
fig 246A, Axonometria
fig 8A, photo, FRAC, Dunkerque by Lacaton & Vasal, Frontal Facade, showing the old building and new 'copy' next to each other
fig 8B, photo, FRAC, Dunkerque by Lacaton & Vasal
fig 8C, photo, FRAC, Dunkerque by Lacaton & Vasal, The beautiful transparency of the skin invites the outside world in and ceases to be distant as an art institution might be. The shell does only what it is meant to do, protect its core from the outer elements. The glass and steel myth was reinterpreted and altered with a plastic and steel frame.
fig 8D, photo, FRAC, Dunkerque by Lacaton & Vasal, Steel connection between the old and new building.
fig 499A, roof structure
fig 102A, drawing, club house
fig 369A, Opwervendag Nemo link
fig 369B, Opwervendag Nemo link
fig 369C, Opwervendag Nemo link
fig 369D, Opwervendag Nemo link
fig 370A, Structural model WTC brewery
fig 370B, Structural model WTC brewery
fig 105A, WASSERIJ DER VLAANDEREN
fig 105B, WASSERIJ DER VLAANDEREN
fig 105C, WASSERIJ DER VLAANDEREN
fig 105D, WASSERIJ DER VLAANDEREN
fig 116A, drawing, Program, Freeing the site of cars by putting them in a tower of the same height as his modernistic neighbor.
fig 116B, photo, Program, Entering the city via the E17 viaduct
fig 116C, drawing, Program
fig 116D, photo, Program
fig 730A, Vynckier Site Masterplan
fig 660A, Steel Frame Box
fig 148A, Inversion of the field
fig 697A, 3RROR cad to jpg
fig 117A, model, Test model of 19 04 2017
fig 117B, model, Test model of 19 04 2017
fig 117C, model, Test model of 19 04 2017
fig 189A, MAIN PLAN
fig 182A, drawing, Masterplan final site gentbrugge
fig 182B, drawing, Masterplan final site gentbrugge, coworking
fig 182C, drawing, Masterplan final site gentbrugge
fig 182D, photo, Masterplan final site gentbrugge
fig 482A, Review Primary structure – Kanal Brussels, Processed with VSCO with m5 preset
fig 1A, drawing, STEEL JOINT
fig 449A, Old vs. new
fig 581A, drawing, Masterplan
fig 61A, roof on/between containers
fig 61B, roof on/between containers
fig 61C, roof on/between containers
fig 61D, roof on/between containers
fig 619A, werfbezoek
fig 355A, LOFTS With gardens in double skin facade
fig 261A, photo, REA STRUCTURE
fig 261B, drawing, REA STRUCTURE
fig 700A, Axonometries CONNECTING GRID
fig 700B, Axonometries CONNECTING GRID
fig 517A, model, END MODEL CNC
fig 517B, model, END MODEL CNC
fig 517C, END MODEL CNC
fig 20A, drawing, stabilizing structural systems, different ways to stabilize structure
fig 6A, drawing, Drawing connection of steel structure
fig 6B, drawing, Drawing connection of steel structure
fig 298A, WTC sections
fig 434A, drawing, WTC remodel – detail of roof of rooftop extension
fig 434B, drawing, WTC remodel – detail of roof of rooftop extension
fig 434C, drawing, WTC remodel – detail of roof of rooftop extension
fig 434D, drawing, WTC remodel – detail of roof of rooftop extension
fig 21A, photo, Tram depot Marconi – site visit
fig 21B, photo, Tram depot Marconi – site visit
fig 21C, photo, Tram depot Marconi – site visit
fig 461A, Enclosed house
fig 344A, Drawing of concrete silo
fig 187A, studio at carlos ramos’ pavillion
fig 44A, drawing, STEEL JOINT
fig 285A, werfbezoek – logisitek verdeelverdiep
fig 285B, werfbezoek – logisitek verdeelverdiep
fig 165A, analysing site Gents Bakkershuis
fig 109A, photo, Japanese House, 1907, Wood construction by 'master carpenter' Nishida Isaburo
fig 677A, drawing, Dwarse snede
fig 501A, photo, maquettefoto A. Lavalléestraat
fig 222A, model, proces_22
fig 751A, STADSPARK VYNCKIER/ DE SCHIJF
fig 751B, STADSPARK VYNCKIER/ DE SCHIJF
fig 751C, STADSPARK VYNCKIER/ DE SCHIJF
fig 362A, Structure underneath diving tank
fig 243A, model, Luciana Ligeiro and Marta Faustino
fig 248A, photo, exploring the deep plan
fig 345A, Open structure + circulation
fig 530A, Analyse Allmannajuvet Zinc Mine Museum – Peter Zumthor, Allmannajuvet Zinc Mine Museum - Peter Zumthor
fig 500A, A110 – 2M wide cohousing
fig 401A, Brewery visit
fig 401B, Brewery visit
fig 32A, drawing, Hangar INCO, Exploded construction of the hangar
fig 32B, drawing, Hangar INCO, Composition detail of brick, concrete columns and plinth
fig 32C, Hangar INCO
fig 32D, Hangar INCO
fig 417A, omgeving analyse
fig 417B, drawing, omgeving analyse
fig 417C, drawing, omgeving analyse
fig 417D, drawing, omgeving analyse
fig 692A, floorplan
fig 692B, floorplan
fig 692C, floorplan
fig 443A, Gilbert & George
fig 665A, working in quarantaine
fig 405A, drawing, Drawing of buildup wintergarden
fig 469A, l’unionfaitlaforce
fig 423A, waffle slab
fig 423B, waffle slab
fig 382A, The masters refer
fig 757A, photo, Vynckier 2, Principe oud en nieuw, Maquette
fig 38A, drawing, pergola without roof connection
fig 467A, Tree Tops 2.0
fig 79A, drawing, detail construction garage box, construction detail precast concrete elements
fig 392A, CATHEDRALE COMMUNALE_PERSPECTIVE
fig 603A, Vynckier Site Masterplan Model
fig 648A, MASTERPLAN VYNCKIER
fig 553A, Parkeergebouw Ledeberg, Nieuw Parkeergebouw Ledeberg
fig 615A, Masterplan 25/03 & 1/04 2020
fig 615B, Masterplan 25/03 & 1/04 2020
fig 615C, Masterplan 25/03 & 1/04 2020
fig 615D, Masterplan 25/03 & 1/04 2020
fig 563A, inplantingsmaquette, burst
fig 299A, WTC situation plan
fig 172A, drawing, Research new structures in combination with existing
fig 172B, drawing, Research new structures in combination with existing
fig 172C, drawing, Research new structures in combination with existing, acoustic solutions - new vs. existing (2)
fig 172D, drawing, Research new structures in combination with existing
fig 491A, Structure Beekstraat
fig 211A, proces_12
fig 528A, Photo during construction – Healey Guest House – ‘Cocoon House’
fig 403A, drawing, Connection to the floor
fig 539A, photo, Rue Franklin 25bis, Paris – Auguste Perret
fig 134A, model, Structure models
fig 300A, WTC axo concepts
fig 230A, proces_32
fig 96A, mazda site koopvaardijlaan, Drawing of the interior structure on the exterior wall. Also the remnants of a connected wooden building that burned down in the 1970's is still visible in the drawing.
