fig 58A, Model #1
fig 58B, Model #1
fig 36A, photo, Woonzorgcentrum Van Lierde, the blocks can be used for structural and non-structural purposes
fig 412A, Torre Velasca
fig 412B, Torre Velasca
fig 645A, PALACE OF LABOUR, TURIN, 1961
fig 584A, Proposal Masterplan Vynckier
fig 258A, model WTC
fig 567A, In het spoor van Serafinus
fig 596A, drawing, 25/03
fig 596B, drawing, 25/03
fig 596C, model, 25/03
fig 70A, photo, Pictures Nonnemeersstraat, Ghent
fig 70B, photo, Pictures Nonnemeersstraat, Ghent
fig 222A, model, proces_22
fig 489A, Structure Beekstraat
fig 574A, model, Masterplan Vynckiersite
fig 574B, model, Masterplan Vynckiersite
fig 250A, working session
fig 472A, photo, workshop
fig 472B, workshop
fig 295A, Civic Center – SOM
fig 742A, drawing, Tulou, reference - China
fig 742B, model, Tulou, rammed earth and wood structure
fig 742C, model, Tulou, rammed earth and wood structure
fig 742D, model, Tulou, structure
fig 71A, photo, axonometric view on docks site
fig 588A, Proposal Masterplan
fig 719A, photo, Vynckier 2, Vynckier 2, Architectuurplan, Gelijkvloers
fig 543A, Bambow bridge – Atelier Lai
fig 543B, Bambow bridge – Atelier Lai
fig 671A, Structuur Manchester 2
fig 368A, Structural model WTC brewery
fig 368B, Structural model WTC brewery
fig 638A, Shed structure with new volume
fig 638B, Shed structure with new volume
fig 644A, Masterplan
fig 483A, Werkmaquettes concept DAUWSTRAAT/PICARDSTRAAT, Processed with VSCO with preset
fig 483B, Werkmaquettes concept DAUWSTRAAT/PICARDSTRAAT, Processed with VSCO with preset
fig 227A, proces_29
fig 199A, sketch
fig 203A, sketch
fig 680A, model, Fragment schijf
fig 680B, Fragment schijf
fig 680C, Fragment schijf
fig 680D, Fragment schijf
fig 268A, Knights of Columbus
fig 268B, Knights of Columbus
fig 268C, Knights of Columbus
fig 351A, WERKMAQUETTE_PLINT
fig 21A, photo, Tram depot Marconi – site visit
fig 21B, photo, Tram depot Marconi – site visit
fig 21C, photo, Tram depot Marconi – site visit
fig 309A, Balkony garden
fig 309B, Balkony garden
fig 309C, Balkony garden
fig 309D, Balkony garden
fig 78A, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78B, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78C, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78D, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 77A, Concrete building elements
fig 77B, Concrete building elements
fig 77C, Concrete building elements
fig 77D, Concrete building elements
fig 360A, Structure underneath diving tank
fig 736A, Primary Circles_Model
fig 544A, Bambow bridge – Atelier Lai
fig 389A, CATHEDRALE COMMUNALE_DETAILS
fig 361A, Structure between diving tank and WTC 2tower
fig 532A, photo, Vynckier 1981-94
fig 532B, photo, Vynckier 1981-94
fig 733A, model, Project, The Modern Tulou
fig 733B, model, Project, The Modern Tulou
fig 733C, model, Project, The Modern Tulou
fig 733D, model, Project, The Modern Tulou
fig 578A, Digital masterplan, scale 1/1000
fig 256A, drawing, Structural core
fig 256B, drawing, Structural core
fig 702A, Masterplan
fig 702B, Masterplan
fig 450A, photo, Collage geïnspireerd op Gilbert & George
fig 359A, Detailing sketches
fig 563A, Section Vynckier Machinekamer
fig 83A, drawing, SITE ANALYSE
fig 83B, drawing, SITE ANALYSE
fig 83C, drawing, SITE ANALYSE
fig 64A, DOME – EPS + SPRAYED CONCRETE, DOME - EPS + SPRAYED CONCRETE
fig 64B, DOME – EPS + SPRAYED CONCRETE
fig 64C, DOME – EPS + SPRAYED CONCRETE
fig 64D, DOME – EPS + SPRAYED CONCRETE
fig 261A, drawing, WTC_subtraction, WTC_subtraction
fig 261B, drawing, WTC_subtraction, WTC_axonometry
fig 725A, photo, Vynckier 2, Vynckier 2, Principe gevel- en dakopbouw
fig 577A, Sketch of masterplan, scale 1/1000
fig 595A, drawing, 25/03
fig 595B, drawing, 25/03
fig 595C, model, 25/03
fig 140A, model making in the sun
fig 140B, model making in the sun
fig 579A, drawing, Masterplan
fig 390A, CATHEDRALE COMMUNALE_PERSPECTIVE
fig 492A, NG17 – preliminary design 06/05 – hostel + offices
fig 492B, NG17 – preliminary design 06/05 – hostel + offices
fig 591A, Vynckier Site, first proposal, sketches
fig 11A, photo, FC Muide
fig 11B, photo, FC Muide
fig 11C, photo, FC Muide
fig 550A, photo, Site visit
fig 550B, photo, Site visit
fig 550C, photo, Site visit
fig 79A, drawing, detail construction garage box, construction detail precast concrete elements
fig 72A, drawing, Structure of the big warehouse on docks site
fig 526A, Photo during construction – Healey Guest House – ‘Cocoon House’
fig 669A, Site section Terminal
fig 457A, George&Gilbert
fig 245A, model, Axel Fangueiro and Luna Fonseca
fig 343A, Open structure + circulation
fig 686A, Maquette Masterplan
fig 224A, studio
fig 701A, 1 UNIT
fig 701B, 1 UNIT
fig 453A, Collage Gilbert and Georges
fig 362A, Bamboo exoskeleton stairs , Vertical garden
fig 362B, Bamboo exoskeleton stairs , Vertical garden
fig 446A, VERNACULAR
fig 422A, Final presentation
fig 422B, Final presentation
fig 422C, Final presentation
fig 422D, Final presentation
fig 706A, De Nieuwe Vynckier – Incubator – Model
fig 297A, WTC situation plan
fig 652A, Building shed structure axonometric
fig 759A, detail schetsen
fig 759B, detail schetsen
fig 759C, detail schetsen
fig 759D, detail schetsen
fig 347A, Scheme structures silo
fig 347B, Scheme structures silo
fig 280A, werfbezoek – ultiem grid 740 x 740
fig 280B, werfbezoek – ultiem grid 740 x 740
fig 116A, drawing, Program, Freeing the site of cars by putting them in a tower of the same height as his modernistic neighbor.
fig 116B, photo, Program, Entering the city via the E17 viaduct
fig 116C, drawing, Program
fig 116D, photo, Program
fig 158A, Model of the Site, The final position of the new added buildings.
fig 158B, Model of the Site, Model without any of the existing structures.
fig 401A, drawing, Connection to the floor
fig 85A, photo, Analysis of the site, structure, detail, 2D build-up of steel truss
fig 85B, photo, Analysis of the site, structure, detail, isometric
fig 85C, photo, Analysis of the site, structure, detail, isometric
fig 85D, photo, Analysis of the site, structure, detail, isometric
fig 30A, photo, Silos, tanks & holders, Bottom-up construction
fig 30B, photo, Silos, tanks & holders, Interior view
fig 30C, photo, Silos, tanks & holders, Assembling the topcover
fig 30D, photo, Silos, tanks & holders, Surreal image
fig 496A, model, Work in progress model CNC-site
fig 130A, Example sites photos
fig 130B, Example sites photos
fig 130C, Example sites photos
fig 332A, WERKMAQUETTE_3.0
fig 326A, WTC model progress week 8
fig 559A, Model Engine Room
fig 559B, Model Engine Room
fig 93A, TECHNICAL DETAILS, Technical detail on the guiding rails
fig 93B, TECHNICAL DETAILS, Technical detail on the connection between the steel structure & foundation
fig 266A, WTC Massive Model
fig 191A, meetings
fig 197A, work in progress … axonometry
fig 753A, photo, Vynckier 2, Principe, Maquette
fig 656A, primary arcs
fig 240A, drawing, axonometry Marta and Luciana
fig 68A, collage: walls around the field
fig 524A, photo, Les Monseigneurs – Primary Talks
fig 524B, Les Monseigneurs – Primary Talks
fig 711A, photo, Vynckier, Masterplan, Structuur site
fig 34A, model, Lignatur floor/ roof element, Lignatur floor element - hollow core slab
fig 34B, model, Lignatur floor/ roof element, Lignatur floor element - Detail possibilties ducts
fig 382A, ANALYSIS WTC
fig 382B, ANALYSIS WTC
fig 187A, studio at carlos ramos’ pavillion
fig 53A, visit construction site
fig 53B, visit construction site
fig 53C, visit construction site
fig 94A, INDUSTRIAL CONSTRUCTION SITE, Prefab structure
fig 94B, INDUSTRIAL CONSTRUCTION SITE, Two truss crossing
fig 94C, INDUSTRIAL CONSTRUCTION SITE, Cross bracing of the structure
fig 721A, Vynckier Circle Building
fig 721B, Vynckier Circle Building
fig 721C, Vynckier Circle Building
fig 721D, Vynckier Circle Building
fig 611A, drawing, 01/04
fig 611B, drawing, 01/04
fig 611C, drawing, 01/04
fig 479A, KANAL review KUL UCL ULB
fig 479B, KANAL review KUL UCL ULB
fig 479C, KANAL review KUL UCL ULB
fig 640A, Masterplan model
fig 477A, vertrapping
fig 545A, Aansluiting staalframebouw
fig 44A, drawing, STEEL JOINT
fig 180A, model, Site de Porre – primary structure model, A
fig 128A, drawing, Final drawings
fig 128B, model, Final drawings
fig 128C, drawing, Final drawings
fig 128D, drawing, Final drawings
fig 28A, photo, Industrial warehouse, connection between foundation and column
fig 28B, photo, Industrial warehouse, connection between column and beam
fig 28C, photo, Industrial warehouse
fig 28D, photo, Industrial warehouse, connection between beams
fig 487A, model, Model housing tower
fig 225A, drawing, proces_24
fig 534A, Schets, demonteerbare structuur, Jean Prouvé
fig 448A, Adjacent
fig 504A, Section A110
fig 666A, OMA
fig 666B, OMA
fig 666C, OMA
fig 666D, OMA
fig 386A, CATHEDRALE COMMUNALE
fig 580A, Vynckier 5
fig 166A, photo, FACADE DETAIL, The final fragmented detail of one of the three variations.
fig 166B, photo, FACADE DETAIL, The final fragmented detail of one of the three variations.
fig 166C, photo, FACADE DETAIL, Isometric view of the three variation on the outside columns.
fig 166D, photo, FACADE DETAIL, Handmade concrete
fig 396A, model, Small 1/200 scale model
fig 548A, Manchester building – structure
fig 548B, Manchester building – structure
fig 735A, Primary Circles_structural system
fig 583A, drawing, Drawing proposal Masterplan
fig 687A, section
fig 687B, section
fig 687C, section
fig 229A, proces_31
fig 3A, drawing, Voorhaven Site, The column is constructed with leftovers from the world expo in Antwerp 1985
fig 3B, photo, Voorhaven Site
fig 3C, drawing, Voorhaven Site, how hot riveting is done.
fig 668A, Plan 1 terminal
fig 88A, MODEL #4
fig 26A, photo, Lumat Site Gent
fig 26B, photo, Lumat Site Gent
fig 26C, photo, Lumat Site Gent
fig 728A, Vynckier Site Masterplan
fig 275A, Ceiling Infrastructure plan
fig 468A, Collage Rules
fig 535A, The Smithsons’ New Brutalism
fig 535B, The Smithsons’ New Brutalism
fig 626A, Masterplan level 1
fig 538A, photo, Palais d’Iéna, Paris – Auguste Perret
fig 334A, WERKMAQUETTE_3.1
fig 334B, WERKMAQUETTE_3.1
fig 395A, model, Final scale model
fig 683A, 27/05
fig 683B, 27/05
fig 683C, 27/05
fig 683D, drawing, 27/05
fig 205A, meetings, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 521A, drawing, Kimbell Art Center
fig 521B, Kimbell Art Center
fig 284A, werfbezoek – kraan in liftschacht
fig 729A, Vynckier Circle
fig 729B, Vynckier Circle
fig 729C, Vynckier Circle
fig 47A, drawing, Every Big Box has its structure
fig 47B, drawing, Every Big Box has its structure
fig 165A, analysing site Gents Bakkershuis
fig 218A, drawing, proces_18
fig 331A, REFERENTIE_1
fig 82A, model, Analysis structure “De Porre”, Part of structure with cantilever
fig 82B, Analysis structure “De Porre”, Part of structure with cantilever - top
fig 82C, Analysis structure “De Porre”, Part of structure with cantilever
fig 756A, photo, Vynckier 2, Principe authentieke en groene gevel, Maquette
fig 391A, Is It a Niemeyer?
fig 391B, Is It a Niemeyer?
fig 551A, Parkeergebouw Ledeberg, Nieuw Parkeergebouw Ledeberg
fig 713A, photo, Vynckier, Masterplan, Overdekte markt met passerelle
fig 571A, photo, WATER TOWER, Public square as entrance.
fig 571B, photo, WATER TOWER, Manchester's are for living and the heart of industry (water tower) between them.
