fig 81A, drawing, ANALYSE EXISTING STRUCTURES
fig 458A, Enclosed house
fig 436A, MAQUETTE_WTC_ONTWERP
fig 436B, MAQUETTE_WTC_ONTWERP
fig 436C, MAQUETTE_WTC_ONTWERP
fig 436D, MAQUETTE_WTC_ONTWERP
fig 393A, model, Cathedrale Communale
fig 393B, model, Cathedrale Communale
fig 393C, model, Cathedrale Communale
fig 393D, model, Cathedrale Communale
fig 132A, 4 Column House
fig 310A, Architecture Noordwijk
fig 310B, Architecture Noordwijk
fig 149A, Sketches
fig 149B, Sketches
fig 550A, Parkeergebouw Ledeberg, Nieuw Parkeergebouw Ledeberg
fig 256A, drawing, Structural core
fig 256B, drawing, Structural core
fig 24A, photo, Steel truss, center piece
fig 24B, photo, Steel truss, Beam and truss connection
fig 84A, photo, Study models, Model 1/25
fig 84B, photo, Study models, Model 1/25
fig 84C, photo, Study models, Model 1/25
fig 40A, photo, Schuur Gentbrugge – Site
fig 40B, photo, Schuur Gentbrugge – Site
fig 40C, photo, Schuur Gentbrugge – Site
fig 40D, drawing, Schuur Gentbrugge – Site
fig 409A, drawing, Sfeer
fig 409B, drawing, Sfeer
fig 409C, drawing, Sfeer
fig 596A, NIEUWE VYNCKIER
fig 466A, l’unionfaitlaforce
fig 597A, The Brewing Process
fig 527A, Analyse Allmannajuvet Zinc Mine Museum – Peter Zumthor, Allmannajuvet Zinc Mine Museum - Peter Zumthor
fig 56A, sketches container : Stacking;Connection
fig 56B, sketches container : Stacking;Connection
fig 56C, sketches container : Stacking;Connection
fig 56D, sketches container : Stacking;Connection
fig 843A, Becher Price
fig 323A, Werfbezoek
fig 323B, Werfbezoek
fig 323C, Werfbezoek
fig 323D, Werfbezoek
fig 139A, DT
fig 139B, DT
fig 370A, Section analysis of fermentation tank
fig 93A, TECHNICAL DETAILS, Technical detail on the guiding rails
fig 93B, TECHNICAL DETAILS, Technical detail on the connection between the steel structure & foundation
fig 585A, model, Proposal Masterplan Model
fig 762A, theory research Gottfried semper
fig 75A, model, Construction details of a car dealers garage, Joint of a column, primary and secondary roof beams.
fig 75B, drawing, Construction details of a car dealers garage, Joint of a column, primary and secondary roof beams.
fig 75C, drawing, Construction details of a car dealers garage, Connection of the structure of the two halls.
fig 437A, Jury WTC
fig 437B, Jury WTC
fig 437C, Jury WTC
fig 437D, Jury WTC
fig 610A, drawing, 01/04
fig 610B, drawing, 01/04
fig 610C, drawing, 01/04
fig 522A, Vynckier site bezoek
fig 359A, Detailing sketches
fig 19A, photo, SUPPORTING FACADE STRUCTURE, steel supporting structure
fig 726A, Vynckier Site Masterplan
fig 606A, Masterplan V2
fig 606B, Masterplan V2
fig 35A, drawing, Floor systems of bricks
fig 35B, drawing, Floor systems of bricks
fig 35C, drawing, Floor systems of bricks
fig 35D, model, Floor systems of bricks
fig 663A, drawing, 27/05
fig 663B, drawing, 27/05
fig 663C, model, 27/05
fig 663D, drawing, 27/05
fig 679A, Axonometrie primaire structuur
fig 679B, Axonometrie primaire structuur
fig 592A, masterplan
fig 187A, studio at carlos ramos’ pavillion
fig 524A, photo, Analyse Swiss Sound Box – Peter Zumthor, Swiss Sound Box - Peter Zumthor
fig 218A, drawing, proces_18
fig 94A, INDUSTRIAL CONSTRUCTION SITE, Prefab structure
fig 94B, INDUSTRIAL CONSTRUCTION SITE, Two truss crossing
fig 94C, INDUSTRIAL CONSTRUCTION SITE, Cross bracing of the structure
fig 598A, Masterplan Model 2
fig 506A, TOWER
fig 506B, TOWER
fig 506C, TOWER
fig 506D, TOWER
fig 518A, Column Peter Märkli
fig 199A, sketch
fig 795A, miro miro
fig 795B, miro miro
fig 320A, exploded toren
fig 7A, drawing, types of compound beam
fig 62A, container cut outs
fig 62B, container cut outs
fig 62C, container cut outs
fig 62D, container cut outs
fig 485A, Stut-opties
fig 560A, inplantingsmaquette, burst
fig 759A, photo, Eve Babitz playing chess with Marcel Duchamp, Pasadena 1963
fig 276A, Structure WTC 1 +3 & +24
fig 276B, Structure WTC 1 +3 & +24
fig 276C, Structure WTC 1 +3 & +24
fig 276D, Structure WTC 1 +3 & +24
fig 533A, Schets, demonteerbare structuur, Jean Prouvé
fig 399A, Brewery visit
fig 399B, Brewery visit
fig 788A, Mies van der Rohe – Farnsworth House
fig 34A, model, Lignatur floor/ roof element, Lignatur floor element - hollow core slab
fig 34B, model, Lignatur floor/ roof element, Lignatur floor element - Detail possibilties ducts
fig 167A, photo, WORK – tussen
fig 167B, WORK – tussen
fig 751A, photo, Vynckier 2, Principe, Maquette
fig 701A, Facades
fig 701B, Facades
fig 607A, drawing, English Garden – Lancelot Capability Brown
fig 337A, Ingang wtc via kern
fig 232A, proces_33
fig 190A, meetings
fig 612A, Masterplan 25/03 & 1/04 2020
fig 612B, Masterplan 25/03 & 1/04 2020
fig 612C, Masterplan 25/03 & 1/04 2020
fig 612D, Masterplan 25/03 & 1/04 2020
fig 632A, OFFICE – RTS Building
fig 632B, OFFICE – RTS Building
fig 278A, werfbezoek, SAMSUNG CSC
fig 481A, work in progress
fig 481B, work in progress
fig 723A, photo, Vynckier 2, Vynckier 2, Principe gevel- en dakopbouw
fig 206A, drawing, proces_01
fig 545A, Constructie detail werfbezoek
fig 303A, atelier
fig 811A, Haus ohne eigenschaften
fig 8A, photo, FRAC, Dunkerque by Lacaton & Vasal, Frontal Facade, showing the old building and new 'copy' next to each other
fig 8B, photo, FRAC, Dunkerque by Lacaton & Vasal
fig 8C, photo, FRAC, Dunkerque by Lacaton & Vasal, The beautiful transparency of the skin invites the outside world in and ceases to be distant as an art institution might be. The shell does only what it is meant to do, protect its core from the outer elements. The glass and steel myth was reinterpreted and altered with a plastic and steel frame.
fig 8D, photo, FRAC, Dunkerque by Lacaton & Vasal, Steel connection between the old and new building.
fig 253A, Working session
fig 639A, Masterplan model
fig 203A, sketch
fig 584A, Proposal Facade Vynckier site
fig 148A, Inversion of the field
fig 615A, Model of masterplan CONNECTING GRID 1.0
fig 121A, Pictures Model
fig 121B, Pictures Model
fig 733A, Primary Circles_structural system
fig 110A, drawing, Current structure analyse
fig 110B, drawing, Current structure analyse
fig 110C, Current structure analyse
fig 110D, Current structure analyse
fig 775A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 273A, References Prestige Towers
fig 140A, model making in the sun
fig 140B, model making in the sun
fig 671A, Aanzicht westgevel
fig 542A, Bambow bridge – Atelier Lai
fig 542B, Bambow bridge – Atelier Lai
fig 76A, Project Kievit
fig 76B, Project Kievit
fig 76C, Project Kievit
fig 76D, Project Kievit
fig 188A, porto class 17
fig 761A, expo Vynckier @ WTF
fig 761B, expo Vynckier @ WTF
fig 761C, expo Vynckier @ WTF
fig 761D, expo Vynckier @ WTF
fig 280A, werfbezoek – ultiem grid 740 x 740
fig 280B, werfbezoek – ultiem grid 740 x 740
fig 258A, model WTC
fig 455A, renovated structure
fig 621A, drawing, Vynckier
fig 621B, drawing, Vynckier
fig 621C, drawing, Vynckier
fig 621D, drawing, Vynckier
fig 259A, model detail
fig 465A, drawing, hopvandenbrandenstraat.