fig 96B, mazda site koopvaardijlaan, cast concrete column
fig 96C, mazda site koopvaardijlaan, View towards aisle on the side of the tracks.
fig 96D, mazda site koopvaardijlaan
fig 354A, Vertical Garden WTC
fig 354B, Vertical Garden WTC
fig 287A, sketch on existing plan
fig 231A, AXONOMETRIC
fig 135A, model, Final model
fig 627A, drawing, Construction in wood for Manchester
fig 694A, Model Manchester
fig 694B, Model Manchester
fig 694C, Model Manchester
fig 694D, Model Manchester
fig 571A, bouw fabriek schoorsteen
fig 571B, bouw fabriek schoorsteen
fig 571C, bouw fabriek schoorsteen
fig 70A, photo, Pictures Nonnemeersstraat, Ghent
fig 70B, photo, Pictures Nonnemeersstraat, Ghent
fig 614A, Pavilion on Vynckier Site
fig 614B, Pavilion on Vynckier Site
fig 614C, Pavilion on Vynckier Site
fig 614D, Pavilion on Vynckier Site
fig 398A, model, Small 1/200 scale model
fig 566A, Front façade and back façade of building 4 and 4A, Vynckier site
fig 235A, model, Laia Bonet and Charlette Frémont
fig 395A, model, Cathedrale Communale
fig 395B, model, Cathedrale Communale
fig 395C, model, Cathedrale Communale
fig 395D, model, Cathedrale Communale
fig 488A, Stut-opties
fig 360A, Overlaying Bamboo “hinge”
fig 636A, Masterplan level 1
fig 407A, drawing, DETAIL_SILO
fig 508A, BEEKSTRAAT
fig 508B, BEEKSTRAAT
fig 508C, BEEKSTRAAT
fig 758A, photo, Vynckier 2, Principe authentieke en groene gevel, Maquette
fig 664A, Concrete Disc building
fig 213A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 433A, drawing, WTC remodel – section and facades
fig 433B, drawing, WTC remodel – section and facades
fig 433C, drawing, WTC remodel – section and facades
fig 433D, WTC remodel – section and facades
fig 269A, OCBC Bank
fig 625A, Structuur Schijf
fig 721A, photo, Vynckier 2, Vynckier 2, Architectuurplan, Gelijkvloers
fig 262A, REA new ramp
fig 69A, models
fig 729A, Vynckier Site Saw-tooth roof
fig 729B, Vynckier Site Saw-tooth roof
fig 729C, Vynckier Site Saw-tooth roof
fig 729D, Vynckier Site Saw-tooth roof
fig 54A, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54B, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54C, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54D, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 174A, drawing, current structure analyse
fig 600A, The Brewing Process
fig 685A, 27/05
fig 685B, 27/05
fig 685C, 27/05
fig 685D, drawing, 27/05
fig 582A, Vynckier 5
fig 710A, Model
fig 609A, Masterplan V2
fig 609B, Masterplan V2
fig 170A, photo, REFERENCES
fig 170B, REFERENCES
fig 170C, REFERENCES
fig 170D, REFERENCES
fig 88A, MODEL #4
fig 649A, Green Industry ?
fig 626A, Masterplan Model 2
fig 518A, Structural analysis, AFASIA, P. FLammer
fig 560A, Vynckier
fig 560B, Vynckier
fig 179A, Primary & New
fig 11A, photo, FC Muide
fig 11B, photo, FC Muide
fig 11C, photo, FC Muide
fig 631A, drawing, Section of a Tulou, traditional housing in China
fig 631B, drawing, Section of a Tulou, traditional housing in China
fig 373A, Glass corner “box” vertical garden
fig 283A, werfbezoek – fout wapeningsstaal
fig 534A, photo, Vynckier 1981-94
fig 534B, photo, Vynckier 1981-94
fig 45A, drawing, shipping container
fig 45B, drawing, shipping container
fig 45C, drawing, shipping container
fig 198A, sketch
fig 185A, DECORMAQUETTE
fig 350A, Scheme connections in steel
fig 347A, La Fábrica – Ricardo Bofill
fig 452A, photo, Collage geïnspireerd op Gilbert & George
fig 526A, photo, Les Monseigneurs – Primary Talks
fig 526B, Les Monseigneurs – Primary Talks
fig 588A, model, Proposal Masterplan Model
fig 454A, Repitition
fig 168A, Tempory billboard on tempory structure
fig 460A, depotdesign
fig 719A, structure proposition
fig 719B, structure proposition
fig 719C, structure proposition
fig 620A, werfbezoek
fig 746A, drawing, axo Manchester and Tulou, axonometric drawing
fig 264A, Opbouw maquette S1:50 WTC
fig 221A, model, work in progress
fig 658A, primary arcs
fig 216A, drawing, proces_13
fig 759A, model, Vynckier 2, Principe, Inkom
fig 479A, vertrapping
fig 671A, Site section Terminal
fig 104A, drawing, supporting points in sports
fig 104B, supporting points in sports
fig 104C, supporting points in sports
fig 550A, Manchester building – structure
fig 550B, Manchester building – structure
fig 576A, model, Masterplan Vynckiersite
fig 576B, model, Masterplan Vynckiersite
fig 307A, Site Visit 1
fig 307B, Site Visit 1
fig 307C, Site Visit 1
fig 307D, Site Visit 1
fig 322A, exploded toren
fig 327A, work documents 20180417
fig 327B, work documents 20180417
fig 327C, work documents 20180417
fig 220A, drawing, proces_20
fig 638A, Idea Superstudio on ConnectingGrid
fig 12A, photo, Industrial Structure
fig 12B, photo, Industrial Structure
fig 95A, Tube and Coupler Scaffolds
fig 95B, Tube and Coupler Scaffolds
fig 95C, Tube and Coupler Scaffolds
fig 95D, Tube and Coupler Scaffolds
fig 154A, HAMAM – 17.04
fig 154B, HAMAM – 17.04
fig 74A, model, MODEL – WASSERIJ DER VLAANDEREN, WASSERIJ DER VLAANDEREN
fig 53A, visit construction site
fig 53B, visit construction site
fig 53C, visit construction site
fig 414A, Torre Velasca
fig 414B, Torre Velasca
fig 279A, Steel connections WTC +24
fig 279B, Steel connections WTC +24
fig 279C, Steel connections WTC +24
fig 279D, Steel connections WTC +24
fig 52A, CONSTRUCTION SITE
fig 713A, photo, Vynckier, Masterplan, Structuur site
fig 214A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 594A, photo, Vynckier Site, masterplan, sketch
fig 34A, model, Lignatur floor/ roof element, Lignatur floor element - hollow core slab
fig 34B, model, Lignatur floor/ roof element, Lignatur floor element - Detail possibilties ducts
fig 589A, drawing, VERTICAL FARMING WITH WATER PURIFICATION
fig 589B, photo, VERTICAL FARMING WITH WATER PURIFICATION
fig 442A, model, WTC remodel – puzzle
fig 442B, model, WTC remodel – puzzle
fig 442C, model, WTC remodel – puzzle
fig 442D, model, WTC remodel – puzzle
fig 5A, photo, Concrete Structure, Concrete Grid Structure
fig 5B, photo, Concrete Structure, Concrete Skylight