fig 277A, Steel connections WTC +24
fig 277B, Steel connections WTC +24
fig 277C, Steel connections WTC +24
fig 277D, Steel connections WTC +24
fig 155A, drawing, ISO
fig 264A, Manhattan project
fig 264B, Manhattan project
fig 264C, Manhattan project
fig 19A, photo, SUPPORTING FACADE STRUCTURE, steel supporting structure
fig 329A, WERKMAQUETTE_1-2
fig 329B, WERKMAQUETTE_1-2
fig 167A, photo, WORK – tussen
fig 167B, WORK – tussen
fig 162A, REFERENCE – ALDO VAN EYCK SONSBEEK PAVILJOEN
fig 746A, photo, Jubileumlaan, construction soilmixwall
fig 514A, model, END MODEL
fig 514B, model, END MODEL
fig 514C, model, END MODEL
fig 637A, shed structure
fig 637B, shed structure
fig 429A, FINAL Model WTC
fig 429B, FINAL Model WTC
fig 429C, FINAL Model WTC
fig 741A, drawing, Manchester, concept apartments and stores
fig 741B, drawing, Manchester, concept structure
fig 741C, drawing, Manchester, concept offices
fig 741D, drawing, Manchester, entrance
fig 747A, drawing, STADSPARK VYNCKIER/ DE SCHIJF
fig 747B, STADSPARK VYNCKIER/ DE SCHIJF
fig 747C, STADSPARK VYNCKIER/ DE SCHIJF
fig 747D, STADSPARK VYNCKIER/ DE SCHIJF
fig 296A, WTC sections
fig 341A, Axo concrete factory
fig 335A, REFERENTIE_3
fig 418A, sfeer
fig 691A, research existing structure
fig 463A, bOb
fig 463B, bOb
fig 463C, bOb
fig 463D, bOb
fig 438A, Jury WTC
fig 438B, Jury WTC
fig 438C, Jury WTC
fig 438D, Jury WTC
fig 46A, drawing, masterplan site gentbrugge
fig 46B, drawing, masterplan site gentbrugge
fig 46C, photo, masterplan site gentbrugge
fig 720A, axo existing structure
fig 80A, drawing, Site analyse
fig 80B, drawing, Site analyse
fig 80C, drawing, Site analyse
fig 80D, drawing, Site analyse
fig 397A, drawing, Final plans
fig 355A, WERKMAQUETTE_3.3_BUREN
fig 157A, model masterplan
fig 4A, photo, Hidden interior structure of the Tondelier sasholders, Interior of the Tondelier gasholders.
fig 4B, photo, Hidden interior structure of the Tondelier sasholders, Interior of the Tondelier gasholders.
fig 4C, photo, Hidden interior structure of the Tondelier sasholders, Interior of the Tondelier gasholders.
fig 4D, photo, Hidden interior structure of the Tondelier sasholders, Remaining structure Tondelier gasholder
fig 252A, Pillar Catalogue
fig 598A, The Brewing Process
fig 717A, structure proposition
fig 717B, structure proposition
fig 717C, structure proposition
fig 617A, werfbezoek
fig 593A, masterplan
fig 124A, photo, Construction clt
fig 339A, Detail of 1 Bligh Street
fig 253A, Working session
fig 622A, drawing, Vynckier
fig 622B, drawing, Vynckier
fig 622C, drawing, Vynckier
fig 622D, drawing, Vynckier
fig 48A, model vs Spa reine
fig 734A, Primary Circles_Sections
fig 734B, Primary Circles_Sections
fig 734C, Primary Circles_Sections
fig 734D, Primary Circles_Sections
fig 42A, photo, Renovation factory Kotrijk
fig 42B, photo, Renovation factory Kotrijk
fig 42C, photo, Renovation factory Kotrijk
fig 42D, photo, Renovation factory Kotrijk
fig 54A, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54B, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54C, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54D, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 113A, drawing, Site Ijzerweglaan, City fabric
fig 113B, photo, Site Ijzerweglaan, Island cut off by the river Schelde and the E17 Viaduct
fig 113C, model, Site Ijzerweglaan
fig 113D, drawing, Site Ijzerweglaan, Different existing typologies
fig 267A, OCBC Bank
fig 164A, photo, CREE LCT building system, Floor slab with the holes in it for the steel bar of the columns
fig 164B, CREE LCT building system, wall piece with the columns attached
fig 435A, FINAL MODEL – JURY
fig 435B, FINAL MODEL – JURY
fig 435C, FINAL MODEL – JURY
fig 435D, FINAL MODEL – JURY
fig 655A, drawing parochiezaal
fig 413A, analyse plint
fig 413B, analyse plint
fig 413C, drawing, analyse plint
fig 413D, analyse plint
fig 481A, housewithonepencil.
fig 642A, Staal-beton kolom
fig 642B, Staal-beton kolom
fig 723A, photo, Vynckier 2, Vynckier 2, Snede
fig 244A, model, Maurício Muller and Jerónimo Bailat
fig 501A, photo, Tandartsenpraktijk
fig 473A, volumestudie
fig 337A, Ingang wtc via kern
fig 447A, Old vs. new
fig 74A, model, MODEL – WASSERIJ DER VLAANDEREN, WASSERIJ DER VLAANDEREN
fig 294A, Structure Niv +27 WTC
fig 126A, URBAN FARM
fig 126B, URBAN FARM
fig 464A, Structure, Libelco
fig 464B, Structure, Libelco
fig 91A, MODEL #1, Interior wooden structure
fig 91B, MODEL #1, Interior wooden structure
fig 565A, drawing, Plan floor level (+0) of building 4 and 4A, Vynckier site
fig 502A, Housing tower – AXO
fig 279A, werfbezoek – breedplaatwanden
fig 279B, werfbezoek – breedplaatwanden
fig 692A, Model Manchester
fig 692B, Model Manchester
fig 692C, Model Manchester
fig 692D, Model Manchester
fig 690A, floorplan
fig 690B, floorplan
fig 690C, floorplan
fig 629A, drawing, Section of a Tulou, traditional housing in China
fig 629B, drawing, Section of a Tulou, traditional housing in China
fig 96A, mazda site koopvaardijlaan, Drawing of the interior structure on the exterior wall. Also the remnants of a connected wooden building that burned down in the 1970's is still visible in the drawing.
fig 96B, mazda site koopvaardijlaan, cast concrete column
fig 96C, mazda site koopvaardijlaan, View towards aisle on the side of the tracks.
fig 96D, mazda site koopvaardijlaan
fig 290A, Reference: Standard Bank Centre – Hentrich, Petschnigg & Partners ( 1970)
fig 207A, model
fig 408A, drawing, open apartment
fig 285A, sketch on existing plan
fig 364A, cathédrale communale work documents
fig 364B, cathédrale communale work documents
fig 558A, Vynckier
fig 558B, Vynckier
fig 73A, drawing, Construction details of the warehouse on site
fig 73B, drawing, Construction details of the warehouse on site
fig 73C, drawing, Construction details of the warehouse on site
fig 410A, drawing, Detail
fig 15A, photo, SILOS, TANKS & HOLDERS, Rotating the panels allows vertical forces to be guided down
fig 15B, drawing, SILOS, TANKS & HOLDERS, Basic dimensions of a cold rolled steel silo panel
fig 271A, Citygroup Center
fig 271B, Citygroup Center
fig 271C, Citygroup Center
fig 119A, model, Test model of 3 05 2017
fig 363A, WTC 1 – model of mosque
fig 363B, WTC 1 – model of mosque
fig 291A, WTC I: Axo op 2 verdiepen
fig 179A, Primary & New
fig 732A, primary structure
fig 732B, primary structure
fig 732C, primary structure
fig 732D, primary structure
fig 519A, Column Peter Märkli
fig 262A, Opbouw maquette S1:50 WTC
fig 678A, research existing structure
fig 678B, research existing structure
fig 678C, research existing structure
fig 678D, research existing structure
fig 248A, photo, exploring the deep plan
fig 323A, Werfbezoek
fig 323B, Werfbezoek
fig 323C, Werfbezoek
fig 323D, Werfbezoek
fig 182A, drawing, Masterplan final site gentbrugge
fig 182B, drawing, Masterplan final site gentbrugge, coworking
fig 182C, drawing, Masterplan final site gentbrugge
fig 182D, photo, Masterplan final site gentbrugge
fig 45A, drawing, shipping container
fig 45B, drawing, shipping container
fig 45C, drawing, shipping container
fig 436A, finaal model
fig 436B, finaal model
fig 436C, finaal model
fig 641A, Georgia
fig 589A, Masterplan Proposal
fig 169A, research / site model
fig 169B, research / site model
fig 169C, research / site model
fig 752A, vynckier 2020
fig 605A, Superstudio, Adolfo Natalini, Monumento Continuo, 1969
fig 95A, Tube and Coupler Scaffolds
fig 95B, Tube and Coupler Scaffolds
fig 95C, Tube and Coupler Scaffolds
fig 95D, Tube and Coupler Scaffolds
fig 172A, drawing, Research new structures in combination with existing
fig 172B, drawing, Research new structures in combination with existing
fig 172C, drawing, Research new structures in combination with existing, acoustic solutions - new vs. existing (2)
fig 172D, drawing, Research new structures in combination with existing
fig 677A, drawing, Langse snede
fig 658A, Steel Frame Box
fig 421A, waffle slab
fig 421B, waffle slab
fig 434A, CATHEDRALE COMMUNALE_JURY
fig 434B, CATHEDRALE COMMUNALE_JURY
fig 434C, CATHEDRALE COMMUNALE_JURY
fig 434D, CATHEDRALE COMMUNALE_JURY
fig 146A, Visit Industrial Natural stone factory
fig 146B, Visit Industrial Natural stone factory
fig 681A, Axonometrie primaire structuur
fig 681B, Axonometrie primaire structuur
fig 66A, photo, Test Model – Drawing
fig 528A, Analyse Allmannajuvet Zinc Mine Museum – Peter Zumthor, Allmannajuvet Zinc Mine Museum - Peter Zumthor
fig 87A, Analysis structure De Porre, De Porre - floorplan
fig 87B, Analysis structure De Porre, De Porre - level +1
fig 87C, Analysis structure De Porre, Isometric view - surroundings
fig 87D, Analysis structure De Porre, Isometric view - structure
fig 710A, photo, Vynckier, Masterplan, Functies
fig 474A, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 474B, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 474C, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 269A, Shanghai Tower
fig 414A, Final design detail
fig 414B, Final design detail
fig 208A, drawing, proces_09
fig 177A, Final model
fig 177B, Final model, C
fig 506A, BEEKSTRAAT
fig 506B, BEEKSTRAAT
fig 506C, BEEKSTRAAT
fig 427A, northern quarter voyeurism, An MQ-9 Reaper and MQ-1 Predator sit on display in brand new Hangar three at Holloman Air Force Base, N.M.
fig 427B, northern quarter voyeurism
fig 328A, Werf station parking
fig 328B, Werf station parking, plan ondergrondse parking
fig 328C, Werf station parking, wapening om 4 bogen op aan te sluiten, door een fout is het beton te hoog gegoten waardoor alles terug is uitgekapt. Hierdoor komt de wapening in het beton bloot te liggen.
fig 328D, Werf station parking, beton voor de Kiss&Ride wordt gegoten.
fig 636A, Idea Superstudio on ConnectingGrid
fig 755A, photo, Vynckier 2, Principe oud en nieuw, Maquette
fig 547A, Bijgebouw Manchester 1
fig 400A, drawing, New vs old structure, steel vs concrete
fig 608A, drawing, English Garden – Lancelot Capability Brown
fig 500A, photo, Huisartsenpraktijk
fig 643A, Maquette
fig 643B, Maquette
fig 348A, Scheme connections in steel
fig 738A, model, Project, Manchester Two
fig 738B, drawing, Project, Manchester Two
fig 738C, drawing, Project, Manchester Two
fig 738D, drawing, Project, Manchester Two
fig 490A, Work in progress – Dauwstraat, Processed with VSCO with preset
fig 206A, drawing, proces_01
fig 156A, photo, research structure, A
fig 566A, Photo of of interior staircase at building 4, Vynckier site
fig 14A, photo, Industrial project
fig 14B, photo, Industrial project
fig 14C, photo, Industrial project
fig 14D, photo, Industrial project
fig 111A, ComFlor® 51+
fig 111B, model, ComFlor® 51+
fig 111C, photo, ComFlor® 51+
fig 441A, Gilbert & George
fig 402A, model, CATHEDRALE COMMUNALE_DETAIL
fig 402B, model, CATHEDRALE COMMUNALE_DETAIL
fig 16A, photo, SITE VISIT, The large wooden beams ready to be installed.
fig 16B, photo, SITE VISIT, Prefabricated elements are fixed on the columns.
fig 16C, photo, SITE VISIT, Steel elements where the secondary wooden beams will be fixed on.
fig 16D, photo, SITE VISIT, The building of the extension of the store of Aveve.