fig 557A, Vynckier
fig 557B, Vynckier
fig 513A, model, END MODEL
fig 513B, model, END MODEL
fig 513C, model, END MODEL
fig 507A, drawing, DAUWSTRAAT DETAILSECTION
fig 168A, Tempory billboard on tempory structure
fig 294A, Structure Niv +27 WTC
fig 445A, VERNACULAR
fig 573A, model, Masterplan Vynckiersite
fig 573B, model, Masterplan Vynckiersite
fig 438A, model, WTC remodel – final presentation
fig 438B, model, WTC remodel – final presentation
fig 438C, model, WTC remodel – final presentation
fig 438D, model, WTC remodel – final presentation
fig 386A, CATHEDRALE COMMUNALE
fig 22A, photo, factory Gentbrugge – Site, wooden beam pattern
fig 22B, drawing, factory Gentbrugge – Site
fig 22C, drawing, factory Gentbrugge – Site
fig 22D, drawing, factory Gentbrugge – Site, masonry
fig 417A, drawing, proces
fig 417B, proces
fig 237A, final axonometry
fig 366A, Bochten testen
fig 366B, Bochten testen
fig 366C, Bochten testen
fig 552A, Werf GENT
fig 452A, Collage Gilbert and Georges
fig 245A, model, Axel Fangueiro and Luna Fonseca
fig 95A, Tube and Coupler Scaffolds
fig 95B, Tube and Coupler Scaffolds
fig 95C, Tube and Coupler Scaffolds
fig 95D, Tube and Coupler Scaffolds
fig 275A, Ceiling Infrastructure plan
fig 781A, photo, Eames case study house 8, Eames case study house No.8, exterior
fig 781B, photo, Eames case study house 8, Eames case study house No. 8, Bare steel frame
fig 215A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 769A, Analyse Robert Venturi en Denise Scott Brown, Sainsbury Wing National Gallery
fig 769B, Analyse Robert Venturi en Denise Scott Brown, Sainsbury Wing National Gallery
fig 769C, Analyse Robert Venturi en Denise Scott Brown, Sainsbury Wing National Gallery
fig 361A, Structure between diving tank and WTC 2tower
fig 812A, Vliegtuigloods Grimbergen
fig 492A, test materiality – housing tower
fig 408A, drawing, open apartment
fig 217A, drawing, proces_17
fig 720A, photo, Vynckier 2, Vynckier 2, Principe 'bloembakken'
fig 330A, CONCEPTBEELD_1
fig 499A, photo, Huisartsenpraktijk
fig 55A, section draft
fig 204A, meetings, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 196A, AXONOMETRIC
fig 678A, model, Dwarse snede woning
fig 198A, sketch
fig 451A, Repitition
fig 609A, drawing, Vynckier
fig 609B, model, Vynckier
fig 609C, drawing, Vynckier
fig 599A, Masterplan 25/03
fig 841A, drawing, Facq building, concrete detail with BSF-connection
fig 326A, WTC model progress week 8
fig 638A, circular building
fig 638B, circular building
fig 538A, Rudolf Olgiati Column
fig 509A, Final maquette
fig 509B, Final maquette
fig 509C, photo, Final maquette
fig 457A, depotdesign
fig 343A, Open structure + circulation
fig 564A, drawing, Plan floor level (+0) of building 4 and 4A, Vynckier site
fig 630A, fake Mies
fig 630B, fake Mies
fig 577A, Digital masterplan, scale 1/1000
fig 178A, model, Final model, B, 1:50
fig 460A, Marc-Antoine Laugier ‘Essay on Architecture’
fig 460B, Marc-Antoine Laugier ‘Essay on Architecture’
fig 536A, photo, Rue Franklin 25bis, Paris – Auguste Perret
fig 127A, model, Final
fig 127B, drawing, Final
fig 127C, drawing, Final
fig 803A, Facade, office vs storage, Kleimoer, Office vs Storage
fig 782A, photo, Eames Case Study House 8
fig 601A, Proposal masterplan Vynckier site
fig 415A, omgeving analyse
fig 415B, drawing, omgeving analyse
fig 415C, drawing, omgeving analyse
fig 415D, drawing, omgeving analyse
fig 240A, drawing, axonometry Marta and Luciana
fig 820A, photo, A. Mangiarotti
fig 820B, photo, A. Mangiarotti
fig 820C, A. Mangiarotti
fig 820D, drawing, A. Mangiarotti
fig 806A, photo, storage for granulates, next to concrete plant, facade
fig 806B, drawing, storage for granulates, next to concrete plant, section
fig 106A, drawing, SITE
fig 106B, drawing, SITE
fig 496A, roof structure
fig 434A, FINAL MODEL – JURY
fig 434B, FINAL MODEL – JURY
fig 434C, FINAL MODEL – JURY
fig 434D, FINAL MODEL – JURY
fig 181A, final drawings
fig 181B, drawing, final drawings
fig 266A, WTC Massive Model
fig 846A, Bernd and Hilla Becher
fig 65A, test model: terraces &facade
fig 313A, Experience the real stuff
fig 313B, Experience the real stuff
fig 313C, Experience the real stuff
fig 581A, Mosterdfabriek Oudenaarde
fig 647A, The Nantes Saint-Nazaire Higher School of Fine Arts
fig 159A, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159B, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159C, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159D, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 66A, photo, Test Model – Drawing
fig 799A, bOb van Reeth, House Van Roosmalen, design sketch
fig 392A, Cathedrale Communale
fig 392B, Cathedrale Communale
fig 392C, Cathedrale Communale
fig 392D, Cathedrale Communale
fig 165A, analysing site Gents Bakkershuis
fig 316A, Notre Dame
fig 443A, Visible structure
fig 432A, model, jury WTC
fig 432B, model, jury WTC
fig 432C, model, jury WTC
fig 129A, Pictures site Nieuwevaart
fig 129B, Pictures site Nieuwevaart
fig 725A, Vynckier Site Saw-tooth roof
fig 725B, Vynckier Site Saw-tooth roof
fig 725C, Vynckier Site Saw-tooth roof
fig 725D, Vynckier Site Saw-tooth roof
fig 800A, drawing, bOb Van Reeth, Circle vs Square, The basic operation in the design is playing the circle and parts of the circle off against the equality, the peace and quiet, and the infinite expandability and divisibility of the square and the grid. Because every square is otherwise perfectly divisible and fits in without a different figure ever being created. A square certainly does centre but at thesame time the four sides decentre and orient, the sides are just as strong as the cenre. A circle on the other hand radiates but centres to a much greater degree, detaches itself, and never shares its borderline with a second circle. It is enough to draw a circle in or around a square, or to construct a circle from an angle of a square, to obtain a dynamic heterogenous division of the plane with centred and non centred, single and complex planes, regular primary figures and secondary spaces, insides and outsides, direction.
fig 523A, photo, Les Monseigneurs – Primary Talks
fig 523B, Les Monseigneurs – Primary Talks
fig 822A, Willemen Infra Asfaltcentrale Gent
fig 822B, Willemen Infra Asfaltcentrale Gent
fig 784A, Eames Case Study House 8, build sketch from Eames' Movie: House - after 5 years of living in it.