fig 151A, photo, Site ‘Huidevetterken’, L-profile column
fig 151B, photo, Site ‘Huidevetterken’, Steel detail
fig 672A, Masterplan Vynckier
fig 747A, photo, Strabag – Stapelplein Gent, Hole for crane inside basement
fig 742A, Vynckier site, model
fig 682A, model, Fragment schijf
fig 682B, Fragment schijf
fig 682C, Fragment schijf
fig 682D, Fragment schijf
fig 106A, drawing, SITE
fig 106B, drawing, SITE
fig 141A, Site visit Sint-Martens-Latem
fig 141B, Site visit Sint-Martens-Latem
fig 141C, Site visit Sint-Martens-Latem
fig 141D, Site visit Sint-Martens-Latem
fig 657A, drawing parochiezaal
fig 37A, drawing, corner of the sport fence
fig 416A, Final design detail
fig 416B, Final design detail
fig 492A, Work in progress – Dauwstraat, Processed with VSCO with preset
fig 410A, drawing, open apartment
fig 425A, reference
fig 425B, reference
fig 425C, reference, construction
fig 630A, model, De Schijf
fig 630B, model, De Schijf
fig 260A, model detail
fig 597A, drawing, 25/03
fig 597B, drawing, 25/03
fig 597C, model, 25/03
No images selected…
fig 368A Bochten testen, posted by Laura Vanderdonckt at 08.05.18 (filed under: concrete steel)
fig 368B Bochten testen, posted by Laura Vanderdonckt at 08.05.18 (filed under: concrete steel)
fig 368C Bochten testen, posted by Laura Vanderdonckt at 08.05.18 (filed under: concrete steel)
fig 227A proces_29, posted by Charlette Fremont at 26.07.17 (filed under: brick)
fig 650A The Nantes Saint-Nazaire Higher School of Fine Arts, posted by Bert Van Wijnendaele at 06.05.20 (filed under: glass)
fig 653A Building with shed structure, posted by Lode De Smet Van Damme at 06.05.20 (filed under: brick steel)
fig 13A photo, Arrival_Tower, posted by Yvonne van der Poel at 15.03.17 (filed under: concrete plastics)
fig 139A DT, posted by Manon Coppens at 31.05.17 (filed under: brick concrete steel wood)
fig 139B DT, posted by Manon Coppens at 31.05.17 (filed under: brick concrete steel wood)
fig 562A section engine room archive, posted by Maurits Verstraete at 06.03.20 (filed under: concrete)
fig 267A John Hancock Center, posted by Mattias Vandenbempt at 06.03.18 (filed under: steel)
fig 267B John Hancock Center, posted by Mattias Vandenbempt at 06.03.18 (filed under: steel)
fig 267C John Hancock Center, posted by Mattias Vandenbempt at 06.03.18 (filed under: steel)
fig 267D John Hancock Center, posted by Mattias Vandenbempt at 06.03.18 (filed under: steel)
fig 218A drawing, proces_18, posted by Axel Fangueiro at 26.07.17 (filed under: brick)
fig 760A ontwerpschetsen, posted by Arne Ilsbroekx at 31.05.20 (filed under:)
fig 760B ontwerpschetsen, posted by Arne Ilsbroekx at 31.05.20 (filed under:)
fig 760C ontwerpschetsen, posted by Arne Ilsbroekx at 31.05.20 (filed under:)
fig 760D ontwerpschetsen, posted by Arne Ilsbroekx at 31.05.20 (filed under:)
fig 209A drawing, proces_10, posted by Floris De Bruyn at 26.07.17 (filed under: steel)
fig 7A drawing, types of compound beam, posted by Helen Van de Vloet at 05.03.17 (filed under: concrete)
fig 184A Design, posted by Kevin De Roeck at 31.05.17 (filed under: brick plastics steel)
fig 184B Design, posted by Kevin De Roeck at 31.05.17 (filed under: brick plastics steel)
fig 184C Design, posted by Kevin De Roeck at 31.05.17 (filed under: brick plastics steel)
fig 184D Design, posted by Kevin De Roeck at 31.05.17 (filed under: brick plastics steel)
fig 153A DRAWINGS, posted by Manon Coppens at 31.05.17 (filed under: brick concrete steel wood)
fig 153B DRAWINGS, posted by Manon Coppens at 31.05.17 (filed under: brick concrete steel wood)
fig 153C DRAWINGS, posted by Manon Coppens at 31.05.17 (filed under: brick concrete steel wood)
fig 153D DRAWINGS, posted by Manon Coppens at 31.05.17 (filed under: brick concrete steel wood)
fig 197A work in progress … axonometry, posted by Charlette Fremont at 24.07.17 (filed under: concrete steel)
fig 696A Modelshots CONNECTING GRID, posted by Aaron Vanacker at 26.05.20 (filed under: concrete steel)
fig 696B Modelshots CONNECTING GRID, posted by Aaron Vanacker at 26.05.20 (filed under: concrete steel)
fig 696C Modelshots CONNECTING GRID, posted by Aaron Vanacker at 26.05.20 (filed under: concrete steel)
fig 696D Modelshots CONNECTING GRID, posted by Aaron Vanacker at 26.05.20 (filed under: concrete steel)
fig 568A Photo of of interior staircase at building 4, Vynckier site, posted by Aaron Vanacker at 08.03.20 (filed under:)
fig 36A photo, Woonzorgcentrum Van Lierde, posted by Stan Guldemont at 15.03.17 (filed under: brick)
fig 193A meetings, posted by ricardo leitao at 24.07.17 (filed under: concrete)
fig 531A drawing, Sketch of Art & Architecture Building, posted by Aaron Vanacker at 19.02.20 (filed under: concrete)
fig 662A photo, shed structure, posted by Maurits Verstraete at 14.05.20 (filed under: concrete plastics steel)
fig 464A House Botte – bOb Van Reeth, posted by Inge Habils at 04.03.19 (filed under: concrete glass wood)
fig 123A New structures, posted by Mathias Tack at 31.05.17 (filed under: brick steel wood)
fig 737A Primary Circles_structural system, posted by Emile Bouckaert at 27.05.20 (filed under: concrete)
fig 495A test materiality – housing tower, posted by Sandrine Janssens at 07.05.19 (filed under: concrete wood)
fig 57A Mid-Process model, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel wood)
fig 101A WASSERIJ DER VLAANDEREN – ISO LOODS, posted by Manon Coppens at 24.05.17 (filed under: brick concrete steel)
fig 101B WASSERIJ DER VLAANDEREN – ISO LOODS, posted by Manon Coppens at 24.05.17 (filed under: brick concrete steel)
fig 101C WASSERIJ DER VLAANDEREN – ISO LOODS, posted by Manon Coppens at 24.05.17 (filed under: brick concrete steel)
fig 101D drawing, WASSERIJ DER VLAANDEREN – ISO LOODS, posted by Manon Coppens at 24.05.17 (filed under: brick concrete steel)
fig 722A axo existing structure, posted by Cisse Vercauteren at 27.05.20 (filed under: steel wood)
fig 673A Structuur Manchester 2, posted by Anouk Depaepe at 26.05.20 (filed under: steel)