fig 25A, photo, Hole deck, Holedeck construction
fig 25B, model, Hole deck
fig 274A, Welkom in de Noord-wijk
fig 274B, Welkom in de Noord-wijk
fig 274C, Welkom in de Noord-wijk
fig 274D, Welkom in de Noord-wijk
fig 183A, Structural Analysis
fig 183B, Structural Analysis
fig 183C, Structural Analysis
fig 183D, Structural Analysis
fig 163A, Proces
fig 163B, drawing, Proces, detail exploded view
fig 163C, Proces
fig 163D, Proces
fig 696A, Behind the scenes
fig 696B, Behind the scenes
fig 194A, meetings
fig 100A, Steel Prefab Structure, construction site
fig 100B, Steel Prefab Structure, steel components joint
fig 100C, Steel Prefab Structure, steel components ridge joint
fig 100D, Steel Prefab Structure, steel components joint
fig 171A, drawing, Analysis structure De Porre, Cantilever in concrete
fig 340A, Manitoba hydro place
fig 320A, exploded toren
fig 607A, Masterplan V2
fig 607B, Masterplan V2
fig 509A, drawing, PICARDSTRAAT DETAILSECTION
fig 308A, Vertical Garden
fig 743A, model, Site model, site Vynkier
fig 763A, expo Vynckier @ WTF
fig 763B, expo Vynckier @ WTF
fig 763C, expo Vynckier @ WTF
fig 763D, expo Vynckier @ WTF
fig 316A, Notre Dame
fig 192A, sketch
fig 689A, facades
fig 689B, facades
fig 689C, facades
fig 689D, facades
fig 484A, detail – concrete & wood connection
fig 627A, Connecting grid model
fig 614A, drawing, Masterplan CONNECTING GRID 1.0, scale 1/1000
fig 685A, volume maquette en masterplan ingreep
fig 685B, volume maquette en masterplan ingreep
fig 730A, stil leven de werf
fig 730B, stil leven de werf
fig 730C, stil leven de werf
fig 730D, stil leven de werf
fig 423A, reference
fig 423B, reference
fig 423C, reference, construction
fig 654A, Circle Building section
fig 632A, drawing, SECTION VYNCKIER
fig 144A, structural options. Isolating a container outside
fig 144B, structural options. Isolating a container outside
fig 223A, drawing, proces_23
fig 660A, photo, shed structure
fig 508A, drawing, DAUWSTRAAT DETAILSECTION
fig 40A, photo, Schuur Gentbrugge – Site
fig 40B, photo, Schuur Gentbrugge – Site
fig 40C, photo, Schuur Gentbrugge – Site
fig 40D, drawing, Schuur Gentbrugge – Site
fig 98A, Quick steel
fig 160A, PROCES – AFBREKEN VS OPBOUW
fig 160B, PROCES – AFBREKEN VS OPBOUW
fig 237A, final axonometry
fig 615A, drawing, Section connection Manchester and CONNECTING GRID 1.0
fig 634A, Masterplan level 1
fig 257A, WTC beams
fig 313A, Experience the real stuff
fig 313B, Experience the real stuff
fig 313C, Experience the real stuff
fig 243A, model, Luciana Ligeiro and Marta Faustino
fig 263A, structureel schema plint
fig 139A, DT
fig 139B, DT
fig 188A, porto class 17
fig 639A, circular building
fig 639B, circular building
fig 540A, ECAM – Agwa Architects
fig 540B, ECAM – Agwa Architects
fig 460A, Enclosed house
fig 419A, drawing, snede
fig 536A, drawing, Magney House – Glenn Murcutt – section
fig 536B, drawing, Magney House – Glenn Murcutt – section
fig 353A, LOFTS With gardens in double skin facade
fig 459A, Enclosed house
fig 522A, The Smithsons’ New Brutalism
fig 676A, fragment model
fig 676B, fragment model
fig 676C, fragment model
fig 440A, model, WTC remodel – puzzle
fig 440B, model, WTC remodel – puzzle
fig 440C, model, WTC remodel – puzzle
fig 440D, model, WTC remodel – puzzle
fig 700A, Axonometries CONNECTING GRID
fig 700B, Axonometries CONNECTING GRID
fig 370A, Section analysis of fermentation tank
fig 553A, Werf GENT
fig 241A, axonometric
fig 241B, axonometric
fig 210A, drawing, proces_11
fig 97A, drawing, SITE & BUILDING ANALYSIS, Exploded view from different construction segments
fig 97B, SITE & BUILDING ANALYSIS, Detailed plan from below and above the ground
fig 428A, first test extra facade
fig 174A, drawing, current structure analyse
fig 300A, Basiliek van Koekelberg
fig 300B, Basiliek van Koekelberg
fig 620A, lecture atelier Haegheman Temmerman
fig 345A, La Fábrica – Ricardo Bofill
fig 372A, Research roof structure diving tank
fig 372B, Research roof structure diving tank
fig 293A, Core WTC
fig 198A, sketch
fig 467A, l’unionfaitlaforce
fig 748A, STADSPARK VYNCKIER/ DE SCHIJF
fig 748B, STADSPARK VYNCKIER/ DE SCHIJF
fig 748C, STADSPARK VYNCKIER/ DE SCHIJF
fig 748D, STADSPARK VYNCKIER/ DE SCHIJF
fig 512A, photo, A. Lavalléestraat
fig 512B, photo, A. Lavalléestraat
fig 512C, A. Lavalléestraat
fig 512D, photo, A. Lavalléestraat
fig 393A, model, Cathedrale Communale
fig 393B, model, Cathedrale Communale
fig 393C, model, Cathedrale Communale
fig 393D, model, Cathedrale Communale
fig 433A, model, jury WTC
fig 433B, model, jury WTC
fig 433C, model, jury WTC
fig 178A, model, Final model, B, 1:50
fig 443A, mapping trough the lens of G&G
fig 214A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 469A, belibel
fig 525A, photo, Analyse Swiss Sound Box – Peter Zumthor, Swiss Sound Box - Peter Zumthor
fig 623A, Structuur Schijf
fig 456A, renovated structure
fig 761A, photo, Eve Babitz playing chess with Marcel Duchamp, Pasadena 1963
fig 569A, bouw fabriek schoorsteen
fig 569B, bouw fabriek schoorsteen
fig 569C, bouw fabriek schoorsteen
fig 659A, Parochiezaal
fig 659B, Parochiezaal
fig 592A, photo, Vynckier Site, masterplan, sketch
fig 714A, photo, Vynckier, Masterplan, Zicht op plein
fig 226A, drawing, proces_27
fig 173A, model, model analyse
fig 573A, Masterplan
fig 272A, Zuidertoren
fig 272B, Zuidertoren
fig 272C, Zuidertoren
fig 185A, DECORMAQUETTE
fig 651A, Building with shed structure
fig 1A, drawing, STEEL JOINT
fig 628A, model, De Schijf
fig 628B, model, De Schijf
fig 29A, model, STEKO – Building Blocks, The basic elements of the STEKO® building system
fig 29B, photo, STEKO – Building Blocks
fig 29C, photo, STEKO – Building Blocks
fig 41A, drawing, Steel structure
fig 41B, drawing, Steel structure
fig 41C, drawing, Steel structure
fig 41D, drawing, Steel structure
fig 618A, werfbezoek
fig 212A, final isometric Axel and Luna
fig 712A, photo, Vynckier, Masterplan, Maquette
fig 75A, model, Construction details of a car dealers garage, Joint of a column, primary and secondary roof beams.
fig 75B, drawing, Construction details of a car dealers garage, Joint of a column, primary and secondary roof beams.
fig 75C, drawing, Construction details of a car dealers garage, Connection of the structure of the two halls.
fig 731A, Vynckier Saw Shedroof
fig 731B, Vynckier Saw Shedroof
fig 731C, Vynckier Saw Shedroof
fig 354A, Vertical Garden WTC, “Hanging the stairs” Sketches
fig 13A, photo, Arrival_Tower
fig 442A, hopvandenbrandenstraat.
fig 442B, hopvandenbrandenstraat.
fig 442C, hopvandenbrandenstraat.
fig 378A, Wooden stairs in steel structure
fig 86A, photo, Wittemolenstraat, Sint – Amandsberg, OLYMPUS DIGITAL CAMERA
fig 86B, Wittemolenstraat, Sint – Amandsberg, OLYMPUS DIGITAL CAMERA
fig 585A, Proposal Facade Vynckier site
fig 635A, Structure ConnectingGrid
fig 327A, WTC – model
fig 327B, WTC – model
fig 20A, drawing, stabilizing structural systems, different ways to stabilize structure
fig 420A, concerthal akoestiek
fig 420B, model, concerthal akoestiek
fig 420C, drawing, concerthal akoestiek
fig 451A, wonen VS industrie
fig 2A, photo, ‘De Nobele’ – Site, Alongside the structure there's a workspace for a local artist.
fig 2B, photo, ‘De Nobele’ – Site, The unfinished upper part of the old textile factory.
fig 2C, photo, ‘De Nobele’ – Site, Detail of a main concrete column.
fig 2D, ‘De Nobele’ – Site, Analysis on which structure stays and which one disappears.
fig 633A, OFFICE – RTS Building
fig 633B, OFFICE – RTS Building
fig 754A, photo, Vynckier 2, Principe, Maquette, Inkom
fig 357A, Diving Tank, WTC
fig 452A, Repitition
fig 254A, The ramp
fig 254B, The ramp
fig 254C, The ramp
fig 344A, How to become a Niemeyer
fig 511A, model, DAUWSTRAAT MODEL
fig 511B, DAUWSTRAAT MODEL
fig 511C, DAUWSTRAAT MODEL
fig 511D, DAUWSTRAAT MODEL
fig 90A, Connection of a steel beam to a concrete wall
fig 90B, Connection of a steel beam to a concrete wall
fig 726A, photo, Vynckier 2, Vynckier 2, Wachtgevel
fig 304A, work documents
fig 709A, photo, Vynckier, Masterplan, Vooraanzicht maquette
fig 672A, Aanzicht westgevel
fig 299A, WTC – plan section
fig 760A, maquette
fig 760B, maquette
fig 760C, maquette
fig 760D, maquette
fig 107A, drawing, details in color
fig 107B, details in color
fig 107C, details in color
fig 107D, details in color
fig 154A, HAMAM – 17.04
fig 154B, HAMAM – 17.04
fig 546A, Constructie detail werfbezoek
fig 575A, les 18/03
fig 575B, drawing, les 18/03
fig 575C, drawing, les 18/03
fig 216A, drawing, proces_13
fig 365A, Axo volumes
fig 365B, Axo volumes
fig 121A, Pictures Model
fig 121B, Pictures Model
fig 727A, Vynckier Site Saw-tooth roof
fig 727B, Vynckier Site Saw-tooth roof
fig 727C, Vynckier Site Saw-tooth roof
fig 727D, Vynckier Site Saw-tooth roof
fig 22A, photo, factory Gentbrugge – Site, wooden beam pattern
fig 22B, drawing, factory Gentbrugge – Site
fig 22C, drawing, factory Gentbrugge – Site
fig 22D, drawing, factory Gentbrugge – Site, masonry
fig 371A, Glass corner “box” vertical garden
fig 152A, Reference: ALEXANDER BRODSKY 95 DEGREES RESTAURANT
fig 152B, photo, Reference: ALEXANDER BRODSKY 95 DEGREES RESTAURANT
fig 152C, photo, Reference: ALEXANDER BRODSKY 95 DEGREES RESTAURANT
fig 482A, work in progress
fig 482B, work in progress
fig 246A, Axonometria
fig 349A, Scheme structures silo
fig 349B, Scheme structures silo
fig 273A, References Prestige Towers
fig 724A, photo, Vynckier 2, Vynckier 2, Schets inkom
fig 211A, proces_12
fig 117A, model, Test model of 19 04 2017
fig 117B, model, Test model of 19 04 2017
fig 117C, model, Test model of 19 04 2017
fig 32A, drawing, Hangar INCO, Exploded construction of the hangar
fig 32B, drawing, Hangar INCO, Composition detail of brick, concrete columns and plinth
fig 32C, Hangar INCO
fig 32D, Hangar INCO
fig 411A, axo details
fig 411B, drawing, axo details
fig 688A, ingrepen op aanwezige context
fig 688B, ingrepen op aanwezige context
fig 150A, Composite steel columns
fig 376A, STRUCTUREMODEL_SERVICEFLATS_1
fig 376B, STRUCTUREMODEL_SERVICEFLATS_1
fig 476A, work in progress
fig 476B, work in progress
fig 587A, drawing, VERTICAL FARMING WITH WATER PURIFICATION
fig 587B, photo, VERTICAL FARMING WITH WATER PURIFICATION
fig 600A, Masterplan 25/03
fig 518A, space and event
fig 336A, Werkmaquette
fig 201A, Floors sections
fig 168A, Tempory billboard on tempory structure
fig 127A, model, Final
fig 127B, drawing, Final
fig 127C, drawing, Final
fig 604A, drawing, voorstellen inplanting
fig 604B, voorstellen inplanting
fig 679A, model, Dwarse snede woning
fig 582A, Mosterdfabriek Oudenaarde
fig 51A, photo, Project Nonnemeersstraat, Ghent
fig 51B, drawing, Project Nonnemeersstraat, Ghent
fig 51C, drawing, Project Nonnemeersstraat, Ghent
fig 51D, drawing, Project Nonnemeersstraat, Ghent
fig 503A, Section A110
fig 281A, werfbezoek – fout wapeningsstaal
fig 125A, Site visit
fig 247A, WTC pattern of the pillars
fig 560A, section engine room archive
fig 118A, photo, Test model of 26 04 2017
fig 118B, photo, Test model of 26 04 2017
fig 118C, photo, Test model of 26 04 2017
fig 486A, Stut-opties
fig 403A, drawing, Drawing of buildup wintergarden
fig 383A, WTC EXISTING STRUCTURE
fig 590A, Vynckier Site, first proposal, scheme
fig 132A, 4 Column House
fig 61A, roof on/between containers
fig 61B, roof on/between containers
fig 61C, roof on/between containers
fig 61D, roof on/between containers
fig 581A, model, Masterplan Vynckier
fig 665A, Markthal
fig 665B, model, Markthal
fig 665C, drawing, Markthal
fig 665D, model, Markthal
fig 338A, Maquette 1/50
fig 609A, drawing, Vynckier
fig 609B, model, Vynckier
fig 609C, drawing, Vynckier
fig 373A, cathédrale communale work documents
fig 373B, cathédrale communale work documents
fig 745A, photo, Strabag – Stapelplein Gent, Hole for crane inside basement
fig 8A, photo, FRAC, Dunkerque by Lacaton & Vasal, Frontal Facade, showing the old building and new 'copy' next to each other
fig 8B, photo, FRAC, Dunkerque by Lacaton & Vasal
fig 8C, photo, FRAC, Dunkerque by Lacaton & Vasal, The beautiful transparency of the skin invites the outside world in and ceases to be distant as an art institution might be. The shell does only what it is meant to do, protect its core from the outer elements. The glass and steel myth was reinterpreted and altered with a plastic and steel frame.