fig 346A, Site visite Orsi Academy
fig 346B, Site visite Orsi Academy
fig 346C, Site visite Orsi Academy
fig 346D, Site visite Orsi Academy
fig 823A, axo, STORAGE FOR GRANULATES, NEXT TO CONCRETE PLANT
fig 271A, Citygroup Center
fig 271B, Citygroup Center
fig 271C, Citygroup Center
fig 567A, Vynckier oude luchtfoto
fig 183A, Structural Analysis
fig 183B, Structural Analysis
fig 183C, Structural Analysis
fig 183D, Structural Analysis
fig 235A, model, Laia Bonet and Charlette Frémont
fig 748A, STADSPARK VYNCKIER/ DE SCHIJF
fig 358A, Overlaying Bamboo “hinge”
fig 494A, DETAIL – brick meets wood
fig 539A, ECAM – Agwa Architects
fig 539B, ECAM – Agwa Architects
fig 420A, concerthal akoestiek
fig 420B, model, concerthal akoestiek
fig 420C, drawing, concerthal akoestiek
fig 453A, collage de canal.brussels á la G&G
fig 478A, KANAL review KUL UCL ULB
fig 478B, KANAL review KUL UCL ULB
fig 478C, KANAL review KUL UCL ULB
fig 477A, Wachtstaven
fig 442A, mapping trough the lens of G&G
fig 404A, model, Cathedrale Communale 1/200
fig 404B, model, Cathedrale Communale 1/200
fig 404C, model, Cathedrale Communale 1/200
fig 404D, model, Cathedrale Communale 1/200
fig 503A, Section A110
fig 544A, Aansluiting staalframebouw
fig 833A, Analyse EL beton – total overvieuw
fig 695A, Axonometry of fragment CONNECTING GRID
fig 695B, Axonometry of fragment CONNECTING GRID
fig 78A, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78B, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78C, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78D, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 809A, Casa a tre cilindri
fig 260A, REA new ramp
fig 604A, Superstudio, Adolfo Natalini, Monumento Continuo, 1969
fig 732A, Primary Circles_Sections
fig 732B, Primary Circles_Sections
fig 732C, Primary Circles_Sections
fig 732D, Primary Circles_Sections
fig 41A, drawing, Steel structure
fig 41B, drawing, Steel structure
fig 41C, drawing, Steel structure
fig 41D, drawing, Steel structure
fig 54A, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54B, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54C, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54D, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 109A, photo, Japanese House, 1907, Wood construction by 'master carpenter' Nishida Isaburo
fig 344A, How to become a Niemeyer
fig 636A, shed structure
fig 636B, shed structure
fig 208A, drawing, proces_09
fig 214A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 251A, DEEP PLAN construction detail 1, structural detail 1
fig 608A, drawing, Vynckier
fig 608B, model, Vynckier
fig 608C, drawing, Vynckier
fig 850A, Hannelore Van Dijck – Primary Talks
fig 135A, model, Final model
fig 173A, model, model analyse
fig 224A, studio
fig 497A, A110 – 2M wide cohousing
fig 268A, Knights of Columbus
fig 268B, Knights of Columbus
fig 268C, Knights of Columbus
fig 832A, Facade Pattyn Factory
fig 832B, Facade Pattyn Factory
fig 429A, WTC remodel – a tower can have a lot of different plans
fig 429B, WTC remodel – a tower can have a lot of different plans
fig 429C, WTC remodel – a tower can have a lot of different plans
fig 429D, WTC remodel – a tower can have a lot of different plans
fig 520A, drawing, Kimbell Art Center
fig 520B, Kimbell Art Center
fig 30A, photo, Silos, tanks & holders, Bottom-up construction
fig 30B, photo, Silos, tanks & holders, Interior view
fig 30C, photo, Silos, tanks & holders, Assembling the topcover
fig 30D, photo, Silos, tanks & holders, Surreal image
fig 293A, Core WTC
fig 627A, model, De Schijf
fig 627B, model, De Schijf
fig 161A, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 161B, drawing, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 161C, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 161D, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 796A, Alfred Hardy
fig 796B, Alfred Hardy
fig 796C, Alfred Hardy
fig 796D, Alfred Hardy
fig 18A, photo, Wood Hollow Core Slab
fig 18B, photo, Wood Hollow Core Slab
fig 142A, Urban design
fig 142B, Urban design
fig 530A, Study of the capital
fig 314A, Conceptual thinking
fig 1A, drawing, STEEL JOINT
fig 547A, Manchester building – structure
fig 547B, Manchester building – structure
fig 797A, EL Beton – Structuur plan
fig 516A, Werfbeeld 51 Rue Raynouard – Perret
fig 768A, Palazzo della Ragione
fig 768B, Palazzo della Ragione
fig 291A, WTC I: Axo op 2 verdiepen
fig 689A, research existing structure
fig 20A, drawing, stabilizing structural systems, different ways to stabilize structure
fig 328A, Werf station parking
fig 328B, Werf station parking, plan ondergrondse parking
fig 328C, Werf station parking, wapening om 4 bogen op aan te sluiten, door een fout is het beton te hoog gegoten waardoor alles terug is uitgekapt. Hierdoor komt de wapening in het beton bloot te liggen.
fig 328D, Werf station parking, beton voor de Kiss&Ride wordt gegoten.
fig 515A, Structural analysis, AFASIA, P. FLammer
fig 660A, future for the fireplace
fig 755A, model, Vynckier 2, Principe, Inkom
fig 5A, photo, Concrete Structure, Concrete Grid Structure
fig 5B, photo, Concrete Structure, Concrete Skylight
fig 172A, drawing, Research new structures in combination with existing
fig 172B, drawing, Research new structures in combination with existing
fig 172C, drawing, Research new structures in combination with existing, acoustic solutions - new vs. existing (2)
fig 172D, drawing, Research new structures in combination with existing
fig 483A, detail – concrete & wood connection
fig 742A, drawing, axo Manchester and Tulou, axonometric drawing
fig 456A, George&Gilbert
fig 350A, How To Become A Niemeyer
fig 571A, Vynckier Site masterplan sketch
fig 817A, Beton model y-kolom
fig 817B, Beton model y-kolom
fig 817C, Beton model y-kolom
fig 482A, Werkmaquettes concept DAUWSTRAAT/PICARDSTRAAT, Processed with VSCO with preset
fig 482B, Werkmaquettes concept DAUWSTRAAT/PICARDSTRAAT, Processed with VSCO with preset
fig 301A, WTC Plan/Section Studentdorms
fig 384A, CATHEDRALE COMMUNALE_PLANS
fig 42A, photo, Renovation factory Kotrijk
fig 42B, photo, Renovation factory Kotrijk
fig 42C, photo, Renovation factory Kotrijk
fig 42D, photo, Renovation factory Kotrijk
fig 114A, drawing, Existing structure
fig 114B, drawing, Existing structure, Axo
fig 114C, drawing, Existing structure, Section
fig 114D, photo, Existing structure
fig 383A, WTC EXISTING STRUCTURE
fig 300A, Basiliek van Koekelberg
fig 300B, Basiliek van Koekelberg
fig 9A, photo, Getting some help, Getting some help.
fig 603A, drawing, voorstellen inplanting
fig 603B, voorstellen inplanting
fig 435A, finaal model
fig 435B, finaal model
fig 435C, finaal model
fig 398A, drawing, Isometrie gevel
fig 745A, drawing, STADSPARK VYNCKIER/ DE SCHIJF
fig 745B, STADSPARK VYNCKIER/ DE SCHIJF
fig 745C, STADSPARK VYNCKIER/ DE SCHIJF
fig 745D, STADSPARK VYNCKIER/ DE SCHIJF
fig 614A, drawing, Section connection Manchester and CONNECTING GRID 1.0
fig 351A, WERKMAQUETTE_PLINT
fig 787A, Detail – Lake Short Drive – Mies VDR
fig 703A, De Nieuwe Vynckier – Incubator – Section
fig 448A, photo, Gilbert & George
fig 10A, drawing, CORRUGATED WEB BEAM, Production GLP Beam
fig 10B, photo, CORRUGATED WEB BEAM, Connection GLP to GLP
fig 10C, photo, CORRUGATED WEB BEAM, Connection GLP to column
fig 10D, photo, CORRUGATED WEB BEAM, Example project
fig 644A, PALACE OF LABOUR, TURIN, 1961
fig 548A, Jun Igarashi – Hat H house
fig 45A, drawing, shipping container
fig 45B, drawing, shipping container
fig 45C, drawing, shipping container
fig 254A, The ramp
fig 254B, The ramp
fig 254C, The ramp
fig 430A, drawing, WTC remodel – section and facades
fig 430B, drawing, WTC remodel – section and facades
fig 430C, drawing, WTC remodel – section and facades
fig 430D, WTC remodel – section and facades
fig 335A, REFERENTIE_3
fig 650A, Building with shed structure
fig 629A, Vynckier 2
fig 699A, 1 UNIT
fig 699B, 1 UNIT
fig 595A, drawing, 25/03
fig 595B, drawing, 25/03
fig 595C, model, 25/03
fig 835A, drawing, ISO_Facq
fig 789A, Mies van der Rohe – Kruiskolom
fig 625A, Masterplan level 1
fig 394A, model, Cathedrale Communale
fig 394B, model, Cathedrale Communale
fig 394C, model, Cathedrale Communale
fig 394D, model, Cathedrale Communale
fig 819A, photo, Autographe, Teamwork with Jill Gielen.
fig 838A, drawing, section detail structure
fig 588A, Masterplan Proposal
fig 511A, photo, A. Lavalléestraat
fig 511B, photo, A. Lavalléestraat
fig 511C, A. Lavalléestraat
fig 511D, photo, A. Lavalléestraat
fig 92A, MODEL #2, Cross-section model of the gasholder
fig 92B, MODEL #2, Cross-section model of the gasholder
fig 92C, MODEL #2, Cross-section model of the gasholder
fig 186A, Model
fig 186B, Model
fig 186C, Model
fig 837A, model, foto maquette
fig 444A, George&Gilbert
fig 400A, drawing, New vs old structure, steel vs concrete
fig 16A, photo, SITE VISIT, The large wooden beams ready to be installed.
fig 16B, photo, SITE VISIT, Prefabricated elements are fixed on the columns.
fig 16C, photo, SITE VISIT, Steel elements where the secondary wooden beams will be fixed on.
fig 16D, photo, SITE VISIT, The building of the extension of the store of Aveve.