fig 245A model, Axel Fangueiro and Luna Fonseca, posted by Floris De Bruyn at 27.07.17 (filed under: brick concrete wood)
fig 286A werfbezoek – kraan in liftschacht, posted by Sophie Leemans at 13.03.18 (filed under: concrete steel)
fig 457A Enclosed houses, posted by Tom Galmart at 26.02.19 (filed under:)
fig 457B photo, Enclosed houses, posted by Tom Galmart at 26.02.19 (filed under:)
fig 163A Proces, posted by Hannes Mol at 31.05.17 (filed under: concrete wood)
fig 163B drawing, Proces, posted by Hannes Mol at 31.05.17 (filed under: concrete wood)
fig 163C Proces, posted by Hannes Mol at 31.05.17 (filed under: concrete wood)
fig 163D Proces, posted by Hannes Mol at 31.05.17 (filed under: concrete wood)
fig 494A NG17 – preliminary design 06/05 – hostel + offices, posted by Cedric Du Bois at 07.05.19 (filed under: concrete wood)
fig 494B NG17 – preliminary design 06/05 – hostel + offices, posted by Cedric Du Bois at 07.05.19 (filed under: concrete wood)
fig 686A model, posted by Cisse Vercauteren at 26.05.20 (filed under: concrete steel wood)
fig 686B model, posted by Cisse Vercauteren at 26.05.20 (filed under: concrete steel wood)
fig 686C model, posted by Cisse Vercauteren at 26.05.20 (filed under: concrete steel wood)
fig 686D model, posted by Cisse Vercauteren at 26.05.20 (filed under: concrete steel wood)
fig 293A WTC I: Axo op 2 verdiepen, posted by Eva Van Craenenbroeck at 19.03.18 (filed under: concrete steel)
fig 397A model, Final scale model, posted by Sven de Smet at 03.06.18 (filed under: concrete glass steel wood)
fig 81A drawing, ANALYSE EXISTING STRUCTURES, posted by Tim Belaen at 24.05.17 (filed under: steel)
fig 481A KANAL review KUL UCL ULB, posted by Floris De Bruyn at 01.04.19 (filed under:)
fig 481B KANAL review KUL UCL ULB, posted by Floris De Bruyn at 01.04.19 (filed under:)
fig 481C KANAL review KUL UCL ULB, posted by Floris De Bruyn at 01.04.19 (filed under:)
fig 578A Model of vision on masterplan, scale 1/1000, posted by Aaron Vanacker at 18.03.20 (filed under:)
fig 496A drawing, Betonnen wafelstructuur, posted by Enver Peeters at 14.05.19 (filed under: concrete)
fig 693A research existing structure, posted by Cisse Vercauteren at 26.05.20 (filed under: steel wood)
fig 484A work in progress, posted by Sandrine Janssens at 29.04.19 (filed under: brick wood)
fig 484B work in progress, posted by Sandrine Janssens at 29.04.19 (filed under: brick wood)
fig 549A Bijgebouw Manchester 1, posted by Lene Lemmens at 27.02.20 (filed under: concrete)
fig 180A model, Site de Porre – primary structure model, posted by Deborah Dumarey at 31.05.17 (filed under: concrete steel wood)
fig 338A Werkmaquette, posted by Carolien Vereecken at 23.04.18 (filed under: concrete steel)
fig 277A Ceiling Infrastructure plan, posted by Maxim Lefebvre at 07.03.18 (filed under: concrete glass steel)
fig 183A Structural Analysis, posted by Kevin De Roeck at 31.05.17 (filed under: brick steel)
fig 183B Structural Analysis, posted by Kevin De Roeck at 31.05.17 (filed under: brick steel)
fig 183C Structural Analysis, posted by Kevin De Roeck at 31.05.17 (filed under: brick steel)
fig 183D Structural Analysis, posted by Kevin De Roeck at 31.05.17 (filed under: brick steel)
fig 131A Blekerijstraat site photos, posted by Michiel Vrolix at 31.05.17 (filed under: concrete steel)
fig 131B Blekerijstraat site photos, posted by Michiel Vrolix at 31.05.17 (filed under: concrete steel)
fig 131C Blekerijstraat site photos, posted by Michiel Vrolix at 31.05.17 (filed under: concrete steel)
fig 131D Blekerijstraat site photos, posted by Michiel Vrolix at 31.05.17 (filed under: concrete steel)
fig 121A Pictures Model, posted by Mathias Tack at 31.05.17 (filed under: brick steel wood)
fig 121B Pictures Model, posted by Mathias Tack at 31.05.17 (filed under: brick steel wood)
fig 504A Housing tower – AXO, posted by Sandrine Janssens at 02.06.19 (filed under:)
fig 426A drawing, pt.2, posted by Alexandre Basile at 04.06.18 (filed under: glass steel)
fig 426B drawing, pt.2, posted by Alexandre Basile at 04.06.18 (filed under: glass steel)
fig 426C drawing, pt.2, posted by Alexandre Basile at 04.06.18 (filed under: glass steel)
fig 473A GEORGE & GILBERT, posted by Tom Galmart at 10.03.19 (filed under:)
fig 473B GEORGE & GILBERT, posted by Tom Galmart at 10.03.19 (filed under:)
fig 547A Aansluiting staalframebouw, posted by Lene Lemmens at 27.02.20 (filed under: steel)
fig 157A model masterplan, posted by Helen Van de Vloet at 31.05.17 (filed under: concrete glass plastics steel wood)
fig 77A Concrete building elements, posted by Yvonne van der Poel at 24.05.17 (filed under: concrete)
fig 77B Concrete building elements, posted by Yvonne van der Poel at 24.05.17 (filed under: concrete)
fig 77C Concrete building elements, posted by Yvonne van der Poel at 24.05.17 (filed under: concrete)
fig 77D Concrete building elements, posted by Yvonne van der Poel at 24.05.17 (filed under: concrete)
fig 590A Proposal Masterplan, posted by Dean Peeters at 18.03.20 (filed under:)
fig 706A De Nieuwe Vynckier – Incubator – Concept, posted by Bert Van Wijnendaele at 27.05.20 (filed under: steel)
fig 15A photo, SILOS, TANKS & HOLDERS, posted by Alexander Van den Spiegel at 15.03.17 (filed under: steel)
fig 15B drawing, SILOS, TANKS & HOLDERS, posted by Alexander Van den Spiegel at 15.03.17 (filed under: steel)
fig 58A Model #1, posted by Stan Guldemont at 24.05.17 (filed under: wood)
fig 58B Model #1, posted by Stan Guldemont at 24.05.17 (filed under: wood)
fig 436A CATHEDRALE COMMUNALE_JURY, posted by Sophie Leemans at 11.06.18 (filed under: concrete steel)
fig 436B CATHEDRALE COMMUNALE_JURY, posted by Sophie Leemans at 11.06.18 (filed under: concrete steel)
fig 436C CATHEDRALE COMMUNALE_JURY, posted by Sophie Leemans at 11.06.18 (filed under: concrete steel)
fig 436D CATHEDRALE COMMUNALE_JURY, posted by Sophie Leemans at 11.06.18 (filed under: concrete steel)