fig 8D, photo, FRAC, Dunkerque by Lacaton & Vasal, Steel connection between the old and new building.
fig 115A, photo, Site visit
fig 115B, photo, Site visit
fig 115C, photo, Site visit
fig 115D, photo, Site visit
fig 67A, College Football Hall of Fame, Robert Venturi & Denise Scott Brown
fig 67B, College Football Hall of Fame, Robert Venturi & Denise Scott Brown
fig 439A, model, WTC remodel – final presentation
fig 439B, model, WTC remodel – final presentation
fig 439C, model, WTC remodel – final presentation
fig 439D, model, WTC remodel – final presentation
fig 586A, model, Proposal Masterplan Model
fig 409A, drawing, Sfeer
fig 409B, drawing, Sfeer
fig 409C, drawing, Sfeer
fig 661A, future for the fireplace
fig 135A, model, Final model
fig 682A, 27/05
fig 682B, 27/05
fig 682C, 27/05
fig 682D, drawing, 27/05
fig 84A, photo, Study models, Model 1/25
fig 84B, photo, Study models, Model 1/25
fig 84C, photo, Study models, Model 1/25
fig 228A, proces_30
fig 385A, CATHEDRALE COMMUNALE_SECTIONS
fig 385B, CATHEDRALE COMMUNALE_SECTIONS
fig 109A, photo, Japanese House, 1907, Wood construction by 'master carpenter' Nishida Isaburo
fig 260A, REA new ramp
fig 497A, roof structure
fig 612A, Pavilion on Vynckier Site
fig 612B, Pavilion on Vynckier Site
fig 612C, Pavilion on Vynckier Site
fig 612D, Pavilion on Vynckier Site
fig 356A, Notre-Dame in BXL?
fig 251A, DEEP PLAN construction detail 1, structural detail 1
fig 377A, Wooden box in steel structure
fig 325A, work documents 20180417
fig 325B, work documents 20180417
fig 325C, work documents 20180417
fig 624A, Masterplan Model 2
fig 102A, drawing, club house
fig 307A, STRUCTURE WTC
fig 307B, STRUCTURE WTC
fig 379A, Model structure
fig 381A, Final design: looking inside the model
fig 381B, Final design: looking inside the model
fig 151A, photo, Site ‘Huidevetterken’, L-profile column
fig 151B, photo, Site ‘Huidevetterken’, Steel detail
fig 599A, Masterplan Model 2
fig 110A, drawing, Current structure analyse
fig 110B, drawing, Current structure analyse
fig 110C, Current structure analyse
fig 110D, Current structure analyse
fig 301A, WTC Plan/Section Studentdorms
fig 69A, models
fig 303A, atelier
fig 35A, drawing, Floor systems of bricks
fig 35B, drawing, Floor systems of bricks
fig 35C, drawing, Floor systems of bricks
fig 35D, model, Floor systems of bricks
fig 270A, Willis Tower
fig 270B, Willis Tower
fig 219A, drawing, proces_19
fig 315A, Tetris Within A Tetris
fig 749A, STADSPARK VYNCKIER/ DE SCHIJF
fig 749B, STADSPARK VYNCKIER/ DE SCHIJF
fig 749C, STADSPARK VYNCKIER/ DE SCHIJF
fig 432A, drawing, WTC remodel – detail of roof of rooftop extension
fig 432B, drawing, WTC remodel – detail of roof of rooftop extension
fig 432C, drawing, WTC remodel – detail of roof of rooftop extension
fig 432D, drawing, WTC remodel – detail of roof of rooftop extension
fig 292A, WTC NIV + 27
fig 196A, AXONOMETRIC
fig 233A, model, Valentin Graf and Borja Fernandez
fig 542A, Isomo uitsparing voor TPG betonvloer
fig 114A, drawing, Existing structure
fig 114B, drawing, Existing structure, Axo
fig 114C, drawing, Existing structure, Section
fig 114D, photo, Existing structure
fig 564A, Front façade and back façade of building 4 and 4A, Vynckier site
fig 673A, drawing, Masterplan
fig 523A, Vynckier site bezoek
fig 120A, Reference structure steel
fig 120B, Reference structure steel
fig 120C, Reference structure steel
fig 137A, model, photos models
fig 137B, photo, photos models
fig 137C, model, photos models
fig 137D, photos models
fig 737A, Primary Circles_Detailed section
fig 384A, CATHEDRALE COMMUNALE_PLANS
fig 346A, Site visite Orsi Academy
fig 346B, Site visite Orsi Academy
fig 346C, Site visite Orsi Academy
fig 346D, Site visite Orsi Academy
fig 239A, PHOTO
fig 190A, meetings
fig 65A, test model: terraces &facade
fig 5A, photo, Concrete Structure, Concrete Grid Structure
fig 5B, photo, Concrete Structure, Concrete Skylight
fig 49A, Model #2
fig 740A, Vynckier site, model
fig 138A, Sint – Amandsberg site, Gent. Details
fig 287A, WTC 1 axo tetris
fig 537A, photo, Rue Franklin 25bis, Paris – Auguste Perret
fig 405A, drawing, DETAIL_SILO
fig 388A, CATHEDRALE COMMUNALE_ISOMETRIC
fig 549A, Jun Igarashi – Hat H house
fig 122A, Structure site Nieuwevaart Gent
fig 122B, Structure site Nieuwevaart Gent
fig 76A, Project Kievit
fig 76B, Project Kievit
fig 76C, Project Kievit
fig 76D, Project Kievit
fig 465A, Tree Tops 2.0
fig 445A, George&Gilbert
fig 148A, Inversion of the field
fig 289A, Louis Sullivan – The tall office building artistically considered
fig 23A, photo, Poco Loco – Fully automatic warehouse, View from the street
fig 23B, photo, Poco Loco – Fully automatic warehouse, section build on the ground
fig 23C, photo, Poco Loco – Fully automatic warehouse, connection of 2 different sections
fig 23D, photo, Poco Loco – Fully automatic warehouse, reinforcement for windloads
fig 133A, photo, Final urban model
fig 133B, Final urban model
fig 133C, model, Final urban model
fig 305A, Site Visit 1
fig 305B, Site Visit 1
fig 305C, Site Visit 1
fig 305D, Site Visit 1
fig 193A, meetings
fig 312A, A Cut Into Our Model
fig 312B, A Cut Into Our Model
fig 312C, A Cut Into Our Model
fig 466A, drawing, hopvandenbrandenstraat.
fig 311A, Analysing the parking lot
fig 311B, Analysing the parking lot
fig 311C, Analysing the parking lot
fig 311D, Analysing the parking lot
fig 143A, structural color
fig 143B, structural color
fig 319A, exploded sokkel
fig 374A, Cathedrale Communale
fig 324A, werfbezoek
fig 324B, werfbezoek
fig 324C, werfbezoek
fig 398A, drawing, Isometrie gevel
fig 186A, Model
fig 186B, Model
fig 186C, Model
fig 513A, final jury @ KANAL bxl
fig 513B, final jury @ KANAL bxl
fig 513C, final jury @ KANAL bxl
fig 513D, final jury @ KANAL bxl
fig 430A, WTC remodel – a tower can have a lot of different plans
fig 430B, WTC remodel – a tower can have a lot of different plans
fig 430C, WTC remodel – a tower can have a lot of different plans
fig 430D, WTC remodel – a tower can have a lot of different plans
fig 380A, The masters refer
fig 647A, Green Industry ?
fig 699A, Plan / section Manchester
fig 699B, Plan / section Manchester
fig 699C, Plan / section Manchester
fig 367A, Opwervendag Nemo link
fig 367B, Opwervendag Nemo link
fig 367C, Opwervendag Nemo link
fig 367D, Opwervendag Nemo link
fig 259A, model detail
fig 358A, Overlaying Bamboo “hinge”
fig 99A, Basic Concrete Prefab Construction, construction site
fig 99B, Basic Concrete Prefab Construction, Connection in the center of a diagonal buttress
fig 99C, Basic Concrete Prefab Construction, Top connection of a diagonal buttress
fig 99D, Basic Concrete Prefab Construction, Floor connection of a diagonal buttress
fig 698A, Axonometries CONNECTING GRID
fig 698B, Axonometries CONNECTING GRID
fig 570A, photo, Vynckier, Vynckier_Productiehal
fig 27A, drawing, Types of steel trusses
fig 142A, Urban design
fig 142B, Urban design
fig 657A, accordeon raam detail
fig 561A, inplantingsmaquette, burst
fig 200A, photo, Axonometry Limit – Axel and Luna :)
fig 282A, werfbezoek – zettingsvoegen
fig 62A, container cut outs
fig 62B, container cut outs
fig 62C, container cut outs
fig 62D, container cut outs
fig 318A, Axonometric WTC
fig 693A, Modelshots CONNECTING GRID
fig 693B, Modelshots CONNECTING GRID
fig 693C, model, Modelshots CONNECTING GRID
fig 693D, Modelshots CONNECTING GRID
fig 159A, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159B, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159C, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159D, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 50A, drawing, OLD vs. NEW
fig 576A, Model of vision on masterplan, scale 1/1000
fig 12A, photo, Industrial Structure
fig 12B, photo, Industrial Structure
fig 265A, John Hancock Center
fig 265B, John Hancock Center
fig 265C, John Hancock Center
fig 265D, John Hancock Center
fig 149A, Sketches
fig 149B, Sketches
fig 276A, Structure WTC 1 +3 & +24
fig 276B, Structure WTC 1 +3 & +24
fig 276C, Structure WTC 1 +3 & +24
fig 276D, Structure WTC 1 +3 & +24
fig 9A, photo, Getting some help, Getting some help.