fig 475A, work in progress
fig 475B, work in progress
fig 249A, photo, working session
fig 579A, Vynckier 5
fig 340A, Manitoba hydro place
fig 177A, Final model
fig 177B, Final model, C
fig 367A, Opwervendag Nemo link
fig 367B, Opwervendag Nemo link
fig 367C, Opwervendag Nemo link
fig 367D, Opwervendag Nemo link
fig 687A, facades
fig 687B, facades
fig 687C, facades
fig 687D, facades
fig 605A, stay safe
fig 422A, reference
fig 422B, reference
fig 422C, reference, construction
fig 331A, REFERENTIE_1
fig 681A, 27/05
fig 681B, 27/05
fig 681C, 27/05
fig 681D, drawing, 27/05
fig 248A, photo, exploring the deep plan
fig 654A, drawing parochiezaal
fig 728A, stil leven de werf
fig 728B, stil leven de werf
fig 728C, stil leven de werf
fig 728D, stil leven de werf
fig 474A, FUNDERING
fig 510A, model, DAUWSTRAAT MODEL
fig 510B, DAUWSTRAAT MODEL
fig 510C, DAUWSTRAAT MODEL
fig 510D, DAUWSTRAAT MODEL
fig 744A, photo, Jubileumlaan, construction soilmixwall
fig 738A, Vynckier site, model
fig 112A, photo, Hans Chr. Hansen, Amager Koblingsstation, Facade detail
fig 112B, photo, Hans Chr. Hansen, Amager Koblingsstation
fig 112C, photo, Hans Chr. Hansen, Amager Koblingsstation
fig 60A, photo, SIMPLE CONSTRUCTION
fig 60B, SIMPLE CONSTRUCTION
fig 60C, SIMPLE CONSTRUCTION
fig 368A, Structural model WTC brewery
fig 368B, Structural model WTC brewery
fig 252A, Pillar Catalogue
fig 332A, WERKMAQUETTE_3.0
fig 246A, Axonometria
fig 6A, drawing, Drawing connection of steel structure
fig 6B, drawing, Drawing connection of steel structure
fig 487A, Structure LaVallée
fig 53A, visit construction site
fig 53B, visit construction site
fig 53C, visit construction site
fig 829A, Structure Pattyn Factory
fig 28A, photo, Industrial warehouse, connection between foundation and column
fig 28B, photo, Industrial warehouse, connection between column and beam
fig 28C, photo, Industrial warehouse
fig 28D, photo, Industrial warehouse, connection between beams
fig 472A, volumestudie
fig 651A, Building shed structure axonometric
fig 828A, photo, Visit Building Nachtergaele, back facade, Steel, old and new, renovation
fig 828B, photo, Visit Building Nachtergaele, Canopy, conncection, structure, wood, steel, detail
fig 828C, photo, Visit Building Nachtergaele, Montage, original plans
fig 828D, photo, Visit Building Nachtergaele, Facade, floor, conncetion, 3D, lost form, steel, concrete
fig 321A, plan woning
fig 242A, axonometric alejandra and joao
fig 234A, model, João Branco and Alejandra Calvo
fig 662A, working in quarantaine
fig 593A, Masterplan Vynckiersite Gent
fig 593B, Masterplan Vynckiersite Gent
fig 593C, Masterplan Vynckiersite Gent
fig 255A, WTC pillar dimensions
fig 72A, drawing, Structure of the big warehouse on docks site
fig 555A, Section Store Shed
fig 21A, photo, Tram depot Marconi – site visit
fig 21B, photo, Tram depot Marconi – site visit
fig 21C, photo, Tram depot Marconi – site visit
fig 468A, belibel
fig 349A, Scheme structures silo
fig 349B, Scheme structures silo
fig 500A, photo, Tandartsenpraktijk
fig 731A, model, Project, The Modern Tulou
fig 731B, model, Project, The Modern Tulou
fig 731C, model, Project, The Modern Tulou
fig 731D, model, Project, The Modern Tulou
fig 685A, section
fig 685B, section
fig 685C, section
fig 565A, Photo of of interior staircase at building 4, Vynckier site
fig 729A, Vynckier Saw Shedroof
fig 729B, Vynckier Saw Shedroof
fig 729C, Vynckier Saw Shedroof
fig 572A, Masterplan
fig 710A, photo, Vynckier, Masterplan, Maquette
fig 3A, drawing, Voorhaven Site, The column is constructed with leftovers from the world expo in Antwerp 1985
fig 3B, photo, Voorhaven Site
fig 3C, drawing, Voorhaven Site, how hot riveting is done.
fig 90A, Connection of a steel beam to a concrete wall
fig 90B, Connection of a steel beam to a concrete wall
fig 108A, photo, Gent Voorhaven PortService Warehouses, Large Warehouse facades
fig 108B, photo, Gent Voorhaven PortService Warehouses, small warehouse
fig 108C, photo, Gent Voorhaven PortService Warehouses, Bombed structure inside
fig 108D, photo, Gent Voorhaven PortService Warehouses, Bombed structure old warehouses
fig 421A, waffle slab
fig 421B, waffle slab
fig 362A, Bamboo exoskeleton stairs , Vertical garden
fig 362B, Bamboo exoskeleton stairs , Vertical garden
fig 834A, Analyse EL beton – Detail dakspant 1
fig 669A, Masterplan Vynckier
fig 807A, Briona 72
fig 390A, CATHEDRALE COMMUNALE_PERSPECTIVE
fig 488A, Structure Beekstraat
fig 339A, Detail of 1 Bligh Street
fig 299A, WTC – plan section
fig 691A, Modelshots CONNECTING GRID
fig 691B, Modelshots CONNECTING GRID
fig 691C, model, Modelshots CONNECTING GRID
fig 691D, Modelshots CONNECTING GRID
fig 712A, photo, Vynckier, Masterplan, Zicht op plein
fig 459A, Enclosed house
fig 292A, WTC NIV + 27
fig 649A, New Shed structure
fig 649B, New Shed structure
fig 221A, model, work in progress
fig 169A, research / site model
fig 169B, research / site model
fig 169C, research / site model
fig 61A, roof on/between containers
fig 61B, roof on/between containers
fig 61C, roof on/between containers
fig 61D, roof on/between containers
fig 785A, drawing, Eames Case Study House 8, Axo deciphering the different constuctive elements inside the Eames House.
fig 574A, les 18/03
fig 574B, drawing, les 18/03
fig 574C, drawing, les 18/03
fig 735A, Primary Circles_Detailed section
fig 617A, werfbezoek
fig 777A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 767A, Analyse Robert Venturi en Denise Scott Brown, Big Donut Drive-in
fig 709A, photo, Vynckier, Masterplan, Structuur site
fig 737A, Primaru Circles_photos
fig 360A, Structure underneath diving tank
fig 67A, College Football Hall of Fame, Robert Venturi & Denise Scott Brown
fig 67B, College Football Hall of Fame, Robert Venturi & Denise Scott Brown
fig 47A, drawing, Every Big Box has its structure
fig 47B, drawing, Every Big Box has its structure
fig 840A, drawing, Facq building, primary & secondary structure
fig 211A, proces_12
fig 562A, Section Vynckier Machinekamer
fig 2A, photo, ‘De Nobele’ – Site, Alongside the structure there's a workspace for a local artist.
fig 2B, photo, ‘De Nobele’ – Site, The unfinished upper part of the old textile factory.
fig 2C, photo, ‘De Nobele’ – Site, Detail of a main concrete column.
fig 2D, ‘De Nobele’ – Site, Analysis on which structure stays and which one disappears.
fig 356A, Notre-Dame in BXL?
fig 580A, model, Masterplan Vynckier
fig 673A, model, Schijf x Manchester
fig 673B, Schijf x Manchester
fig 673C, Schijf x Manchester
fig 673D, Schijf x Manchester
fig 284A, werfbezoek – kraan in liftschacht
fig 100A, Steel Prefab Structure, construction site
fig 100B, Steel Prefab Structure, steel components joint
fig 100C, Steel Prefab Structure, steel components ridge joint
fig 100D, Steel Prefab Structure, steel components joint
fig 690A, Model Manchester
fig 690B, Model Manchester
fig 690C, Model Manchester
fig 690D, Model Manchester
fig 379A, Model structure
fig 418A, sfeer
fig 824A, Fotoreportage context
fig 17A, photo, SITE VISIT °2, On top you can see the combination of the concrete columns with the steel trusses.
fig 17B, photo, SITE VISIT °2, Prefabricated concrete elements fits perfectly in each other.
fig 17C, photo, SITE VISIT °2, The holes in the beams are made to put ducts through them.
fig 17D, photo, SITE VISIT °2, Prefabricated concrete elements fits perfectly in each other.