fig 341A Detail of 1 Bligh Street, posted by Sven de Smet at 23.04.18 (filed under: glass steel)
fig 756A photo, Vynckier 2, posted by Jolien De Smet at 27.05.20 (filed under:)
fig 574A Vynckier Site masterplan sketch, posted by Lode De Smet Van Damme at 16.03.20 (filed under: brick)
fig 633A fake Mies, posted by Floris De Bruyn at 28.04.20 (filed under:)
fig 633B fake Mies, posted by Floris De Bruyn at 28.04.20 (filed under:)
fig 748A photo, Jubileumlaan, posted by Astrid Christiaens at 27.05.20 (filed under:)
fig 233A model, Valentin Graf and Borja Fernandez, posted by Valentin Graf at 26.07.17 (filed under: concrete)
fig 708A De Nieuwe Vynckier – Incubator – Model, posted by Bert Van Wijnendaele at 27.05.20 (filed under: steel)
fig 194A meetings, posted by ricardo leitao at 24.07.17 (filed under: concrete)
fig 142A Urban design, posted by Kevin De Roeck at 31.05.17 (filed under: brick steel)
fig 142B Urban design, posted by Kevin De Roeck at 31.05.17 (filed under: brick steel)
fig 681A model, Dwarse snede woning, posted by Anouk Depaepe at 26.05.20 (filed under: concrete steel)
fig 727A photo, Vynckier 2, posted by Jolien De Smet at 27.05.20 (filed under:)
fig 542A ECAM – Agwa Architects, posted by Lara Winderickx at 26.02.20 (filed under: steel)
fig 542B ECAM – Agwa Architects, posted by Lara Winderickx at 26.02.20 (filed under: steel)
fig 419A drawing, proces, posted by LindsayPrat at 04.06.18 (filed under: concrete)
fig 419B proces, posted by LindsayPrat at 04.06.18 (filed under: concrete)
fig 647A PALACE OF LABOUR, TURIN, 1961, posted by Emile Bouckaert at 05.05.20 (filed under: concrete)
fig 367A Axo volumes, posted by Carolien Vereecken at 07.05.18 (filed under: concrete steel)
fig 367B Axo volumes, posted by Carolien Vereecken at 07.05.18 (filed under: concrete steel)
fig 339A Ingang wtc via kern, posted by Carolien Vereecken at 23.04.18 (filed under:)
fig 763A photo, Eve Babitz playing chess with Marcel Duchamp, Pasadena 1963, posted by Floris De Bruyn at 29.06.20 (filed under:)
fig 280A werfbezoek, posted by Dorien Moonen at 12.03.18 (filed under: brick)
fig 87A Analysis structure De Porre, posted by Deborah Dumarey at 24.05.17 (filed under: concrete steel)
fig 87B Analysis structure De Porre, posted by Deborah Dumarey at 24.05.17 (filed under: concrete steel)
fig 87C Analysis structure De Porre, posted by Deborah Dumarey at 24.05.17 (filed under: concrete steel)
fig 87D Analysis structure De Porre, posted by Deborah Dumarey at 24.05.17 (filed under: concrete steel)
fig 204A meetings, posted by Floris De Bruyn at 26.07.17 (filed under: concrete)
fig 537A The Smithsons’ New Brutalism, posted by linde huygens at 21.02.20 (filed under: brick concrete glass steel)
fig 537B The Smithsons’ New Brutalism, posted by linde huygens at 21.02.20 (filed under: brick concrete glass steel)
fig 302A Basiliek van Koekelberg, posted by leilaviaene at 21.03.18 (filed under: brick)
fig 302B Basiliek van Koekelberg, posted by leilaviaene at 21.03.18 (filed under: brick)
fig 418A model, werkmaquette, posted by Dorien Moonen at 04.06.18 (filed under:)
fig 418B model, werkmaquette, posted by Dorien Moonen at 04.06.18 (filed under:)
fig 294A WTC NIV + 27, posted by charlie lanckvrind at 19.03.18 (filed under: steel)
fig 365A WTC 1 – model of mosque, posted by Karel Verdonck at 02.05.18 (filed under: concrete glass steel)
fig 365B WTC 1 – model of mosque, posted by Karel Verdonck at 02.05.18 (filed under: concrete glass steel)
fig 335A REFERENTIE_2, posted by Louis Lories at 22.04.18 (filed under: steel)
fig 334A WERKMAQUETTE_3.0, posted by Louis Lories at 22.04.18 (filed under:)
fig 637A Structure ConnectingGrid, posted by Nicolas Vanneste at 29.04.20 (filed under:)
fig 640A Shed structure with new volume, posted by Maurits Verstraete at 29.04.20 (filed under: concrete steel)
fig 640B Shed structure with new volume, posted by Maurits Verstraete at 29.04.20 (filed under: concrete steel)
fig 60A photo, SIMPLE CONSTRUCTION, posted by Manon Coppens at 24.05.17 (filed under: steel)
fig 60B SIMPLE CONSTRUCTION, posted by Manon Coppens at 24.05.17 (filed under: steel)
fig 60C SIMPLE CONSTRUCTION, posted by Manon Coppens at 24.05.17 (filed under: steel)
fig 313A Analysing the parking lot, posted by Femke Van Doorsselaere at 16.04.18 (filed under: concrete)
fig 313B Analysing the parking lot, posted by Femke Van Doorsselaere at 16.04.18 (filed under: concrete)
fig 313C Analysing the parking lot, posted by Femke Van Doorsselaere at 16.04.18 (filed under: concrete)
fig 313D Analysing the parking lot, posted by Femke Van Doorsselaere at 16.04.18 (filed under: concrete)
fig 470A Collage Rules, posted by Cedric Du Bois at 06.03.19 (filed under:)
fig 263A drawing, WTC_subtraction, posted by Timotheus de Beir at 06.01.18 (filed under: concrete steel)
fig 263B drawing, WTC_subtraction, posted by Timotheus de Beir at 06.01.18 (filed under: concrete steel)
fig 695A Modelshots CONNECTING GRID, posted by Nicolas Vanneste at 26.05.20 (filed under: concrete steel)
fig 695B Modelshots CONNECTING GRID, posted by Nicolas Vanneste at 26.05.20 (filed under: concrete steel)
fig 695C model, Modelshots CONNECTING GRID, posted by Nicolas Vanneste at 26.05.20 (filed under: concrete steel)
fig 695D Modelshots CONNECTING GRID, posted by Nicolas Vanneste at 26.05.20 (filed under: concrete steel)
fig 731A Vynckier Circle, posted by Maurits Verstraete at 27.05.20 (filed under: brick concrete wood)
fig 731B Vynckier Circle, posted by Maurits Verstraete at 27.05.20 (filed under: brick concrete wood)
fig 731C Vynckier Circle, posted by Maurits Verstraete at 27.05.20 (filed under: brick concrete wood)
fig 161A Conceptual Drawings ‘Zonder-Naamstraat Site’, posted by Stan Guldemont at 31.05.17 (filed under: wood)
fig 161B drawing, Conceptual Drawings ‘Zonder-Naamstraat Site’, posted by Stan Guldemont at 31.05.17 (filed under: wood)
fig 161C Conceptual Drawings ‘Zonder-Naamstraat Site’, posted by Stan Guldemont at 31.05.17 (filed under: wood)