fig 181A, final drawings
fig 181B, drawing, final drawings
fig 57A, Mid-Process model
fig 350A, How To Become A Niemeyer
fig 510A, Final maquette
fig 510B, Final maquette
fig 510C, photo, Final maquette
fig 375A, WERKMAQUETTE_4.1
fig 59A, PUNCHED/PUNCTURED BEAM
fig 59B, PUNCHED/PUNCTURED BEAM
fig 59C, PUNCHED/PUNCTURED BEAM
fig 663A, working in quarantaine
fig 716A, photo, Vynckier 2, Vynckier 2, Structuur, Grid Vynckier 1
fig 105A, WASSERIJ DER VLAANDEREN
fig 105B, WASSERIJ DER VLAANDEREN
fig 105C, WASSERIJ DER VLAANDEREN
fig 105D, WASSERIJ DER VLAANDEREN
fig 594A, Masterplan Vynckiersite Gent
fig 594B, Masterplan Vynckiersite Gent
fig 594C, Masterplan Vynckiersite Gent
fig 134A, model, Structure models
fig 416A, model, werkmaquette
fig 416B, model, werkmaquette
fig 202A, WALL LIMIT AXONOMETRIC
fig 739A, Primaru Circles_photos
fig 704A, De Nieuwe Vynckier – Incubator – Concept
fig 298A, WTC axo concepts
fig 288A, Voorstel programma toren
fig 101A, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101B, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101C, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101D, drawing, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 195A, visits
fig 176A, FINAL MODEL
fig 176B, FINAL MODEL
fig 217A, drawing, proces_17
fig 762A, drawing, Projection of chessboard grid on Vynckier site
fig 234A, model, João Branco and Alejandra Calvo
fig 60A, photo, SIMPLE CONSTRUCTION
fig 60B, SIMPLE CONSTRUCTION
fig 60C, SIMPLE CONSTRUCTION
fig 236A, model,Jukyung & Uk
fig 220A, drawing, proces_20
fig 6A, drawing, Drawing connection of steel structure
fig 6B, drawing, Drawing connection of steel structure
fig 278A, werfbezoek, SAMSUNG CSC
fig 426A, Early plan social triplex
fig 455A, Enclosed houses
fig 455B, photo, Enclosed houses
fig 131A, Blekerijstraat site photos
fig 131B, Blekerijstraat site photos
fig 131C, Blekerijstraat site photos
fig 131D, Blekerijstraat site photos
fig 531A, Study of the capital
fig 43A, photo, Hot Rivet, knooppunt staalstructuur
fig 52A, CONSTRUCTION SITE
fig 92A, MODEL #2, Cross-section model of the gasholder
fig 92B, MODEL #2, Cross-section model of the gasholder
fig 92C, MODEL #2, Cross-section model of the gasholder
fig 7A, drawing, types of compound beam
fig 238A, AXONOMETRIC, Jukyung & Uk
fig 249A, photo, working session
fig 557A, Combination industry and living, Biestebroek quay – Plusoffice Architects & Collectif WRKSHP
fig 557B, Combination industry and living, Biestebroek quay – Plusoffice Architects & Collectif WRKSHP
fig 557C, Combination industry and living, Biestebroek quay – Plusoffice Architects & Collectif WRKSHP
fig 619A, photo, SCHETSEN 1/04
fig 619B, SCHETSEN 1/04
fig 619C, photo, SCHETSEN 1/04
fig 619D, drawing, SCHETSEN 1/04
fig 708A, Model
fig 539A, Rudolf Olgiati Column
fig 213A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 541A, ECAM – Agwa Architects
fig 541B, ECAM – Agwa Architects
fig 189A, MAIN PLAN
fig 454A, collage de canal.brussels á la G&G
fig 648A, The Nantes Saint-Nazaire Higher School of Fine Arts
fig 650A, New Shed structure
fig 650B, New Shed structure
fig 674A, model, Schijf x Manchester
fig 674B, Schijf x Manchester
fig 674C, Schijf x Manchester
fig 674D, Schijf x Manchester
fig 707A, De Nieuwe Vynckier – Incubator – Passerel
fig 89A, photo, Study models
fig 89B, Study models
fig 89C, photo, Study models, Using the same logic to connect two pieces to find the right length
fig 552A, Parkeergebouw Ledeberg, Nieuw Parkeergebouw Ledeberg
fig 406A, drawing, SECTION_BREWERY_AA’
fig 493A, test materiality – housing tower
fig 392A, Cathedrale Communale
fig 392B, Cathedrale Communale
fig 392C, Cathedrale Communale
fig 392D, Cathedrale Communale
fig 424A, drawing, pt.2
fig 424B, drawing, pt.2
fig 424C, drawing, pt.2
fig 235A, model, Laia Bonet and Charlette Frémont
fig 572A, Vynckier Site masterplan sketch
fig 520A, Marika-Alderton House – Glenn Murcutt
fig 625A, drawing, Construction in wood for Manchester
fig 444A, Visible structure
fig 175A, drawing, Project BOMA
fig 175B, drawing, Project BOMA
fig 175C, drawing, Project BOMA
fig 175D, drawing, Project BOMA
fig 321A, plan woning
fig 491A, detail – wood & wood connection
fig 491B, detail – wood & wood connection
fig 491C, detail – wood & wood connection
fig 387A, CATHEDRALE COMMUNALE_PROGRAM
fig 387B, CATHEDRALE COMMUNALE_PROGRAM
fig 18A, photo, Wood Hollow Core Slab
fig 18B, photo, Wood Hollow Core Slab
fig 694A, Modelshots CONNECTING GRID
fig 694B, Modelshots CONNECTING GRID
fig 694C, Modelshots CONNECTING GRID
fig 694D, Modelshots CONNECTING GRID
fig 437A, MAQUETTE_WTC_ONTWERP
fig 437B, MAQUETTE_WTC_ONTWERP
fig 437C, MAQUETTE_WTC_ONTWERP
fig 437D, MAQUETTE_WTC_ONTWERP
fig 649A, BOX ON STEEL
fig 715A, photo, Vynckier, Masterplan, Zicht op Manchester 1 en overdekte markt
fig 670A, Masterplan Vynckier
fig 425A, Distinction in program
fig 425B, Distinction in program
fig 499A, photo, maquettefoto A. Lavalléestraat
fig 562A, Machinekamer Vynckier site
fig 631A, fake Mies
fig 631B, fake Mies
fig 597A, NIEUWE VYNCKIER
fig 153A, DRAWINGS
fig 153B, DRAWINGS
fig 153C, DRAWINGS
fig 153D, DRAWINGS
fig 554A, Vynckier Manchester I Foundation
fig 751A, STADSPARK VYNCKIER/ DE SCHIJF
fig 751B, STADSPARK VYNCKIER/ DE SCHIJF
fig 751C, STADSPARK VYNCKIER/ DE SCHIJF
fig 751D, STADSPARK VYNCKIER/ DE SCHIJF
fig 533A, Werf, Temporary school of Villejuif, Jean Prouvé
fig 63A, Model tests
fig 204A, meetings, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 461A, Marc-Antoine Laugier ‘Essay on Architecture’
fig 461B, Marc-Antoine Laugier ‘Essay on Architecture’
fig 108A, photo, Gent Voorhaven PortService Warehouses, Large Warehouse facades
fig 108B, photo, Gent Voorhaven PortService Warehouses, small warehouse
fig 108C, photo, Gent Voorhaven PortService Warehouses, Bombed structure inside
fig 108D, photo, Gent Voorhaven PortService Warehouses, Bombed structure old warehouses
fig 10A, drawing, CORRUGATED WEB BEAM, Production GLP Beam
fig 10B, photo, CORRUGATED WEB BEAM, Connection GLP to GLP
fig 10C, photo, CORRUGATED WEB BEAM, Connection GLP to column
fig 10D, photo, CORRUGATED WEB BEAM, Example project
fig 39A, drawing, Japan wood connection in chamonix
fig 221A, model, work in progress
fig 517A, Werfbeeld 51 Rue Raynouard – Perret
fig 613A, Masterplan 25/03 & 1/04 2020
fig 613B, Masterplan 25/03 & 1/04 2020
fig 613C, Masterplan 25/03 & 1/04 2020
fig 613D, Masterplan 25/03 & 1/04 2020
fig 470A, werf, Aldi. Sint-Niklaas
fig 470B, werf, Aldi. Sint-Niklaas
fig 123A, New structures
fig 705A, De Nieuwe Vynckier – Incubator – Section
fig 112A, photo, Hans Chr. Hansen, Amager Koblingsstation, Facade detail
fig 112B, photo, Hans Chr. Hansen, Amager Koblingsstation
fig 112C, photo, Hans Chr. Hansen, Amager Koblingsstation
fig 494A, drawing, Betonnen wafelstructuur
fig 170A, photo, REFERENCES
fig 170B, REFERENCES
fig 170C, REFERENCES
fig 170D, REFERENCES
fig 232A, proces_33
fig 366A, Bochten testen
fig 366B, Bochten testen
fig 366C, Bochten testen
fig 230A, proces_32
fig 283A, werfbezoek – logisitek verdeelverdiep
fig 283B, werfbezoek – logisitek verdeelverdiep
fig 606A, stay safe
fig 603A, photo, Recycled U, Een manier van bouwen die de aarde zo min mogelijk belast. Als schakel tussen wonen en industrie die de site verbindt.
fig 603B, Recycled U
fig 488A, Structure LaVallée
fig 555A, Prefab Walls
fig 556A, Section Store Shed
fig 333A, REFERENTIE_2
fig 161A, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 161B, drawing, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 161C, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 161D, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 449A, photo, Gilbert & George
fig 568A, Vynckier oude luchtfoto
fig 507A, TOWER
fig 507B, TOWER
fig 507C, TOWER
fig 507D, TOWER
fig 417A, drawing, proces
fig 417B, proces
fig 369A, Structural model WTC brewery
fig 369B, Structural model WTC brewery
fig 129A, Pictures site Nieuwevaart
fig 129B, Pictures site Nieuwevaart
fig 231A, AXONOMETRIC
fig 478A, Wachtstaven
fig 616A, Model of masterplan CONNECTING GRID 1.0
fig 404A, model, Cathedrale Communale 1/200
fig 404B, model, Cathedrale Communale 1/200
fig 404C, model, Cathedrale Communale 1/200
fig 404D, model, Cathedrale Communale 1/200
fig 209A, drawing, proces_10
fig 24A, photo, Steel truss, center piece
fig 24B, photo, Steel truss, Beam and truss connection
fig 399A, Brewery visit
fig 399B, Brewery visit
fig 352A, Vertical Garden WTC
fig 352B, Vertical Garden WTC
fig 527A, ANALYSE Steilneset Memorial – PETER ZUMTHOR, Steilneset Memorial - Peter Zumthor
fig 757A, model, Vynckier 2, Principe, Inkom
fig 56A, sketches container : Stacking;Connection
fig 56B, sketches container : Stacking;Connection
fig 56C, sketches container : Stacking;Connection
fig 56D, sketches container : Stacking;Connection
fig 515A, model, END MODEL CNC
fig 515B, model, END MODEL CNC
fig 515C, END MODEL CNC
fig 286A, sketch on existing plan
fig 145A, STRUCTURAL DESIGN PRINCIPLES
fig 145B, STRUCTURAL DESIGN PRINCIPLES
fig 145C, STRUCTURAL DESIGN PRINCIPLES
fig 145D, STRUCTURAL DESIGN PRINCIPLES
fig 394A, model, Cathedrale Communale
fig 394B, model, Cathedrale Communale
fig 394C, model, Cathedrale Communale
fig 394D, model, Cathedrale Communale
fig 136A, Sint – Amandsberg site, Gent. Detail Model, OLYMPUS DIGITAL CAMERA
fig 516A, Structural analysis, AFASIA, P. FLammer
fig 471A, GEORGE & GILBERT
fig 471B, GEORGE & GILBERT
fig 475A, FUNDERING
fig 667A, Maquette Terminal
fig 667B, Maquette Terminal
fig 667C, Maquette Terminal
fig 667D, Maquette Terminal
fig 621A, U VYNCKIER
fig 621B, U VYNCKIER
fig 184A, Design
fig 184B, Design
fig 184C, Design
fig 184D, Design
fig 722A, photo, Vynckier 2, Vynckier 2, Principe 'bloembakken'
fig 480A, Review Primary structure – Kanal Brussels, Processed with VSCO with m5 preset
fig 255A, WTC pillar dimensions
fig 302A, WTC Sketch
fig 662A, Concrete Disc building
fig 653A, Building shed structure new addition
fig 458A, depotdesign
fig 601A, Vynckier Site Masterplan Model
fig 55A, section draft
fig 602A, Proposal masterplan Vynckier site
fig 104A, drawing, supporting points in sports
fig 104B, supporting points in sports
fig 104C, supporting points in sports
fig 630A, Vynckier 2
fig 495A, DETAIL – brick meets wood
fig 407A, drawing, Facade
fig 646A, MASTERPLAN VYNCKIER
fig 147A, model, ‘HUIDEVETTERKEN’ werkmaquette
fig 147B, drawing, ‘HUIDEVETTERKEN’ werkmaquette, existing situation plan
fig 147C, model, ‘HUIDEVETTERKEN’ werkmaquette
fig 718A, photo, Vynckier 2, Vynckier 2, Primaire en secundaire structuur
fig 342A, Drawing of concrete silo
fig 530A, drawing, Section of Art & Architecture Building
fig 498A, A110 – 2M wide cohousing
fig 462A, House Botte – bOb Van Reeth
fig 242A, axonometric alejandra and joao
fig 306A, Site Visit 2
fig 306B, Site Visit 2
fig 306C, Site Visit 2
fig 306D, Site Visit 2
fig 505A, Axonometric NG17
fig 106A, drawing, SITE
fig 106B, drawing, SITE
fig 322A, Fotos werfbezoek
fig 322B, Fotos werfbezoek
fig 322C, Fotos werfbezoek
fig 310A, Architecture Noordwijk
fig 310B, Architecture Noordwijk
fig 485A, test housing tower
fig 330A, CONCEPTBEELD_1
fig 758A, ontwerpschetsen
fig 758B, ontwerpschetsen
fig 758C, ontwerpschetsen
fig 758D, ontwerpschetsen
fig 744A, drawing, axo Manchester and Tulou, axonometric drawing
fig 415A, omgeving analyse
fig 415B, drawing, omgeving analyse
fig 415C, drawing, omgeving analyse
fig 415D, drawing, omgeving analyse
fig 38A, drawing, pergola without roof connection
fig 33A, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre Gentbrugge - site
fig 33B, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre - Primary structure
fig 33C, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre Gentbrugge - Concrete ceiling
fig 33D, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre - fragment
fig 431A, drawing, WTC remodel – section and facades
fig 431B, drawing, WTC remodel – section and facades
fig 431C, drawing, WTC remodel – section and facades
fig 431D, WTC remodel – section and facades
fig 31A, photo, Silos, tanks & holders, Fully assembled
fig 31B, photo, Silos, tanks & holders, Positioning the different panels
fig 31C, photo, Silos, tanks & holders, Pre-asssembly of the different panels
fig 697A, Axonometry of fragment CONNECTING GRID
fig 697B, Axonometry of fragment CONNECTING GRID
fig 675A, drawing, Dwarse snede
fig 664A, drawing, 27/05
fig 664B, drawing, 27/05
fig 664C, model, 27/05
fig 664D, drawing, 27/05
fig 750A, STADSPARK VYNCKIER/ DE SCHIJF
fig 703A, Facades
fig 703B, Facades
fig 141A, Site visit Sint-Martens-Latem
fig 141B, Site visit Sint-Martens-Latem
fig 141C, Site visit Sint-Martens-Latem
fig 141D, Site visit Sint-Martens-Latem
fig 695A, 3RROR cad to jpg
fig 103A, RECTOLIGHT
fig 81A, drawing, ANALYSE EXISTING STRUCTURES
fig 317A, Lina Bo Bardi MASP under construction
fig 684A, model
fig 684B, model
fig 684C, model
fig 684D, model
fig 314A, Conceptual thinking
fig 37A, drawing, corner of the sport fence
fig 17A, photo, SITE VISIT °2, On top you can see the combination of the concrete columns with the steel trusses.
fig 17B, photo, SITE VISIT °2, Prefabricated concrete elements fits perfectly in each other.
fig 17C, photo, SITE VISIT °2, The holes in the beams are made to put ducts through them.
fig 17D, photo, SITE VISIT °2, Prefabricated concrete elements fits perfectly in each other.