fig 696A, Axonometries CONNECTING GRID
fig 696B, Axonometries CONNECTING GRID
fig 269A, Shanghai Tower
fig 105A, WASSERIJ DER VLAANDEREN
fig 105B, WASSERIJ DER VLAANDEREN
fig 105C, WASSERIJ DER VLAANDEREN
fig 105D, WASSERIJ DER VLAANDEREN
fig 535A, drawing, Magney House – Glenn Murcutt – section
fig 535B, drawing, Magney House – Glenn Murcutt – section
fig 13A, photo, Arrival_Tower
fig 836A, photo, BERND AND HILLA BECHER FACQ
fig 801A, bOb van Reeth, House Botte
fig 779A, The Cube
fig 23A, photo, Poco Loco – Fully automatic warehouse, View from the street
fig 23B, photo, Poco Loco – Fully automatic warehouse, section build on the ground
fig 23C, photo, Poco Loco – Fully automatic warehouse, connection of 2 different sections
fig 23D, photo, Poco Loco – Fully automatic warehouse, reinforcement for windloads
fig 519A, Marika-Alderton House – Glenn Murcutt
fig 192A, sketch
fig 189A, MAIN PLAN
fig 479A, Review Primary structure – Kanal Brussels, Processed with VSCO with m5 preset
fig 210A, drawing, proces_11
fig 504A, Axonometric NG17
fig 656A, accordeon raam detail
fig 813A, Ruff Collage | Admisol, Toonzaal + woning | Luc Van Landuyt | 1978
fig 471A, photo, workshop
fig 471B, workshop
fig 307A, STRUCTURE WTC
fig 307B, STRUCTURE WTC
fig 566A, In het spoor van Serafinus
fig 406A, drawing, SECTION_BREWERY_AA’
fig 29A, model, STEKO – Building Blocks, The basic elements of the STEKO® building system
fig 29B, photo, STEKO – Building Blocks
fig 29C, photo, STEKO – Building Blocks
fig 144A, structural options. Isolating a container outside
fig 144B, structural options. Isolating a container outside
fig 727A, Vynckier Circle
fig 727B, Vynckier Circle
fig 727C, Vynckier Circle
fig 82A, model, Analysis structure “De Porre”, Part of structure with cantilever
fig 82B, Analysis structure “De Porre”, Part of structure with cantilever - top
fig 82C, Analysis structure “De Porre”, Part of structure with cantilever
fig 123A, New structures
fig 158A, Model of the Site, The final position of the new added buildings.
fig 158B, Model of the Site, Model without any of the existing structures.
fig 381A, Final design: looking inside the model
fig 381B, Final design: looking inside the model
fig 83A, drawing, SITE ANALYSE
fig 83B, drawing, SITE ANALYSE
fig 83C, drawing, SITE ANALYSE
fig 131A, Blekerijstraat site photos
fig 131B, Blekerijstraat site photos
fig 131C, Blekerijstraat site photos
fig 131D, Blekerijstraat site photos
fig 718A, axo existing structure
fig 174A, drawing, current structure analyse
fig 808A, Briona 72
fig 746A, STADSPARK VYNCKIER/ DE SCHIJF
fig 746B, STADSPARK VYNCKIER/ DE SCHIJF
fig 746C, STADSPARK VYNCKIER/ DE SCHIJF
fig 746D, STADSPARK VYNCKIER/ DE SCHIJF
fig 842A, BSF-Connection
fig 125A, Site visit
fig 247A, WTC pattern of the pillars
fig 815A, o n l i n e
fig 147A, model, ‘HUIDEVETTERKEN’ werkmaquette
fig 147B, drawing, ‘HUIDEVETTERKEN’ werkmaquette, existing situation plan
fig 147C, model, ‘HUIDEVETTERKEN’ werkmaquette
fig 563A, Front façade and back façade of building 4 and 4A, Vynckier site
fig 473A, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 473B, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 473C, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 133A, photo, Final urban model
fig 133B, Final urban model
fig 133C, model, Final urban model
fig 486A, model, Model housing tower
fig 115A, photo, Site visit
fig 115B, photo, Site visit
fig 115C, photo, Site visit
fig 115D, photo, Site visit
fig 508A, drawing, PICARDSTRAAT DETAILSECTION
fig 613A, drawing, Masterplan CONNECTING GRID 1.0, scale 1/1000
fig 756A, ontwerpschetsen
fig 756B, ontwerpschetsen
fig 756C, ontwerpschetsen
fig 756D, ontwerpschetsen
fig 205A, meetings, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 12A, photo, Industrial Structure
fig 12B, photo, Industrial Structure
fig 780A, photo, Thomas Ruff Collages, Autographe, Wavre,Teamwork with Jill Gielen.
fig 780B, photo, Thomas Ruff Collages, Mopac, Lommel,Teamwork with Jill Gielen.
fig 780C, photo, Thomas Ruff Collages, Stukwerkers, Gent,Teamwork with Jill Gielen.
fig 526A, ANALYSE Steilneset Memorial – PETER ZUMTHOR, Steilneset Memorial - Peter Zumthor
fig 397A, drawing, Final plans
fig 77A, Concrete building elements
fig 77B, Concrete building elements
fig 77C, Concrete building elements
fig 77D, Concrete building elements
fig 528A, drawing, Sketch of Art & Architecture Building
fig 490A, detail – wood & wood connection
fig 490B, detail – wood & wood connection
fig 490C, detail – wood & wood connection
fig 220A, drawing, proces_20
fig 463A, Structure, Libelco
fig 463B, Structure, Libelco
fig 749A, STADSPARK VYNCKIER/ DE SCHIJF
fig 749B, STADSPARK VYNCKIER/ DE SCHIJF
fig 749C, STADSPARK VYNCKIER/ DE SCHIJF
fig 749D, STADSPARK VYNCKIER/ DE SCHIJF
fig 120A, Reference structure steel
fig 120B, Reference structure steel
fig 120C, Reference structure steel
fig 525A, Photo during construction – Healey Guest House – ‘Cocoon House’
fig 141A, Site visit Sint-Martens-Latem
fig 141B, Site visit Sint-Martens-Latem
fig 141C, Site visit Sint-Martens-Latem
fig 141D, Site visit Sint-Martens-Latem
fig 413A, analyse plint
fig 413B, analyse plint
fig 413C, drawing, analyse plint
fig 413D, analyse plint
fig 341A, Axo concrete factory
fig 786A, SUPERSTUDIO quaderna console tables for zanotta 1971
fig 270A, Willis Tower
fig 270B, Willis Tower
fig 619A, lecture atelier Haegheman Temmerman
fig 590A, Vynckier Site, first proposal, sketches
fig 805A, Granulate Storage Shed, Axo
fig 464A, Tree Tops 2.0
fig 493A, drawing, Betonnen wafelstructuur
fig 790A, Mies van der Rohe – Crown Hall – Isometrie
fig 228A, proces_30
fig 50A, drawing, OLD vs. NEW
fig 667A, Plan 1 terminal
fig 117A, model, Test model of 19 04 2017
fig 117B, model, Test model of 19 04 2017
fig 117C, model, Test model of 19 04 2017
fig 85A, photo, Analysis of the site, structure, detail, 2D build-up of steel truss
fig 85B, photo, Analysis of the site, structure, detail, isometric
fig 85C, photo, Analysis of the site, structure, detail, isometric
fig 85D, photo, Analysis of the site, structure, detail, isometric
fig 641A, Staal-beton kolom
fig 641B, Staal-beton kolom
fig 747A, STADSPARK VYNCKIER/ DE SCHIJF
fig 747B, STADSPARK VYNCKIER/ DE SCHIJF
fig 747C, STADSPARK VYNCKIER/ DE SCHIJF
fig 537A, photo, Palais d’Iéna, Paris – Auguste Perret
fig 616A, werfbezoek
fig 194A, meetings
fig 342A, Drawing of concrete silo
fig 282A, werfbezoek – zettingsvoegen
fig 714A, photo, Vynckier 2, Vynckier 2, Structuur, Grid Vynckier 1
fig 272A, Zuidertoren
fig 272B, Zuidertoren
fig 272C, Zuidertoren
fig 672A, drawing, Masterplan
fig 501A, Housing tower – AXO
fig 375A, WERKMAQUETTE_4.1
fig 134A, model, Structure models
fig 324A, werfbezoek
fig 324B, werfbezoek
fig 324C, werfbezoek
fig 327A, WTC – model
fig 327B, WTC – model
fig 844A, ambiguous prouvé
fig 151A, photo, Site ‘Huidevetterken’, L-profile column
fig 151B, photo, Site ‘Huidevetterken’, Steel detail
fig 783A, photo, Eames Case Study House 8, Interior steel Truss, aesthetics of prefab
fig 163A, Proces
fig 163B, drawing, Proces, detail exploded view
fig 163C, Proces
fig 163D, Proces
fig 816A, Detail betonnen loods Ieper
fig 816B, Detail betonnen loods Ieper
fig 529A, drawing, Section of Art & Architecture Building
fig 643A, Masterplan
fig 618A, photo, SCHETSEN 1/04
fig 618B, SCHETSEN 1/04
fig 618C, photo, SCHETSEN 1/04
fig 618D, drawing, SCHETSEN 1/04
fig 154A, HAMAM – 17.04
fig 154B, HAMAM – 17.04