fig 161D Conceptual Drawings ‘Zonder-Naamstraat Site’, posted by Stan Guldemont at 31.05.17 (filed under: wood)
fig 108A photo, Gent Voorhaven PortService Warehouses, posted by Rosa Fens at 24.05.17 (filed under: brick steel)
fig 108B photo, Gent Voorhaven PortService Warehouses, posted by Rosa Fens at 24.05.17 (filed under: brick steel)
fig 108C photo, Gent Voorhaven PortService Warehouses, posted by Rosa Fens at 24.05.17 (filed under: brick steel)
fig 108D photo, Gent Voorhaven PortService Warehouses, posted by Rosa Fens at 24.05.17 (filed under: brick steel)
fig 743A drawing, Manchester, posted by Astrid Christiaens at 27.05.20 (filed under:)
fig 743B drawing, Manchester, posted by Astrid Christiaens at 27.05.20 (filed under:)
fig 743C drawing, Manchester, posted by Astrid Christiaens at 27.05.20 (filed under:)
fig 743D drawing, Manchester, posted by Astrid Christiaens at 27.05.20 (filed under:)
fig 349A Scheme structures silo, posted by Lien De Jonghe at 23.04.18 (filed under: steel)
fig 349B Scheme structures silo, posted by Lien De Jonghe at 23.04.18 (filed under: steel)
fig 471A belibel, posted by Seyfettin Gokmen at 08.03.19 (filed under:)
fig 133A photo, Final urban model, posted by Jean-Louis Verstraete at 31.05.17 (filed under: steel)
fig 133B Final urban model, posted by Jean-Louis Verstraete at 31.05.17 (filed under: steel)
fig 133C model, Final urban model, posted by Jean-Louis Verstraete at 31.05.17 (filed under: steel)
fig 396A model, Cathedrale Communale, posted by leilaviaene at 03.06.18 (filed under: concrete steel wood)
fig 396B model, Cathedrale Communale, posted by leilaviaene at 03.06.18 (filed under: concrete steel wood)
fig 396C model, Cathedrale Communale, posted by leilaviaene at 03.06.18 (filed under: concrete steel wood)
fig 396D model, Cathedrale Communale, posted by leilaviaene at 03.06.18 (filed under: concrete steel wood)
fig 702A Axonometries CONNECTING GRID, posted by Nicolas Vanneste at 26.05.20 (filed under:)
fig 702B Axonometries CONNECTING GRID, posted by Nicolas Vanneste at 26.05.20 (filed under:)
fig 720A photo, Vynckier 2, posted by Jolien De Smet at 27.05.20 (filed under:)
fig 512A Final maquette, posted by Gala Kenis at 04.06.19 (filed under: concrete steel)
fig 512B Final maquette, posted by Gala Kenis at 04.06.19 (filed under: concrete steel)
fig 512C photo, Final maquette, posted by Gala Kenis at 04.06.19 (filed under: concrete steel)
fig 420A sfeer, posted by LindsayPrat at 04.06.18 (filed under: concrete)
fig 383A Final design: looking inside the model, posted by Femke Van Doorsselaere at 03.06.18 (filed under: concrete glass)
fig 383B Final design: looking inside the model, posted by Femke Van Doorsselaere at 03.06.18 (filed under: concrete glass)
fig 125A Site visit, posted by Mathias Tack at 31.05.17 (filed under: concrete steel)
fig 520A space and event, posted by Jan Ilsbroekx at 19.02.20 (filed under: concrete plastics)
fig 137A model, photos models, posted by Lawrence Schietgat at 31.05.17 (filed under: concrete steel wood)
fig 137B photo, photos models, posted by Lawrence Schietgat at 31.05.17 (filed under: concrete steel wood)
fig 137C model, photos models, posted by Lawrence Schietgat at 31.05.17 (filed under: concrete steel wood)
fig 137D photos models, posted by Lawrence Schietgat at 31.05.17 (filed under: concrete steel wood)
fig 333A REFERENTIE_1, posted by Louis Lories at 22.04.18 (filed under: concrete)
fig 288A sketch on existing plan, posted by leilaviaene at 13.03.18 (filed under: concrete)
fig 159A drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’, posted by Stan Guldemont at 31.05.17 (filed under: brick steel)
fig 159B Research Drawings about the existing structure in the ‘zonder-naamstraat site’, posted by Stan Guldemont at 31.05.17 (filed under: brick steel)
fig 159C drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’, posted by Stan Guldemont at 31.05.17 (filed under: brick steel)
fig 159D drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’, posted by Stan Guldemont at 31.05.17 (filed under: brick steel)
fig 545A Bambow bridge – Atelier Lai, posted by Wout Vandermeersch at 26.02.20 (filed under: wood)
fig 545B Bambow bridge – Atelier Lai, posted by Wout Vandermeersch at 26.02.20 (filed under: wood)
fig 684A 27/05, posted by Wout Vandermeersch at 26.05.20 (filed under: concrete)
fig 684B 27/05, posted by Wout Vandermeersch at 26.05.20 (filed under: concrete)
fig 684C 27/05, posted by Wout Vandermeersch at 26.05.20 (filed under: concrete)
fig 684D drawing, 27/05, posted by Wout Vandermeersch at 26.05.20 (filed under: concrete)
fig 680A research existing structure, posted by Cisse Vercauteren at 26.05.20 (filed under: steel wood)
fig 680B research existing structure, posted by Cisse Vercauteren at 26.05.20 (filed under: steel wood)
fig 680C research existing structure, posted by Cisse Vercauteren at 26.05.20 (filed under: steel wood)
fig 680D research existing structure, posted by Cisse Vercauteren at 26.05.20 (filed under: steel wood)
fig 3A drawing, Voorhaven Site, posted by Stan Guldemont at 28.02.17 (filed under: steel)
fig 3B photo, Voorhaven Site, posted by Stan Guldemont at 28.02.17 (filed under: steel)
fig 3C drawing, Voorhaven Site, posted by Stan Guldemont at 28.02.17 (filed under: steel)
fig 100A Steel Prefab Structure, posted by Kevin De Roeck at 24.05.17 (filed under: steel)
fig 100B Steel Prefab Structure, posted by Kevin De Roeck at 24.05.17 (filed under: steel)
fig 100C Steel Prefab Structure, posted by Kevin De Roeck at 24.05.17 (filed under: steel)
fig 100D Steel Prefab Structure, posted by Kevin De Roeck at 24.05.17 (filed under: steel)
fig 149A Sketches, posted by Helen Van de Vloet at 31.05.17 (filed under: concrete steel)
fig 149B Sketches, posted by Helen Van de Vloet at 31.05.17 (filed under: concrete steel)
fig 178A model, Final model, posted by Hannes Mol at 31.05.17 (filed under: concrete wood)
fig 448A VERNACULAR, posted by Melissa Vanwezemael at 25.02.19 (filed under: wood)