fig 610A, drawing, Vynckier
fig 610B, model, Vynckier
fig 610C, drawing, Vynckier
fig 215A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 529A, drawing, Sketch of Art & Architecture Building
No images selected…
fig 58A Model #1, posted by Stan Guldemont at 24.05.17 (filed under: wood)
fig 58B Model #1, posted by Stan Guldemont at 24.05.17 (filed under: wood)
fig 36A photo, Woonzorgcentrum Van Lierde, posted by Stan Guldemont at 15.03.17 (filed under: brick)
fig 412A Torre Velasca, posted by Dorien Moonen at 04.06.18 (filed under: concrete)
fig 412B Torre Velasca, posted by Dorien Moonen at 04.06.18 (filed under: concrete)
fig 645A PALACE OF LABOUR, TURIN, 1961, posted by Emile Bouckaert at 05.05.20 (filed under: concrete)
fig 584A Proposal Masterplan Vynckier, posted by Lode De Smet Van Damme at 18.03.20 (filed under:)
fig 258A model WTC, posted by Floris De Bruyn at 01.09.17 (filed under: glass steel)
fig 567A In het spoor van Serafinus, posted by Floris De Bruyn at 08.03.20 (filed under:)
fig 596A drawing, 25/03, posted by Lene Lemmens at 24.03.20 (filed under:)
fig 596B drawing, 25/03, posted by Lene Lemmens at 24.03.20 (filed under:)
fig 596C model, 25/03, posted by Lene Lemmens at 24.03.20 (filed under:)
fig 70A photo, Pictures Nonnemeersstraat, Ghent, posted by Jean-Louis Verstraete at 24.05.17 (filed under: steel)
fig 70B photo, Pictures Nonnemeersstraat, Ghent, posted by Jean-Louis Verstraete at 24.05.17 (filed under: steel)
fig 222A model, proces_22, posted by Charlette Fremont at 26.07.17 (filed under: concrete)
fig 489A Structure Beekstraat, posted by Tom Galmart at 05.05.19 (filed under: brick wood)
fig 574A model, Masterplan Vynckiersite, posted by Cisse Vercauteren at 17.03.20 (filed under:)
fig 574B model, Masterplan Vynckiersite, posted by Cisse Vercauteren at 17.03.20 (filed under:)
fig 250A working session, posted by Floris De Bruyn at 30.08.17 (filed under: concrete glass plastics steel)
fig 472A photo, workshop, posted by Floris De Bruyn at 18.03.19 (filed under:)
fig 472B workshop, posted by Floris De Bruyn at 18.03.19 (filed under:)
fig 295A Civic Center – SOM, posted by Eva Van Craenenbroeck at 19.03.18 (filed under: concrete)
fig 742A drawing, Tulou, posted by Astrid Christiaens at 27.05.20 (filed under:)
fig 742B model, Tulou, posted by Astrid Christiaens at 27.05.20 (filed under:)
fig 742C model, Tulou, posted by Astrid Christiaens at 27.05.20 (filed under:)
fig 742D model, Tulou, posted by Astrid Christiaens at 27.05.20 (filed under:)
fig 71A photo, axonometric view on docks site, posted by Rosa Fens at 24.05.17 (filed under: brick steel)
fig 588A Proposal Masterplan, posted by Dean Peeters at 18.03.20 (filed under:)
fig 719A photo, Vynckier 2, posted by Jolien De Smet at 27.05.20 (filed under:)
fig 543A Bambow bridge – Atelier Lai, posted by Wout Vandermeersch at 26.02.20 (filed under: wood)
fig 543B Bambow bridge – Atelier Lai, posted by Wout Vandermeersch at 26.02.20 (filed under: wood)
fig 671A Structuur Manchester 2, posted by Anouk Depaepe at 26.05.20 (filed under: steel)
fig 368A Structural model WTC brewery, posted by Sven de Smet at 10.05.18 (filed under: steel)
fig 368B Structural model WTC brewery, posted by Sven de Smet at 10.05.18 (filed under: steel)
fig 638A Shed structure with new volume, posted by Maurits Verstraete at 29.04.20 (filed under: concrete steel)
fig 638B Shed structure with new volume, posted by Maurits Verstraete at 29.04.20 (filed under: concrete steel)
fig 644A Masterplan, posted by Marie-lou Vermaerke at 30.04.20 (filed under: brick)
fig 483A Werkmaquettes concept DAUWSTRAAT/PICARDSTRAAT, posted by Inge Habils at 29.04.19 (filed under: concrete steel)
fig 483B Werkmaquettes concept DAUWSTRAAT/PICARDSTRAAT, posted by Inge Habils at 29.04.19 (filed under: concrete steel)
fig 227A proces_29, posted by Charlette Fremont at 26.07.17 (filed under: brick)
fig 199A sketch, posted by ricardo leitao at 24.07.17 (filed under: concrete)
fig 203A sketch, posted by ricardo leitao at 25.07.17 (filed under: concrete)
fig 680A model, Fragment schijf, posted by Fien Dequeker at 26.05.20 (filed under: concrete steel)
fig 680B Fragment schijf, posted by Fien Dequeker at 26.05.20 (filed under: concrete steel)
fig 680C Fragment schijf, posted by Fien Dequeker at 26.05.20 (filed under: concrete steel)
fig 680D Fragment schijf, posted by Fien Dequeker at 26.05.20 (filed under: concrete steel)
fig 268A Knights of Columbus, posted by Mattias Vandenbempt at 06.03.18 (filed under: steel)
fig 268B Knights of Columbus, posted by Mattias Vandenbempt at 06.03.18 (filed under: steel)
fig 268C Knights of Columbus, posted by Mattias Vandenbempt at 06.03.18 (filed under: steel)
fig 351A WERKMAQUETTE_PLINT, posted by Louis Lories at 23.04.18 (filed under:)
fig 21A photo, Tram depot Marconi – site visit, posted by Emmanuelle Vanhaesendonck at 15.03.17 (filed under: concrete steel wood)
fig 21B photo, Tram depot Marconi – site visit, posted by Emmanuelle Vanhaesendonck at 15.03.17 (filed under: concrete steel wood)
fig 21C photo, Tram depot Marconi – site visit, posted by Emmanuelle Vanhaesendonck at 15.03.17 (filed under: concrete steel wood)
fig 309A Balkony garden, posted by Mattias Vandenbempt at 15.04.18 (filed under: concrete)
fig 309B Balkony garden, posted by Mattias Vandenbempt at 15.04.18 (filed under: concrete)
fig 309C Balkony garden, posted by Mattias Vandenbempt at 15.04.18 (filed under: concrete)
fig 309D Balkony garden, posted by Mattias Vandenbempt at 15.04.18 (filed under: concrete)
fig 78A Site Secondary structure, posted by Tim Belaen at 24.05.17 (filed under: steel)
fig 78B Site Secondary structure, posted by Tim Belaen at 24.05.17 (filed under: steel)
fig 78C Site Secondary structure, posted by Tim Belaen at 24.05.17 (filed under: steel)
fig 78D Site Secondary structure, posted by Tim Belaen at 24.05.17 (filed under: steel)
fig 77A Concrete building elements, posted by Yvonne van der Poel at 24.05.17 (filed under: concrete)
fig 77B Concrete building elements, posted by Yvonne van der Poel at 24.05.17 (filed under: concrete)
fig 77C Concrete building elements, posted by Yvonne van der Poel at 24.05.17 (filed under: concrete)
fig 77D Concrete building elements, posted by Yvonne van der Poel at 24.05.17 (filed under: concrete)
fig 360A Structure underneath diving tank, posted by Mattias Vandenbempt at 01.05.18 (filed under: steel)
fig 736A Primary Circles_Model, posted by Emile Bouckaert at 27.05.20 (filed under: concrete)
fig 544A Bambow bridge – Atelier Lai, posted by Wout Vandermeersch at 26.02.20 (filed under: wood)
fig 389A CATHEDRALE COMMUNALE_DETAILS, posted by Sophie Leemans at 03.06.18 (filed under: concrete steel)
fig 361A Structure between diving tank and WTC 2tower, posted by Mattias Vandenbempt at 01.05.18 (filed under: steel)
fig 532A photo, Vynckier 1981-94, posted by Eva Roose at 20.02.20 (filed under: steel wood)
fig 532B photo, Vynckier 1981-94, posted by Eva Roose at 20.02.20 (filed under: steel wood)
fig 733A model, Project, The Modern Tulou, posted by Isra Cekaj at 27.05.20 (filed under:)
fig 733B model, Project, The Modern Tulou, posted by Isra Cekaj at 27.05.20 (filed under:)
fig 733C model, Project, The Modern Tulou, posted by Isra Cekaj at 27.05.20 (filed under:)
fig 733D model, Project, The Modern Tulou, posted by Isra Cekaj at 27.05.20 (filed under:)
fig 578A Digital masterplan, scale 1/1000, posted by Aaron Vanacker at 18.03.20 (filed under:)
fig 256A drawing, Structural core, posted by Nikolai Thyregaard at 01.09.17 (filed under: concrete)
fig 256B drawing, Structural core, posted by Nikolai Thyregaard at 01.09.17 (filed under: concrete)
fig 702A Masterplan, posted by Bram Degieter at 26.05.20 (filed under:)
fig 702B Masterplan, posted by Bram Degieter at 26.05.20 (filed under:)
fig 450A photo, Collage geïnspireerd op Gilbert & George, posted by Gala Kenis at 25.02.19 (filed under:)
fig 359A Detailing sketches, posted by Mattias Vandenbempt at 01.05.18 (filed under: steel)
fig 563A Section Vynckier Machinekamer, posted by Lode De Smet Van Damme at 08.03.20 (filed under: brick concrete)
fig 83A drawing, SITE ANALYSE, posted by Tim Belaen at 24.05.17 (filed under: steel)
fig 83B drawing, SITE ANALYSE, posted by Tim Belaen at 24.05.17 (filed under: steel)
fig 83C drawing, SITE ANALYSE, posted by Tim Belaen at 24.05.17 (filed under: steel)
fig 64A DOME – EPS + SPRAYED CONCRETE, posted by Manon Coppens at 24.05.17 (filed under: concrete steel)
fig 64B DOME – EPS + SPRAYED CONCRETE, posted by Manon Coppens at 24.05.17 (filed under: concrete steel)
fig 64C DOME – EPS + SPRAYED CONCRETE, posted by Manon Coppens at 24.05.17 (filed under: concrete steel)
fig 64D DOME – EPS + SPRAYED CONCRETE, posted by Manon Coppens at 24.05.17 (filed under: concrete steel)
fig 261A drawing, WTC_subtraction, posted by Timotheus de Beir at 06.01.18 (filed under: concrete steel)
fig 261B drawing, WTC_subtraction, posted by Timotheus de Beir at 06.01.18 (filed under: concrete steel)
fig 725A photo, Vynckier 2, posted by Jolien De Smet at 27.05.20 (filed under:)
fig 577A Sketch of masterplan, scale 1/1000, posted by Aaron Vanacker at 18.03.20 (filed under:)
fig 595A drawing, 25/03, posted by Lene Lemmens at 24.03.20 (filed under:)
fig 595B drawing, 25/03, posted by Lene Lemmens at 24.03.20 (filed under:)
fig 595C model, 25/03, posted by Lene Lemmens at 24.03.20 (filed under:)
fig 140A model making in the sun, posted by Helen Van de Vloet at 31.05.17 (filed under: concrete steel wood)
fig 140B model making in the sun, posted by Helen Van de Vloet at 31.05.17 (filed under: concrete steel wood)
fig 579A drawing, Masterplan, posted by Fien Dequeker at 18.03.20 (filed under:)
fig 390A CATHEDRALE COMMUNALE_PERSPECTIVE, posted by Sophie Leemans at 03.06.18 (filed under: concrete steel)
fig 492A NG17 – preliminary design 06/05 – hostel + offices, posted by Cedric Du Bois at 07.05.19 (filed under: concrete wood)
fig 492B NG17 – preliminary design 06/05 – hostel + offices, posted by Cedric Du Bois at 07.05.19 (filed under: concrete wood)
fig 591A Vynckier Site, first proposal, sketches, posted by Isra Cekaj at 18.03.20 (filed under:)
fig 11A photo, FC Muide, posted by Helen Van de Vloet at 15.03.17 (filed under: steel)
fig 11B photo, FC Muide, posted by Helen Van de Vloet at 15.03.17 (filed under: steel)
fig 11C photo, FC Muide, posted by Helen Van de Vloet at 15.03.17 (filed under: steel)
fig 550A photo, Site visit, posted by Nicolas Vanneste at 27.02.20 (filed under: concrete)
fig 550B photo, Site visit, posted by Nicolas Vanneste at 27.02.20 (filed under: concrete)
fig 550C photo, Site visit, posted by Nicolas Vanneste at 27.02.20 (filed under: concrete)
fig 79A drawing, detail construction garage box, posted by Hannes Mol at 24.05.17 (filed under: concrete)
fig 72A drawing, Structure of the big warehouse on docks site, posted by Rosa Fens at 24.05.17 (filed under: brick plastics steel)
fig 526A Photo during construction – Healey Guest House – ‘Cocoon House’, posted by Aaron Vanacker at 19.02.20 (filed under: steel wood)
fig 669A Site section Terminal, posted by Marie-lou Vermaerke at 26.05.20 (filed under: brick steel)
fig 457A George&Gilbert, posted by Inge Habils at 27.02.19 (filed under: brick concrete glass steel)
fig 245A model, Axel Fangueiro and Luna Fonseca, posted by Floris De Bruyn at 27.07.17 (filed under: brick concrete wood)
fig 343A Open structure + circulation, posted by Sven de Smet at 23.04.18 (filed under: steel)
fig 686A Maquette Masterplan, posted by Marie-lou Vermaerke at 26.05.20 (filed under: brick steel)
fig 224A studio, posted by Floris De Bruyn at 26.07.17 (filed under: concrete)
fig 701A 1 UNIT, posted by Bram Degieter at 26.05.20 (filed under: steel)
fig 701B 1 UNIT, posted by Bram Degieter at 26.05.20 (filed under: steel)