fig 739A, drawing, Manchester, concept apartments and stores
fig 739B, drawing, Manchester, concept structure
fig 739C, drawing, Manchester, concept offices
fig 739D, drawing, Manchester, entrance
fig 433A, CATHEDRALE COMMUNALE_JURY
fig 433B, CATHEDRALE COMMUNALE_JURY
fig 433C, CATHEDRALE COMMUNALE_JURY
fig 433D, CATHEDRALE COMMUNALE_JURY
fig 706A, Model
fig 318A, Axonometric WTC
fig 380A, The masters refer
fig 752A, photo, Vynckier 2, Principe, Maquette, Inkom
fig 410A, drawing, Detail
fig 98A, Quick steel
fig 495A, model, Work in progress model CNC-site
fig 185A, DECORMAQUETTE
fig 722A, photo, Vynckier 2, Vynckier 2, Schets inkom
fig 693A, 3RROR cad to jpg
fig 502A, Section A110
fig 160A, PROCES – AFBREKEN VS OPBOUW
fig 160B, PROCES – AFBREKEN VS OPBOUW
fig 517A, space and event
fig 25A, photo, Hole deck, Holedeck construction
fig 25B, model, Hole deck
fig 635A, Idea Superstudio on ConnectingGrid
fig 57A, Mid-Process model
fig 39A, drawing, Japan wood connection in chamonix
fig 312A, A Cut Into Our Model
fig 312B, A Cut Into Our Model
fig 312C, A Cut Into Our Model
fig 484A, test housing tower
fig 243A, model, Luciana Ligeiro and Marta Faustino
fig 765A, fire station Mechelen
fig 401A, drawing, Connection to the floor
fig 371A, Glass corner “box” vertical garden
fig 637A, Shed structure with new volume
fig 637B, Shed structure with new volume
fig 124A, photo, Construction clt
fig 623A, Masterplan Model 2
fig 193A, meetings
fig 694A, Behind the scenes
fig 694B, Behind the scenes
fig 423A, drawing, pt.2
fig 423B, drawing, pt.2
fig 423C, drawing, pt.2
fig 774A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 302A, WTC Sketch
fig 201A, Floors sections
fig 446A, Old vs. new
fig 107A, drawing, details in color
fig 107B, details in color
fig 107C, details in color
fig 107D, details in color
fig 48A, model vs Spa reine
fig 708A, photo, Vynckier, Masterplan, Functies
fig 697A, Plan / section Manchester
fig 697B, Plan / section Manchester
fig 697C, Plan / section Manchester
fig 721A, photo, Vynckier 2, Vynckier 2, Snede
fig 64A, DOME – EPS + SPRAYED CONCRETE, DOME - EPS + SPRAYED CONCRETE
fig 64B, DOME – EPS + SPRAYED CONCRETE
fig 64C, DOME – EPS + SPRAYED CONCRETE
fig 64D, DOME – EPS + SPRAYED CONCRETE
fig 648A, BOX ON STEEL
fig 68A, collage: walls around the field
fig 385A, CATHEDRALE COMMUNALE_SECTIONS
fig 385B, CATHEDRALE COMMUNALE_SECTIONS
fig 116A, drawing, Program, Freeing the site of cars by putting them in a tower of the same height as his modernistic neighbor.
fig 116B, photo, Program, Entering the city via the E17 viaduct
fig 116C, drawing, Program
fig 116D, photo, Program
fig 659A, photo, shed structure
fig 353A, LOFTS With gardens in double skin facade
fig 798A, Detail foto’s – ELbeton
fig 541A, Isomo uitsparing voor TPG betonvloer
fig 674A, drawing, Dwarse snede
fig 102A, drawing, club house
fig 439A, model, WTC remodel – puzzle
fig 439B, model, WTC remodel – puzzle
fig 439C, model, WTC remodel – puzzle
fig 439D, model, WTC remodel – puzzle
fig 633A, Masterplan level 1
fig 96A, mazda site koopvaardijlaan, Drawing of the interior structure on the exterior wall. Also the remnants of a connected wooden building that burned down in the 1970's is still visible in the drawing.
fig 96B, mazda site koopvaardijlaan, cast concrete column
fig 96C, mazda site koopvaardijlaan, View towards aisle on the side of the tracks.
fig 96D, mazda site koopvaardijlaan
fig 412A, Torre Velasca
fig 412B, Torre Velasca
fig 849A, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 849B, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 849C, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 849D, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 447A, Adjacent
fig 222A, model, proces_22
fig 624A, drawing, Construction in wood for Manchester
fig 611A, Pavilion on Vynckier Site
fig 611B, Pavilion on Vynckier Site
fig 611C, Pavilion on Vynckier Site
fig 611D, Pavilion on Vynckier Site
fig 551A, Parkeergebouw Ledeberg, Nieuw Parkeergebouw Ledeberg
fig 558A, Model Engine Room
fig 558B, Model Engine Room
fig 793A, Detail – Neue National Galerie – Mies VDR
fig 698A, Axonometries CONNECTING GRID
fig 698B, Axonometries CONNECTING GRID
fig 296A, WTC sections
fig 773A, Erfgoeddepot Trezoor, Kortrijk
fig 512A, final jury @ KANAL bxl
fig 512B, final jury @ KANAL bxl
fig 512C, final jury @ KANAL bxl
fig 512D, final jury @ KANAL bxl
fig 363A, WTC 1 – model of mosque
fig 363B, WTC 1 – model of mosque
fig 374A, Cathedrale Communale
fig 317A, Lina Bo Bardi MASP under construction
fig 304A, work documents
fig 766A, Nieuwstraat Sint-Gillis-Waas
fig 461A, House Botte – bOb Van Reeth
fig 653A, Circle Building section
fig 661A, Concrete Disc building
fig 138A, Sint – Amandsberg site, Gent. Details
fig 209A, drawing, proces_10
fig 476A, vertrapping
fig 556A, Combination industry and living, Biestebroek quay – Plusoffice Architects & Collectif WRKSHP
fig 556B, Combination industry and living, Biestebroek quay – Plusoffice Architects & Collectif WRKSHP
fig 556C, Combination industry and living, Biestebroek quay – Plusoffice Architects & Collectif WRKSHP
fig 754A, photo, Vynckier 2, Principe authentieke en groene gevel, Maquette
fig 540A, ECAM – Agwa Architects
fig 540B, ECAM – Agwa Architects
fig 74A, model, MODEL – WASSERIJ DER VLAANDEREN, WASSERIJ DER VLAANDEREN
fig 791A, Isometrie – Lange & Esthers Houses – Mies VDR
fig 250A, working session
fig 757A, detail schetsen
fig 757B, detail schetsen
fig 757C, detail schetsen
fig 757D, detail schetsen
fig 49A, Model #2
fig 441A, hopvandenbrandenstraat.
fig 441B, hopvandenbrandenstraat.
fig 441C, hopvandenbrandenstraat.
fig 705A, De Nieuwe Vynckier – Incubator – Passerel
fig 670A, Structuur Manchester 2
fig 175A, drawing, Project BOMA
fig 175B, drawing, Project BOMA
fig 175C, drawing, Project BOMA
fig 175D, drawing, Project BOMA
fig 825A, SUPERSTUDIO Un catalogo di ville 1968-1970, Villa Suburbana A6
fig 657A, Steel Frame Box
fig 688A, floorplan
fig 688B, floorplan
fig 688C, floorplan
fig 753A, photo, Vynckier 2, Principe oud en nieuw, Maquette
fig 230A, proces_32
fig 152A, Reference: ALEXANDER BRODSKY 95 DEGREES RESTAURANT
fig 152B, photo, Reference: ALEXANDER BRODSKY 95 DEGREES RESTAURANT
fig 152C, photo, Reference: ALEXANDER BRODSKY 95 DEGREES RESTAURANT
fig 162A, REFERENCE – ALDO VAN EYCK SONSBEEK PAVILJOEN
fig 470A, GEORGE & GILBERT
fig 470B, GEORGE & GILBERT
fig 290A, Reference: Standard Bank Centre – Hentrich, Petschnigg & Partners ( 1970)
fig 467A, Collage Rules
fig 263A, structureel schema plint
fig 568A, bouw fabriek schoorsteen
fig 568B, bouw fabriek schoorsteen
fig 568C, bouw fabriek schoorsteen
fig 265A, John Hancock Center
fig 265B, John Hancock Center
fig 265C, John Hancock Center
fig 265D, John Hancock Center
fig 97A, drawing, SITE & BUILDING ANALYSIS, Exploded view from different construction segments
fig 97B, SITE & BUILDING ANALYSIS, Detailed plan from below and above the ground
fig 113A, drawing, Site Ijzerweglaan, City fabric
fig 113B, photo, Site Ijzerweglaan, Island cut off by the river Schelde and the E17 Viaduct
fig 113C, model, Site Ijzerweglaan
fig 113D, drawing, Site Ijzerweglaan, Different existing typologies
fig 582A, drawing, Drawing proposal Masterplan
fig 462A, bOb
fig 462B, bOb
fig 462C, bOb
fig 462D, bOb
fig 680A, 27/05
fig 680B, 27/05
fig 680C, 27/05
fig 680D, drawing, 27/05
fig 428A, FINAL Model WTC
fig 428B, FINAL Model WTC
fig 428C, FINAL Model WTC
fig 155A, drawing, ISO
fig 391A, Is It a Niemeyer?