fig 289A WTC 1 axo tetris, posted by Sophie Leemans at 14.03.18 (filed under:)
fig 564A Machinekamer Vynckier site, posted by Lode De Smet Van Damme at 08.03.20 (filed under: brick glass)
fig 466A Structure, Libelco, posted by Kadir Altun at 04.03.19 (filed under: steel)
fig 466B Structure, Libelco, posted by Kadir Altun at 04.03.19 (filed under: steel)
fig 201A Floors sections, posted by Luna Fonseca at 24.07.17 (filed under: brick concrete steel wood)
fig 73A drawing, Construction details of the warehouse on site, posted by Rosa Fens at 24.05.17 (filed under: brick plastics steel)
fig 73B drawing, Construction details of the warehouse on site, posted by Rosa Fens at 24.05.17 (filed under: brick plastics steel)
fig 73C drawing, Construction details of the warehouse on site, posted by Rosa Fens at 24.05.17 (filed under: brick plastics steel)
fig 217A drawing, proces_17, posted by Laia Bonet at 26.07.17 (filed under: brick concrete)
fig 668A OMA, posted by Dean Peeters at 26.05.20 (filed under: glass steel)
fig 668B OMA, posted by Dean Peeters at 26.05.20 (filed under: glass steel)
fig 668C OMA, posted by Dean Peeters at 26.05.20 (filed under: glass steel)
fig 668D OMA, posted by Dean Peeters at 26.05.20 (filed under: glass steel)
fig 144A structural options. Isolating a container outside, posted by Helen Van de Vloet at 31.05.17 (filed under: steel wood)
fig 144B structural options. Isolating a container outside, posted by Helen Van de Vloet at 31.05.17 (filed under: steel wood)
fig 215A studio, posted by Floris De Bruyn at 26.07.17 (filed under: brick)
fig 497A DETAIL – brick meets wood, posted by Sandrine Janssens at 19.05.19 (filed under: brick wood)
fig 478A work in progress, posted by Floris De Bruyn at 25.03.19 (filed under:)
fig 478B work in progress, posted by Floris De Bruyn at 25.03.19 (filed under:)
fig 579A Sketch of masterplan, scale 1/1000, posted by Aaron Vanacker at 18.03.20 (filed under:)
fig 444A hopvandenbrandenstraat., posted by Robbe Van Rafelghem at 25.02.19 (filed under:)
fig 444B hopvandenbrandenstraat., posted by Robbe Van Rafelghem at 25.02.19 (filed under:)
fig 444C hopvandenbrandenstraat., posted by Robbe Van Rafelghem at 25.02.19 (filed under:)
fig 519A Werfbeeld 51 Rue Raynouard – Perret, posted by Anouk Depaepe at 19.02.20 (filed under: concrete)
fig 480A Wachtstaven, posted by Enver Peeters at 26.03.19 (filed under: concrete steel)
fig 399A drawing, Final plans, posted by Sven de Smet at 03.06.18 (filed under: concrete steel)
fig 765A expo Vynckier @ WTF, posted by Floris De Bruyn at 01.07.20 (filed under:)
fig 765B expo Vynckier @ WTF, posted by Floris De Bruyn at 01.07.20 (filed under:)
fig 765C expo Vynckier @ WTF, posted by Floris De Bruyn at 01.07.20 (filed under:)
fig 765D expo Vynckier @ WTF, posted by Floris De Bruyn at 01.07.20 (filed under:)
fig 624A drawing, Vynckier, posted by Wout Vandermeersch at 21.04.20 (filed under: steel)
fig 624B drawing, Vynckier, posted by Wout Vandermeersch at 21.04.20 (filed under: steel)
fig 624C drawing, Vynckier, posted by Wout Vandermeersch at 21.04.20 (filed under: steel)
fig 624D drawing, Vynckier, posted by Wout Vandermeersch at 21.04.20 (filed under: steel)
fig 690A ingrepen op aanwezige context, posted by Cisse Vercauteren at 26.05.20 (filed under: steel wood)
fig 690B ingrepen op aanwezige context, posted by Cisse Vercauteren at 26.05.20 (filed under: steel wood)
fig 462A Enclosed house, posted by Sandrine Janssens at 02.03.19 (filed under:)
fig 226A drawing, proces_27, posted by Laia Bonet at 26.07.17 (filed under: steel)
fig 524A The Smithsons’ New Brutalism, posted by linde huygens at 19.02.20 (filed under: brick glass steel)
fig 242A axonometric alejandra and joao, posted by Jerónimo Bailat at 27.07.17 (filed under: brick steel wood)
fig 93A TECHNICAL DETAILS, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel wood)
fig 93B TECHNICAL DETAILS, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel wood)
fig 607A Superstudio, Adolfo Natalini, Monumento Continuo, 1969, posted by Aaron Vanacker at 25.03.20 (filed under:)
fig 572A photo, Vynckier, posted by Jolien De Smet at 11.03.20 (filed under: steel)
fig 717A photo, Vynckier, posted by Jolien De Smet at 27.05.20 (filed under:)
fig 554A Parkeergebouw Ledeberg, posted by Bert Van Wijnendaele at 27.02.20 (filed under: concrete)
fig 583A model, Masterplan Vynckier, posted by Bert Van Wijnendaele at 18.03.20 (filed under:)
fig 164A photo, CREE LCT building system, posted by Hannes Mol at 31.05.17 (filed under: concrete wood)
fig 164B CREE LCT building system, posted by Hannes Mol at 31.05.17 (filed under: concrete wood)
fig 39A drawing, Japan wood connection in chamonix, posted by Helen Van de Vloet at 15.03.17 (filed under: wood)
fig 351A Scheme structures silo, posted by Lien De Jonghe at 23.04.18 (filed under: steel)
fig 351B Scheme structures silo, posted by Lien De Jonghe at 23.04.18 (filed under: steel)
fig 592A Vynckier Site, first proposal, scheme, posted by Isra Cekaj at 18.03.20 (filed under:)
fig 358A Notre-Dame in BXL?, posted by leilaviaene at 30.04.18 (filed under: brick)
fig 755A photo, Vynckier 2, posted by Jolien De Smet at 27.05.20 (filed under:)
fig 86A photo, Wittemolenstraat, Sint – Amandsberg, posted by Tim Belaen at 24.05.17 (filed under: steel)
fig 86B Wittemolenstraat, Sint – Amandsberg, posted by Tim Belaen at 24.05.17 (filed under: steel)
fig 10A drawing, CORRUGATED WEB BEAM, posted by Anton Parys at 15.03.17 (filed under: steel)
fig 10B photo, CORRUGATED WEB BEAM, posted by Anton Parys at 15.03.17 (filed under: steel)
fig 10C photo, CORRUGATED WEB BEAM, posted by Anton Parys at 15.03.17 (filed under: steel)
fig 10D photo, CORRUGATED WEB BEAM, posted by Anton Parys at 15.03.17 (filed under: steel)
fig 249A photo, working session, posted by Floris De Bruyn at 30.08.17 (filed under: brick concrete glass steel)
fig 46A drawing, masterplan site gentbrugge, posted by Emmanuelle Vanhaesendonck at 16.05.17 (filed under: wood)