fig 453A Collage Gilbert and Georges, posted by Chloe Berton at 26.02.19 (filed under:)
fig 362A Bamboo exoskeleton stairs , Vertical garden, posted by Mattias Vandenbempt at 01.05.18 (filed under: wood)
fig 362B Bamboo exoskeleton stairs , Vertical garden, posted by Mattias Vandenbempt at 01.05.18 (filed under: wood)
fig 446A VERNACULAR, posted by Melissa Vanwezemael at 25.02.19 (filed under: wood)
fig 422A Final presentation, posted by Mattias Vandenbempt at 04.06.18 (filed under: concrete steel wood)
fig 422B Final presentation, posted by Mattias Vandenbempt at 04.06.18 (filed under: concrete steel wood)
fig 422C Final presentation, posted by Mattias Vandenbempt at 04.06.18 (filed under: concrete steel wood)
fig 422D Final presentation, posted by Mattias Vandenbempt at 04.06.18 (filed under: concrete steel wood)
fig 706A De Nieuwe Vynckier – Incubator – Model, posted by Bert Van Wijnendaele at 27.05.20 (filed under: steel)
fig 297A WTC situation plan, posted by Sophie Leemans at 19.03.18 (filed under:)
fig 652A Building shed structure axonometric, posted by Lode De Smet Van Damme at 06.05.20 (filed under: brick glass steel)
fig 759A detail schetsen, posted by Arne Ilsbroekx at 31.05.20 (filed under:)
fig 759B detail schetsen, posted by Arne Ilsbroekx at 31.05.20 (filed under:)
fig 759C detail schetsen, posted by Arne Ilsbroekx at 31.05.20 (filed under:)
fig 759D detail schetsen, posted by Arne Ilsbroekx at 31.05.20 (filed under:)
fig 347A Scheme structures silo, posted by Lien De Jonghe at 23.04.18 (filed under: steel)
fig 347B Scheme structures silo, posted by Lien De Jonghe at 23.04.18 (filed under: steel)
fig 280A werfbezoek – ultiem grid 740 x 740, posted by Sophie Leemans at 13.03.18 (filed under: concrete)
fig 280B werfbezoek – ultiem grid 740 x 740, posted by Sophie Leemans at 13.03.18 (filed under: concrete)
fig 116A drawing, Program, posted by Anton Parys at 30.05.17 (filed under: brick concrete glass plastics steel wood)
fig 116B photo, Program, posted by Anton Parys at 30.05.17 (filed under: brick concrete glass plastics steel wood)
fig 116C drawing, Program, posted by Anton Parys at 30.05.17 (filed under: brick concrete glass plastics steel wood)
fig 116D photo, Program, posted by Anton Parys at 30.05.17 (filed under: brick concrete glass plastics steel wood)
fig 158A Model of the Site, posted by Lars Nowé at 31.05.17 (filed under: brick concrete)
fig 158B Model of the Site, posted by Lars Nowé at 31.05.17 (filed under: brick concrete)
fig 401A drawing, Connection to the floor, posted by Sven de Smet at 03.06.18 (filed under: steel)
fig 85A photo, Analysis of the site, structure, detail, posted by Thomas Monsy at 24.05.17 (filed under: steel)
fig 85B photo, Analysis of the site, structure, detail, posted by Thomas Monsy at 24.05.17 (filed under: steel)
fig 85C photo, Analysis of the site, structure, detail, posted by Thomas Monsy at 24.05.17 (filed under: steel)
fig 85D photo, Analysis of the site, structure, detail, posted by Thomas Monsy at 24.05.17 (filed under: steel)
fig 30A photo, Silos, tanks & holders, posted by Alexander Van den Spiegel at 15.03.17 (filed under: steel)
fig 30B photo, Silos, tanks & holders, posted by Alexander Van den Spiegel at 15.03.17 (filed under: steel)
fig 30C photo, Silos, tanks & holders, posted by Alexander Van den Spiegel at 15.03.17 (filed under: steel)
fig 30D photo, Silos, tanks & holders, posted by Alexander Van den Spiegel at 15.03.17 (filed under: steel)
fig 496A model, Work in progress model CNC-site, posted by Hanlin Li at 20.05.19 (filed under: concrete)
fig 130A Example sites photos, posted by Michiel Vrolix at 31.05.17 (filed under: concrete steel)
fig 130B Example sites photos, posted by Michiel Vrolix at 31.05.17 (filed under: concrete steel)
fig 130C Example sites photos, posted by Michiel Vrolix at 31.05.17 (filed under: concrete steel)
fig 332A WERKMAQUETTE_3.0, posted by Louis Lories at 22.04.18 (filed under:)
fig 326A WTC model progress week 8, posted by Sophie Leemans at 17.04.18 (filed under: concrete steel wood)
fig 559A Model Engine Room, posted by Maurits Verstraete at 06.03.20 (filed under: concrete)
fig 559B Model Engine Room, posted by Maurits Verstraete at 06.03.20 (filed under: concrete)
fig 93A TECHNICAL DETAILS, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel wood)
fig 93B TECHNICAL DETAILS, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel wood)
fig 266A WTC Massive Model, posted by Laura Vanderdonckt at 06.03.18 (filed under: wood)
fig 191A meetings, posted by ricardo leitao at 24.07.17 (filed under: concrete)
fig 197A work in progress … axonometry, posted by Charlette Fremont at 24.07.17 (filed under: concrete steel)
fig 753A photo, Vynckier 2, posted by Jolien De Smet at 27.05.20 (filed under:)
fig 656A primary arcs, posted by Floris De Bruyn at 11.05.20 (filed under:)
fig 240A drawing, axonometry Marta and Luciana, posted by Floris De Bruyn at 27.07.17 (filed under: brick concrete steel)
fig 68A collage: walls around the field, posted by Helen Van de Vloet at 24.05.17 (filed under: concrete steel)
fig 524A photo, Les Monseigneurs – Primary Talks, posted by Floris De Bruyn at 19.02.20 (filed under:)
fig 524B Les Monseigneurs – Primary Talks, posted by Floris De Bruyn at 19.02.20 (filed under:)
fig 711A photo, Vynckier, posted by Jolien De Smet at 27.05.20 (filed under:)
fig 34A model, Lignatur floor/ roof element, posted by Deborah Dumarey at 15.03.17 (filed under: wood)
fig 34B model, Lignatur floor/ roof element, posted by Deborah Dumarey at 15.03.17 (filed under: wood)
fig 382A ANALYSIS WTC, posted by Sophie Leemans at 03.06.18 (filed under: concrete steel)
fig 382B ANALYSIS WTC, posted by Sophie Leemans at 03.06.18 (filed under: concrete steel)
fig 187A studio at carlos ramos’ pavillion, posted by ricardo leitao at 22.07.17 (filed under: concrete)
fig 53A visit construction site, posted by Deborah Dumarey at 24.05.17 (filed under: brick concrete steel)
fig 53B visit construction site, posted by Deborah Dumarey at 24.05.17 (filed under: brick concrete steel)
fig 53C visit construction site, posted by Deborah Dumarey at 24.05.17 (filed under: brick concrete steel)
fig 94A INDUSTRIAL CONSTRUCTION SITE, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel)
fig 94B INDUSTRIAL CONSTRUCTION SITE, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel)
fig 94C INDUSTRIAL CONSTRUCTION SITE, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel)
fig 721A Vynckier Circle Building, posted by Lode De Smet Van Damme at 27.05.20 (filed under: brick concrete glass steel wood)
fig 721B Vynckier Circle Building, posted by Lode De Smet Van Damme at 27.05.20 (filed under: brick concrete glass steel wood)
fig 721C Vynckier Circle Building, posted by Lode De Smet Van Damme at 27.05.20 (filed under: brick concrete glass steel wood)
fig 721D Vynckier Circle Building, posted by Lode De Smet Van Damme at 27.05.20 (filed under: brick concrete glass steel wood)
fig 611A drawing, 01/04, posted by Lene Lemmens at 31.03.20 (filed under:)
fig 611B drawing, 01/04, posted by Lene Lemmens at 31.03.20 (filed under:)
fig 611C drawing, 01/04, posted by Lene Lemmens at 31.03.20 (filed under:)
fig 479A KANAL review KUL UCL ULB, posted by Floris De Bruyn at 01.04.19 (filed under:)
fig 479B KANAL review KUL UCL ULB, posted by Floris De Bruyn at 01.04.19 (filed under:)
fig 479C KANAL review KUL UCL ULB, posted by Floris De Bruyn at 01.04.19 (filed under:)
fig 640A Masterplan model, posted by Maurits Verstraete at 29.04.20 (filed under:)
fig 477A vertrapping, posted by Floris De Bruyn at 25.03.19 (filed under:)
fig 545A Aansluiting staalframebouw, posted by Lene Lemmens at 27.02.20 (filed under: steel)
fig 44A drawing, STEEL JOINT, posted by Manon Coppens at 15.03.17 (filed under: steel)
fig 180A model, Site de Porre – primary structure model, posted by Deborah Dumarey at 31.05.17 (filed under: concrete steel wood)
fig 128A drawing, Final drawings, posted by Jean-Louis Verstraete at 31.05.17 (filed under: steel)
fig 128B model, Final drawings, posted by Jean-Louis Verstraete at 31.05.17 (filed under: steel)
fig 128C drawing, Final drawings, posted by Jean-Louis Verstraete at 31.05.17 (filed under: steel)
fig 128D drawing, Final drawings, posted by Jean-Louis Verstraete at 31.05.17 (filed under: steel)
fig 28A photo, Industrial warehouse, posted by Thomas Monsy at 15.03.17 (filed under: steel)
fig 28B photo, Industrial warehouse, posted by Thomas Monsy at 15.03.17 (filed under: steel)
fig 28C photo, Industrial warehouse, posted by Thomas Monsy at 15.03.17 (filed under: steel)
fig 28D photo, Industrial warehouse, posted by Thomas Monsy at 15.03.17 (filed under: steel)
fig 487A model, Model housing tower, posted by Tom Galmart at 05.05.19 (filed under: concrete wood)
fig 225A drawing, proces_24, posted by Amanda Amicis at 26.07.17 (filed under: brick)
fig 534A Schets, demonteerbare structuur, Jean Prouvé, posted by Isra Cekaj at 20.02.20 (filed under: steel)
fig 448A Adjacent, posted by Lucas Gemoets at 25.02.19 (filed under:)
fig 504A Section A110, posted by Lucas Gemoets at 03.06.19 (filed under: steel)
fig 666A OMA, posted by Dean Peeters at 26.05.20 (filed under: glass steel)
fig 666B OMA, posted by Dean Peeters at 26.05.20 (filed under: glass steel)
fig 666C OMA, posted by Dean Peeters at 26.05.20 (filed under: glass steel)
fig 666D OMA, posted by Dean Peeters at 26.05.20 (filed under: glass steel)
fig 386A CATHEDRALE COMMUNALE, posted by Sophie Leemans at 03.06.18 (filed under: concrete steel)
fig 580A Vynckier 5, posted by Bert Van Wijnendaele at 18.03.20 (filed under:)
fig 166A photo, FACADE DETAIL, posted by Lars Nowé at 31.05.17 (filed under: brick concrete)
fig 166B photo, FACADE DETAIL, posted by Lars Nowé at 31.05.17 (filed under: brick concrete)
fig 166C photo, FACADE DETAIL, posted by Lars Nowé at 31.05.17 (filed under: brick concrete)
fig 166D photo, FACADE DETAIL, posted by Lars Nowé at 31.05.17 (filed under: brick concrete)
fig 396A model, Small 1/200 scale model, posted by Sven de Smet at 03.06.18 (filed under: concrete steel)
fig 548A Manchester building – structure, posted by Bram Degieter at 27.02.20 (filed under: brick steel)
fig 548B Manchester building – structure, posted by Bram Degieter at 27.02.20 (filed under: brick steel)
fig 735A Primary Circles_structural system, posted by Emile Bouckaert at 27.05.20 (filed under: concrete)
fig 583A drawing, Drawing proposal Masterplan, posted by Maurits Verstraete at 18.03.20 (filed under:)
fig 687A section, posted by Cisse Vercauteren at 26.05.20 (filed under: concrete steel wood)
fig 687B section, posted by Cisse Vercauteren at 26.05.20 (filed under: concrete steel wood)
fig 687C section, posted by Cisse Vercauteren at 26.05.20 (filed under: concrete steel wood)
fig 229A proces_31, posted by Beatriz Fernandez at 26.07.17 (filed under: concrete)
fig 3A drawing, Voorhaven Site, posted by Stan Guldemont at 28.02.17 (filed under: steel)
fig 3B photo, Voorhaven Site, posted by Stan Guldemont at 28.02.17 (filed under: steel)
fig 3C drawing, Voorhaven Site, posted by Stan Guldemont at 28.02.17 (filed under: steel)
fig 668A Plan 1 terminal, posted by Marie-lou Vermaerke at 26.05.20 (filed under: brick steel)
fig 88A MODEL #4, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel wood)
fig 26A photo, Lumat Site Gent, posted by Lawrence Schietgat at 15.03.17 (filed under: steel)
fig 26B photo, Lumat Site Gent, posted by Lawrence Schietgat at 15.03.17 (filed under: steel)
fig 26C photo, Lumat Site Gent, posted by Lawrence Schietgat at 15.03.17 (filed under: steel)
fig 728A Vynckier Site Masterplan, posted by Lode De Smet Van Damme at 27.05.20 (filed under:)
fig 275A Ceiling Infrastructure plan, posted by Maxim Lefebvre at 07.03.18 (filed under: concrete glass steel)
fig 468A Collage Rules, posted by Cedric Du Bois at 06.03.19 (filed under:)