fig 391B, Is It a Niemeyer?
fig 724A, photo, Vynckier 2, Vynckier 2, Wachtgevel
fig 287A, WTC 1 axo tetris
fig 309A, Balkony garden
fig 309B, Balkony garden
fig 309C, Balkony garden
fig 309D, Balkony garden
fig 505A, BEEKSTRAAT
fig 505B, BEEKSTRAAT
fig 505C, BEEKSTRAAT
fig 11A, photo, FC Muide
fig 11B, photo, FC Muide
fig 11C, photo, FC Muide
fig 839A, model, Facq building model section, roller bridge
fig 51A, photo, Project Nonnemeersstraat, Ghent
fig 51B, drawing, Project Nonnemeersstraat, Ghent
fig 51C, drawing, Project Nonnemeersstraat, Ghent
fig 51D, drawing, Project Nonnemeersstraat, Ghent
fig 4A, photo, Hidden interior structure of the Tondelier sasholders, Interior of the Tondelier gasholders.
fig 4B, photo, Hidden interior structure of the Tondelier sasholders, Interior of the Tondelier gasholders.
fig 4C, photo, Hidden interior structure of the Tondelier sasholders, Interior of the Tondelier gasholders.
fig 4D, photo, Hidden interior structure of the Tondelier sasholders, Remaining structure Tondelier gasholder
fig 440A, Gilbert & George
fig 716A, photo, Vynckier 2, Vynckier 2, Primaire en secundaire structuur
fig 480A, housewithonepencil.
fig 377A, Wooden box in steel structure
fig 546A, Bijgebouw Manchester 1
fig 289A, Louis Sullivan – The tall office building artistically considered
fig 570A, photo, WATER TOWER, Public square as entrance.
fig 570B, photo, WATER TOWER, Manchester's are for living and the heart of industry (water tower) between them.
fig 150A, Composite steel columns
fig 847A, Chernobyl radar
fig 347A, Scheme structures silo
fig 347B, Scheme structures silo
fig 686A, ingrepen op aanwezige context
fig 686B, ingrepen op aanwezige context
fig 79A, drawing, detail construction garage box, construction detail precast concrete elements
fig 543A, Bambow bridge – Atelier Lai
fig 103A, RECTOLIGHT
fig 136A, Sint – Amandsberg site, Gent. Detail Model, OLYMPUS DIGITAL CAMERA
fig 352A, Vertical Garden WTC
fig 352B, Vertical Garden WTC
fig 357A, Diving Tank, WTC
fig 89A, photo, Study models
fig 89B, Study models
fig 89C, photo, Study models, Using the same logic to connect two pieces to find the right length
fig 740A, drawing, Tulou, reference - China
fig 740B, model, Tulou, rammed earth and wood structure
fig 740C, model, Tulou, rammed earth and wood structure
fig 740D, model, Tulou, structure
fig 576A, Sketch of masterplan, scale 1/1000
fig 153A, DRAWINGS
fig 153B, DRAWINGS
fig 153C, DRAWINGS
fig 153D, DRAWINGS
fig 831A, New Added Structure Pattyn Factory
fig 86A, photo, Wittemolenstraat, Sint – Amandsberg, OLYMPUS DIGITAL CAMERA
fig 86B, Wittemolenstraat, Sint – Amandsberg, OLYMPUS DIGITAL CAMERA
fig 69A, models
fig 104A, drawing, supporting points in sports
fig 104B, supporting points in sports
fig 104C, supporting points in sports
fig 802A, analysis facade hangar
fig 792A, Mies van der Rohe – Farnsworth House – Hoekdetail
fig 219A, drawing, proces_19
fig 534A, The Smithsons’ New Brutalism
fig 534B, The Smithsons’ New Brutalism
fig 719A, Vynckier Circle Building
fig 719B, Vynckier Circle Building
fig 719C, Vynckier Circle Building
fig 719D, Vynckier Circle Building
fig 88A, MODEL #4
fig 427A, first test extra facade
fig 711A, photo, Vynckier, Masterplan, Overdekte markt met passerelle
fig 514A, model, END MODEL CNC
fig 514B, model, END MODEL CNC
fig 514C, END MODEL CNC
fig 675A, fragment model
fig 675B, fragment model
fig 675C, fragment model
fig 226A, drawing, proces_27
fig 239A, PHOTO
fig 111A, ComFlor® 51+
fig 111B, model, ComFlor® 51+
fig 111C, photo, ComFlor® 51+
fig 126A, URBAN FARM
fig 126B, URBAN FARM
fig 425A, Early plan social triplex
fig 600A, Vynckier Site Masterplan Model
fig 166A, photo, FACADE DETAIL, The final fragmented detail of one of the three variations.
fig 166B, photo, FACADE DETAIL, The final fragmented detail of one of the three variations.
fig 166C, photo, FACADE DETAIL, Isometric view of the three variation on the outside columns.
fig 166D, photo, FACADE DETAIL, Handmade concrete
fig 491A, NG17 – preliminary design 06/05 – hostel + offices
fig 491B, NG17 – preliminary design 06/05 – hostel + offices
fig 531A, photo, Vynckier 1981-94
fig 531B, photo, Vynckier 1981-94
fig 171A, drawing, Analysis structure De Porre, Cantilever in concrete
fig 213A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 416A, model, werkmaquette
fig 416B, model, werkmaquette
fig 264A, Manhattan project
fig 264B, Manhattan project
fig 264C, Manhattan project
fig 200A, photo, Axonometry Limit – Axel and Luna :)
fig 71A, photo, axonometric view on docks site
fig 734A, Primary Circles_Model
fig 569A, photo, Vynckier, Vynckier_Productiehal
fig 414A, Final design detail
fig 414B, Final design detail
fig 776A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 157A, model masterplan
fig 396A, model, Small 1/200 scale model
fig 180A, model, Site de Porre – primary structure model, A
fig 128A, drawing, Final drawings
fig 128B, model, Final drawings
fig 128C, drawing, Final drawings
fig 128D, drawing, Final drawings
fig 382A, ANALYSIS WTC
fig 382B, ANALYSIS WTC
fig 395A, model, Final scale model
fig 137A, model, photos models
fig 137B, photo, photos models
fig 137C, model, photos models
fig 137D, photos models
fig 33A, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre Gentbrugge - site
fig 33B, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre - Primary structure
fig 33C, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre Gentbrugge - Concrete ceiling
fig 33D, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre - fragment
fig 454A, Enclosed houses
fig 454B, photo, Enclosed houses
fig 156A, photo, research structure, A
fig 763A, warehouse Zoutman ghent
fig 763B, warehouse Zoutman ghent
fig 297A, WTC situation plan
fig 810A, Haus ohne eigenschaften
fig 182A, drawing, Masterplan final site gentbrugge
fig 182B, drawing, Masterplan final site gentbrugge, coworking
fig 182C, drawing, Masterplan final site gentbrugge
fig 182D, photo, Masterplan final site gentbrugge
fig 325A, work documents 20180417
fig 325B, work documents 20180417
fig 325C, work documents 20180417
fig 43A, photo, Hot Rivet, knooppunt staalstructuur
fig 15A, photo, SILOS, TANKS & HOLDERS, Rotating the panels allows vertical forces to be guided down
fig 15B, drawing, SILOS, TANKS & HOLDERS, Basic dimensions of a cold rolled steel silo panel
fig 73A, drawing, Construction details of the warehouse on site
fig 73B, drawing, Construction details of the warehouse on site
fig 73C, drawing, Construction details of the warehouse on site
fig 692A, Modelshots CONNECTING GRID
fig 692B, Modelshots CONNECTING GRID
fig 692C, Modelshots CONNECTING GRID
fig 692D, Modelshots CONNECTING GRID
fig 684A, Maquette Masterplan
fig 449A, photo, Collage geïnspireerd op Gilbert & George
fig 845A, Becher prize
fig 845B, Becher prize
fig 830A, Structural Plan Pattyn Factory
fig 764A, Ghent expo
fig 665A, OMA
fig 665B, OMA
fig 665C, OMA
fig 665D, OMA
fig 37A, drawing, corner of the sport fence
fig 164A, photo, CREE LCT building system, Floor slab with the holes in it for the steel bar of the columns
fig 164B, CREE LCT building system, wall piece with the columns attached
fig 202A, WALL LIMIT AXONOMETRIC
fig 70A, photo, Pictures Nonnemeersstraat, Ghent
fig 70B, photo, Pictures Nonnemeersstraat, Ghent
fig 602A, photo, Recycled U, Een manier van bouwen die de aarde zo min mogelijk belast. Als schakel tussen wonen en industrie die de site verbindt.