fig 46B drawing, masterplan site gentbrugge, posted by Emmanuelle Vanhaesendonck at 16.05.17 (filed under: wood)
fig 46C photo, masterplan site gentbrugge, posted by Emmanuelle Vanhaesendonck at 16.05.17 (filed under: wood)
fig 24A photo, Steel truss, posted by Thomas Monsy at 15.03.17 (filed under: steel)
fig 24B photo, Steel truss, posted by Thomas Monsy at 15.03.17 (filed under: steel)
fig 92A MODEL #2, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel wood)
fig 92B MODEL #2, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel wood)
fig 92C MODEL #2, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel wood)
fig 663A future for the fireplace, posted by Maurits Verstraete at 14.05.20 (filed under: brick)
fig 612A drawing, Vynckier, posted by Wout Vandermeersch at 31.03.20 (filed under: brick)
fig 612B model, Vynckier, posted by Wout Vandermeersch at 31.03.20 (filed under: brick)
fig 612C drawing, Vynckier, posted by Wout Vandermeersch at 31.03.20 (filed under: brick)
fig 384A ANALYSIS WTC, posted by Sophie Leemans at 03.06.18 (filed under: concrete steel)
fig 384B ANALYSIS WTC, posted by Sophie Leemans at 03.06.18 (filed under: concrete steel)
fig 25A photo, Hole deck, posted by Lawrence Schietgat at 15.03.17 (filed under: concrete)
fig 25B model, Hole deck, posted by Lawrence Schietgat at 15.03.17 (filed under: concrete)
fig 646A Masterplan, posted by Marie-lou Vermaerke at 30.04.20 (filed under: brick)
fig 521A Column Peter Märkli, posted by Lode De Smet Van Damme at 19.02.20 (filed under: concrete)
fig 739A Primary Circles_Detailed section, posted by Emile Bouckaert at 27.05.20 (filed under: concrete)
fig 223A drawing, proces_23, posted by Floris De Bruyn at 26.07.17 (filed under: brick)
fig 752A STADSPARK VYNCKIER/ DE SCHIJF, posted by Lara Winderickx at 27.05.20 (filed under: brick concrete steel wood)
fig 240A drawing, axonometry Marta and Luciana, posted by Floris De Bruyn at 27.07.17 (filed under: brick concrete steel)
fig 432A WTC remodel – a tower can have a lot of different plans, posted by Karel Verdonck at 07.06.18 (filed under: concrete glass steel wood)
fig 432B WTC remodel – a tower can have a lot of different plans, posted by Karel Verdonck at 07.06.18 (filed under: concrete glass steel wood)
fig 432C WTC remodel – a tower can have a lot of different plans, posted by Karel Verdonck at 07.06.18 (filed under: concrete glass steel wood)
fig 432D WTC remodel – a tower can have a lot of different plans, posted by Karel Verdonck at 07.06.18 (filed under: concrete glass steel wood)
fig 655A Building shed structure new addition, posted by Lode De Smet Van Damme at 06.05.20 (filed under: brick glass steel)
fig 251A DEEP PLAN construction detail 1, posted by Timotheus de Beir at 30.08.17 (filed under: concrete steel)
fig 336A WERKMAQUETTE_3.1, posted by Louis Lories at 22.04.18 (filed under:)
fig 336B WERKMAQUETTE_3.1, posted by Louis Lories at 22.04.18 (filed under:)
fig 352A How To Become A Niemeyer, posted by Laura Vanderdonckt at 23.04.18 (filed under: glass steel)
fig 745A model, Site model, posted by Astrid Christiaens at 27.05.20 (filed under:)
fig 409A drawing, Facade, posted by Eva Van Craenenbroeck at 03.06.18 (filed under: glass steel)
fig 676A model, Schijf x Manchester, posted by Fien Dequeker at 26.05.20 (filed under: concrete steel)
fig 676B Schijf x Manchester, posted by Fien Dequeker at 26.05.20 (filed under: concrete steel)
fig 676C Schijf x Manchester, posted by Fien Dequeker at 26.05.20 (filed under: concrete steel)
fig 676D Schijf x Manchester, posted by Fien Dequeker at 26.05.20 (filed under: concrete steel)
fig 89A photo, Study models, posted by Thomas Monsy at 24.05.17 (filed under: steel)
fig 89B Study models, posted by Thomas Monsy at 24.05.17 (filed under: steel)
fig 89C photo, Study models, posted by Thomas Monsy at 24.05.17 (filed under: steel)
fig 604A Proposal masterplan Vynckier site, posted by Lode De Smet Van Damme at 25.03.20 (filed under:)
fig 274A Zuidertoren, posted by Mattias Vandenbempt at 06.03.18 (filed under: steel)
fig 274B Zuidertoren, posted by Mattias Vandenbempt at 06.03.18 (filed under: steel)
fig 274C Zuidertoren, posted by Mattias Vandenbempt at 06.03.18 (filed under: steel)
fig 14A photo, Industrial project, posted by Jean-Louis Verstraete at 15.03.17 (filed under: concrete)
fig 14B photo, Industrial project, posted by Jean-Louis Verstraete at 15.03.17 (filed under: concrete)
fig 14C photo, Industrial project, posted by Jean-Louis Verstraete at 15.03.17 (filed under: concrete)
fig 14D photo, Industrial project, posted by Jean-Louis Verstraete at 15.03.17 (filed under: concrete)
fig 679A drawing, Langse snede, posted by Anouk Depaepe at 26.05.20 (filed under: brick concrete steel)
fig 234A model, João Branco and Alejandra Calvo, posted by João Branco at 26.07.17 (filed under: brick)
fig 357A WERKMAQUETTE_3.3_BUREN, posted by Louis Lories at 28.04.18 (filed under:)
fig 475A volumestudie, posted by Sandrine Janssens at 18.03.19 (filed under:)
fig 278A Structure WTC 1 +3 & +24, posted by Mattias Vandenbempt at 10.03.18 (filed under: steel)
fig 278B Structure WTC 1 +3 & +24, posted by Mattias Vandenbempt at 10.03.18 (filed under: steel)
fig 278C Structure WTC 1 +3 & +24, posted by Mattias Vandenbempt at 10.03.18 (filed under: steel)
fig 278D Structure WTC 1 +3 & +24, posted by Mattias Vandenbempt at 10.03.18 (filed under: steel)
fig 584A Mosterdfabriek Oudenaarde, posted by Bert Van Wijnendaele at 18.03.20 (filed under:)
fig 728A photo, Vynckier 2, posted by Jolien De Smet at 27.05.20 (filed under:)
fig 541A Rudolf Olgiati Column, posted by Lode De Smet Van Damme at 24.02.20 (filed under: concrete)
fig 486A detail – concrete & wood connection, posted by Sandrine Janssens at 02.05.19 (filed under: concrete wood)
fig 670A Plan 1 terminal, posted by Marie-lou Vermaerke at 26.05.20 (filed under: brick steel)
fig 47A drawing, Every Big Box has its structure, posted by Anton Parys at 24.05.17 (filed under: steel)