fig 535A The Smithsons’ New Brutalism, posted by linde huygens at 21.02.20 (filed under: brick concrete glass steel)
fig 535B The Smithsons’ New Brutalism, posted by linde huygens at 21.02.20 (filed under: brick concrete glass steel)
fig 626A Masterplan level 1, posted by Nicolas Vanneste at 22.04.20 (filed under:)
fig 538A photo, Palais d’Iéna, Paris – Auguste Perret, posted by Fien Dequeker at 23.02.20 (filed under: concrete)
fig 334A WERKMAQUETTE_3.1, posted by Louis Lories at 22.04.18 (filed under:)
fig 334B WERKMAQUETTE_3.1, posted by Louis Lories at 22.04.18 (filed under:)
fig 395A model, Final scale model, posted by Sven de Smet at 03.06.18 (filed under: concrete glass steel wood)
fig 683A 27/05, posted by Wout Vandermeersch at 26.05.20 (filed under: concrete)
fig 683B 27/05, posted by Wout Vandermeersch at 26.05.20 (filed under: concrete)
fig 683C 27/05, posted by Wout Vandermeersch at 26.05.20 (filed under: concrete)
fig 683D drawing, 27/05, posted by Wout Vandermeersch at 26.05.20 (filed under: concrete)
fig 205A meetings, posted by Floris De Bruyn at 26.07.17 (filed under: concrete)
fig 521A drawing, Kimbell Art Center, posted by Jolien De Smet at 19.02.20 (filed under: concrete)
fig 521B Kimbell Art Center, posted by Jolien De Smet at 19.02.20 (filed under: concrete)
fig 284A werfbezoek – kraan in liftschacht, posted by Sophie Leemans at 13.03.18 (filed under: concrete steel)
fig 729A Vynckier Circle, posted by Maurits Verstraete at 27.05.20 (filed under: brick concrete wood)
fig 729B Vynckier Circle, posted by Maurits Verstraete at 27.05.20 (filed under: brick concrete wood)
fig 729C Vynckier Circle, posted by Maurits Verstraete at 27.05.20 (filed under: brick concrete wood)
fig 47A drawing, Every Big Box has its structure, posted by Anton Parys at 24.05.17 (filed under: steel)
fig 47B drawing, Every Big Box has its structure, posted by Anton Parys at 24.05.17 (filed under: steel)
fig 165A analysing site Gents Bakkershuis, posted by Hannes Mol at 31.05.17 (filed under: brick concrete)
fig 218A drawing, proces_18, posted by Axel Fangueiro at 26.07.17 (filed under: brick)
fig 331A REFERENTIE_1, posted by Louis Lories at 22.04.18 (filed under: concrete)
fig 82A model, Analysis structure “De Porre”, posted by Deborah Dumarey at 24.05.17 (filed under: concrete)
fig 82B Analysis structure “De Porre”, posted by Deborah Dumarey at 24.05.17 (filed under: concrete)
fig 82C Analysis structure “De Porre”, posted by Deborah Dumarey at 24.05.17 (filed under: concrete)
fig 756A photo, Vynckier 2, posted by Jolien De Smet at 27.05.20 (filed under:)
fig 391A Is It a Niemeyer?, posted by Laura Vanderdonckt at 03.06.18 (filed under: concrete steel wood)
fig 391B Is It a Niemeyer?, posted by Laura Vanderdonckt at 03.06.18 (filed under: concrete steel wood)
fig 551A Parkeergebouw Ledeberg, posted by Bert Van Wijnendaele at 27.02.20 (filed under: concrete steel)
fig 713A photo, Vynckier, posted by Jolien De Smet at 27.05.20 (filed under:)
fig 571A photo, WATER TOWER, posted by Jolien De Smet at 11.03.20 (filed under:)
fig 571B photo, WATER TOWER, posted by Jolien De Smet at 11.03.20 (filed under:)
fig 277A Steel connections WTC +24, posted by Mattias Vandenbempt at 10.03.18 (filed under: steel)
fig 277B Steel connections WTC +24, posted by Mattias Vandenbempt at 10.03.18 (filed under: steel)
fig 277C Steel connections WTC +24, posted by Mattias Vandenbempt at 10.03.18 (filed under: steel)
fig 277D Steel connections WTC +24, posted by Mattias Vandenbempt at 10.03.18 (filed under: steel)
fig 155A drawing, ISO, posted by Manon Coppens at 31.05.17 (filed under: brick concrete steel wood)
fig 264A Manhattan project, posted by Mattias Vandenbempt at 06.03.18 (filed under: steel)
fig 264B Manhattan project, posted by Mattias Vandenbempt at 06.03.18 (filed under: steel)
fig 264C Manhattan project, posted by Mattias Vandenbempt at 06.03.18 (filed under: steel)
fig 19A photo, SUPPORTING FACADE STRUCTURE, posted by Floris De Bruyn at 15.03.17 (filed under: steel)
fig 329A WERKMAQUETTE_1-2, posted by Louis Lories at 22.04.18 (filed under:)
fig 329B WERKMAQUETTE_1-2, posted by Louis Lories at 22.04.18 (filed under:)
fig 167A photo, WORK – tussen, posted by Manon Coppens at 31.05.17 (filed under: steel)
fig 167B WORK – tussen, posted by Manon Coppens at 31.05.17 (filed under: steel)
fig 162A REFERENCE – ALDO VAN EYCK SONSBEEK PAVILJOEN, posted by Manon Coppens at 31.05.17 (filed under: brick)
fig 746A photo, Jubileumlaan, posted by Astrid Christiaens at 27.05.20 (filed under:)
fig 514A model, END MODEL, posted by Hanlin Li at 11.06.19 (filed under: concrete wood)
fig 514B model, END MODEL, posted by Hanlin Li at 11.06.19 (filed under: concrete wood)
fig 514C model, END MODEL, posted by Hanlin Li at 11.06.19 (filed under: concrete wood)
fig 637A shed structure, posted by Maurits Verstraete at 29.04.20 (filed under: brick concrete steel)
fig 637B shed structure, posted by Maurits Verstraete at 29.04.20 (filed under: brick concrete steel)
fig 429A FINAL Model WTC, posted by Laura Vanderdonckt at 04.06.18 (filed under: brick concrete glass plastics steel wood)
fig 429B FINAL Model WTC, posted by Laura Vanderdonckt at 04.06.18 (filed under: brick concrete glass plastics steel wood)
fig 429C FINAL Model WTC, posted by Laura Vanderdonckt at 04.06.18 (filed under: brick concrete glass plastics steel wood)
fig 741A drawing, Manchester, posted by Astrid Christiaens at 27.05.20 (filed under:)
fig 741B drawing, Manchester, posted by Astrid Christiaens at 27.05.20 (filed under:)
fig 741C drawing, Manchester, posted by Astrid Christiaens at 27.05.20 (filed under:)
fig 741D drawing, Manchester, posted by Astrid Christiaens at 27.05.20 (filed under:)
fig 747A drawing, STADSPARK VYNCKIER/ DE SCHIJF, posted by Lara Winderickx at 27.05.20 (filed under: concrete steel wood)
fig 747B STADSPARK VYNCKIER/ DE SCHIJF, posted by Lara Winderickx at 27.05.20 (filed under: concrete steel wood)
fig 747C STADSPARK VYNCKIER/ DE SCHIJF, posted by Lara Winderickx at 27.05.20 (filed under: concrete steel wood)
fig 747D STADSPARK VYNCKIER/ DE SCHIJF, posted by Lara Winderickx at 27.05.20 (filed under: concrete steel wood)
fig 296A WTC sections, posted by Sophie Leemans at 19.03.18 (filed under: concrete steel)
fig 341A Axo concrete factory, posted by Sven de Smet at 23.04.18 (filed under: concrete)
fig 335A REFERENTIE_3, posted by Louis Lories at 22.04.18 (filed under: concrete)
fig 418A sfeer, posted by LindsayPrat at 04.06.18 (filed under: concrete)
fig 691A research existing structure, posted by Cisse Vercauteren at 26.05.20 (filed under: steel wood)
fig 463A bOb, posted by Floris De Bruyn at 04.03.19 (filed under:)
fig 463B bOb, posted by Floris De Bruyn at 04.03.19 (filed under:)
fig 463C bOb, posted by Floris De Bruyn at 04.03.19 (filed under:)
fig 463D bOb, posted by Floris De Bruyn at 04.03.19 (filed under:)
fig 438A Jury WTC, posted by Floris De Bruyn at 19.06.18 (filed under:)
fig 438B Jury WTC, posted by Floris De Bruyn at 19.06.18 (filed under:)
fig 438C Jury WTC, posted by Floris De Bruyn at 19.06.18 (filed under:)
fig 438D Jury WTC, posted by Floris De Bruyn at 19.06.18 (filed under:)
fig 46A drawing, masterplan site gentbrugge, posted by Emmanuelle Vanhaesendonck at 16.05.17 (filed under: wood)
fig 46B drawing, masterplan site gentbrugge, posted by Emmanuelle Vanhaesendonck at 16.05.17 (filed under: wood)
fig 46C photo, masterplan site gentbrugge, posted by Emmanuelle Vanhaesendonck at 16.05.17 (filed under: wood)
fig 720A axo existing structure, posted by Cisse Vercauteren at 27.05.20 (filed under: steel wood)
fig 80A drawing, Site analyse, posted by Jean-Louis Verstraete at 24.05.17 (filed under: steel)
fig 80B drawing, Site analyse, posted by Jean-Louis Verstraete at 24.05.17 (filed under: steel)
fig 80C drawing, Site analyse, posted by Jean-Louis Verstraete at 24.05.17 (filed under: steel)
fig 80D drawing, Site analyse, posted by Jean-Louis Verstraete at 24.05.17 (filed under: steel)
fig 397A drawing, Final plans, posted by Sven de Smet at 03.06.18 (filed under: concrete steel)
fig 355A WERKMAQUETTE_3.3_BUREN, posted by Louis Lories at 28.04.18 (filed under:)
fig 157A model masterplan, posted by Helen Van de Vloet at 31.05.17 (filed under: concrete glass plastics steel wood)
fig 4A photo, Hidden interior structure of the Tondelier sasholders, posted by Alexander Van den Spiegel at 01.03.17 (filed under: steel wood)
fig 4B photo, Hidden interior structure of the Tondelier sasholders, posted by Alexander Van den Spiegel at 01.03.17 (filed under: steel wood)
fig 4C photo, Hidden interior structure of the Tondelier sasholders, posted by Alexander Van den Spiegel at 01.03.17 (filed under: steel wood)
fig 4D photo, Hidden interior structure of the Tondelier sasholders, posted by Alexander Van den Spiegel at 01.03.17 (filed under: steel wood)
fig 252A Pillar Catalogue, posted by Elena Calafati at 30.08.17 (filed under: concrete steel)
fig 598A The Brewing Process, posted by Bert Van Wijnendaele at 24.03.20 (filed under:)
fig 717A structure proposition, posted by Cisse Vercauteren at 27.05.20 (filed under: concrete steel)
fig 717B structure proposition, posted by Cisse Vercauteren at 27.05.20 (filed under: concrete steel)
fig 717C structure proposition, posted by Cisse Vercauteren at 27.05.20 (filed under: concrete steel)
fig 617A werfbezoek, posted by Arne Ilsbroekx at 01.04.20 (filed under: concrete steel)
fig 593A masterplan, posted by Eva Roose at 20.03.20 (filed under:)
fig 124A photo, Construction clt, posted by Mathias Tack at 31.05.17 (filed under: wood)
fig 339A Detail of 1 Bligh Street, posted by Sven de Smet at 23.04.18 (filed under: glass steel)
fig 253A Working session, posted by Floris De Bruyn at 30.08.17 (filed under: concrete glass wood)
fig 622A drawing, Vynckier, posted by Wout Vandermeersch at 21.04.20 (filed under: steel)
fig 622B drawing, Vynckier, posted by Wout Vandermeersch at 21.04.20 (filed under: steel)
fig 622C drawing, Vynckier, posted by Wout Vandermeersch at 21.04.20 (filed under: steel)
fig 622D drawing, Vynckier, posted by Wout Vandermeersch at 21.04.20 (filed under: steel)
fig 48A model vs Spa reine, posted by Helen Van de Vloet at 24.05.17 (filed under: concrete steel wood)
fig 734A Primary Circles_Sections, posted by Emile Bouckaert at 27.05.20 (filed under: concrete)
fig 734B Primary Circles_Sections, posted by Emile Bouckaert at 27.05.20 (filed under: concrete)
fig 734C Primary Circles_Sections, posted by Emile Bouckaert at 27.05.20 (filed under: concrete)
fig 734D Primary Circles_Sections, posted by Emile Bouckaert at 27.05.20 (filed under: concrete)
fig 42A photo, Renovation factory Kotrijk, posted by Jean-Louis Verstraete at 15.03.17 (filed under: steel)
fig 42B photo, Renovation factory Kotrijk, posted by Jean-Louis Verstraete at 15.03.17 (filed under: steel)
fig 42C photo, Renovation factory Kotrijk, posted by Jean-Louis Verstraete at 15.03.17 (filed under: steel)
fig 42D photo, Renovation factory Kotrijk, posted by Jean-Louis Verstraete at 15.03.17 (filed under: steel)
fig 54A HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD, posted by Helen Van de Vloet at 24.05.17 (filed under: concrete steel)
fig 54B HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD, posted by Helen Van de Vloet at 24.05.17 (filed under: concrete steel)
fig 54C HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD, posted by Helen Van de Vloet at 24.05.17 (filed under: concrete steel)
fig 54D HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD, posted by Helen Van de Vloet at 24.05.17 (filed under: concrete steel)
fig 113A drawing, Site Ijzerweglaan, posted by Anton Parys at 30.05.17 (filed under: glass steel)
fig 113B photo, Site Ijzerweglaan, posted by Anton Parys at 30.05.17 (filed under: glass steel)