fig 602B, Recycled U
fig 578A, drawing, Masterplan
fig 244A, model, Maurício Muller and Jerónimo Bailat
fig 554A, Prefab Walls
fig 682A, model
fig 682B, model
fig 682C, model
fig 682D, model
fig 559A, section engine room archive
fig 365A, Axo volumes
fig 365B, Axo volumes
fig 622A, Structuur Schijf
fig 403A, drawing, Drawing of buildup wintergarden
fig 498A, photo, maquettefoto A. Lavalléestraat
fig 241A, axonometric
fig 241B, axonometric
fig 549A, photo, Site visit
fig 549B, photo, Site visit
fig 549C, photo, Site visit
fig 101A, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101B, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101C, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101D, drawing, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 586A, drawing, VERTICAL FARMING WITH WATER PURIFICATION
fig 586B, photo, VERTICAL FARMING WITH WATER PURIFICATION
fig 295A, Civic Center – SOM
fig 345A, La Fábrica – Ricardo Bofill
fig 575A, Model of vision on masterplan, scale 1/1000
fig 389A, CATHEDRALE COMMUNALE_DETAILS
fig 329A, WERKMAQUETTE_1-2
fig 329B, WERKMAQUETTE_1-2
fig 668A, Site section Terminal
fig 170A, photo, REFERENCES
fig 170B, REFERENCES
fig 170C, REFERENCES
fig 170D, REFERENCES
fig 758A, maquette
fig 758B, maquette
fig 758C, maquette
fig 758D, maquette
fig 146A, Visit Industrial Natural stone factory
fig 146B, Visit Industrial Natural stone factory
fig 315A, Tetris Within A Tetris
fig 336A, Werkmaquette
fig 700A, Masterplan
fig 700B, Masterplan
fig 646A, Green Industry ?
fig 231A, AXONOMETRIC
fig 212A, final isometric Axel and Luna
fig 283A, werfbezoek – logisitek verdeelverdiep
fig 283B, werfbezoek – logisitek verdeelverdiep
fig 333A, REFERENTIE_2
fig 804A, analysis facade
fig 257A, WTC beams
fig 59A, PUNCHED/PUNCTURED BEAM
fig 59B, PUNCHED/PUNCTURED BEAM
fig 59C, PUNCHED/PUNCTURED BEAM
fig 676A, drawing, Langse snede
fig 27A, drawing, Types of steel trusses
fig 683A, volume maquette en masterplan ingreep
fig 683B, volume maquette en masterplan ingreep
fig 80A, drawing, Site analyse
fig 80B, drawing, Site analyse
fig 80C, drawing, Site analyse
fig 80D, drawing, Site analyse
fig 130A, Example sites photos
fig 130B, Example sites photos
fig 130C, Example sites photos
fig 308A, Vertical Garden
fig 223A, drawing, proces_23
fig 369A, Structural model WTC brewery
fig 369B, Structural model WTC brewery
fig 238A, AXONOMETRIC, Jukyung & Uk
fig 583A, Proposal Masterplan Vynckier
fig 628A, drawing, Section of a Tulou, traditional housing in China
fig 628B, drawing, Section of a Tulou, traditional housing in China
fig 14A, photo, Industrial project
fig 14B, photo, Industrial project
fig 14C, photo, Industrial project
fig 14D, photo, Industrial project
fig 99A, Basic Concrete Prefab Construction, construction site
fig 99B, Basic Concrete Prefab Construction, Connection in the center of a diagonal buttress
fig 99C, Basic Concrete Prefab Construction, Top connection of a diagonal buttress
fig 99D, Basic Concrete Prefab Construction, Floor connection of a diagonal buttress
fig 322A, Fotos werfbezoek
fig 322B, Fotos werfbezoek
fig 322C, Fotos werfbezoek
fig 119A, model, Test model of 3 05 2017
fig 642A, Maquette
fig 642B, Maquette
fig 553A, Vynckier Manchester I Foundation
fig 285A, sketch on existing plan
fig 405A, drawing, DETAIL_SILO
fig 286A, sketch on existing plan
fig 431A, drawing, WTC remodel – detail of roof of rooftop extension
fig 431B, drawing, WTC remodel – detail of roof of rooftop extension
fig 431C, drawing, WTC remodel – detail of roof of rooftop extension
fig 431D, drawing, WTC remodel – detail of roof of rooftop extension
fig 277A, Steel connections WTC +24
fig 277B, Steel connections WTC +24
fig 277C, Steel connections WTC +24
fig 277D, Steel connections WTC +24
fig 355A, WERKMAQUETTE_3.3_BUREN
fig 184A, Design
fig 184B, Design
fig 184C, Design
fig 184D, Design
fig 818A, photo, Autographe, Teamwork with Jill Gielen.
fig 818B, photo, Autographe, Teamwork with Jill Gielen.
fig 818C, photo, Autographe, Teamwork with Jill Gielen.
fig 818D, photo, Autographe, Teamwork with Jill Gielen.
fig 532A, Werf, Temporary school of Villejuif, Jean Prouvé
fig 760A, drawing, Projection of chessboard grid on Vynckier site
fig 387A, CATHEDRALE COMMUNALE_PROGRAM
fig 387B, CATHEDRALE COMMUNALE_PROGRAM
fig 145A, STRUCTURAL DESIGN PRINCIPLES
fig 145B, STRUCTURAL DESIGN PRINCIPLES
fig 145C, STRUCTURAL DESIGN PRINCIPLES
fig 145D, STRUCTURAL DESIGN PRINCIPLES
fig 743A, photo, Strabag – Stapelplein Gent, Hole for crane inside basement
fig 229A, proces_31
fig 772A, Teatro del Mondo, Aldo Rossi
fig 179A, Primary & New
fig 827A, THE SITE, Belgian lust for construction
fig 626A, Connecting grid model
fig 707A, photo, Vynckier, Masterplan, Vooraanzicht maquette
fig 770A, Piazza dell’Anfiteatro
fig 770B, Piazza dell’Anfiteatro
fig 143A, structural color
fig 143B, structural color
fig 411A, axo details
fig 411B, drawing, axo details
fig 279A, werfbezoek – breedplaatwanden
fig 279B, werfbezoek – breedplaatwanden
fig 306A, Site Visit 2
fig 306B, Site Visit 2
fig 306C, Site Visit 2
fig 306D, Site Visit 2
fig 715A, structure proposition
fig 715B, structure proposition
fig 715C, structure proposition
fig 388A, CATHEDRALE COMMUNALE_ISOMETRIC
fig 376A, STRUCTUREMODEL_SERVICEFLATS_1
fig 376B, STRUCTUREMODEL_SERVICEFLATS_1
fig 176A, FINAL MODEL
fig 176B, FINAL MODEL
fig 373A, cathédrale communale work documents
fig 373B, cathédrale communale work documents
fig 46A, drawing, masterplan site gentbrugge
fig 46B, drawing, masterplan site gentbrugge
fig 46C, photo, masterplan site gentbrugge
fig 771A, drawing, Città Analoga, Aldo Rossi
fig 634A, Structure ConnectingGrid
fig 741A, model, Site model, site Vynkier
fig 118A, photo, Test model of 26 04 2017
fig 118B, photo, Test model of 26 04 2017
fig 118C, photo, Test model of 26 04 2017
fig 262A, Opbouw maquette S1:50 WTC
fig 274A, Welkom in de Noord-wijk
fig 274B, Welkom in de Noord-wijk
fig 274C, Welkom in de Noord-wijk
fig 274D, Welkom in de Noord-wijk
fig 450A, wonen VS industrie
fig 52A, CONSTRUCTION SITE
fig 207A, model
fig 702A, De Nieuwe Vynckier – Incubator – Concept
fig 424A, Distinction in program
fig 424B, Distinction in program
fig 594A, drawing, 25/03
fig 594B, drawing, 25/03
fig 594C, model, 25/03
fig 348A, Scheme connections in steel
fig 225A, drawing, proces_24
fig 26A, photo, Lumat Site Gent
fig 26B, photo, Lumat Site Gent
fig 26C, photo, Lumat Site Gent
fig 402A, model, CATHEDRALE COMMUNALE_DETAIL
fig 402B, model, CATHEDRALE COMMUNALE_DETAIL
fig 378A, Wooden stairs in steel structure
fig 589A, Vynckier Site, first proposal, scheme
fig 311A, Analysing the parking lot
fig 311B, Analysing the parking lot
fig 311C, Analysing the parking lot
fig 311D, Analysing the parking lot
fig 91A, MODEL #1, Interior wooden structure
fig 91B, MODEL #1, Interior wooden structure
fig 58A, Model #1
fig 58B, Model #1
fig 216A, drawing, proces_13
fig 655A, primary arcs
fig 717A, photo, Vynckier 2, Vynckier 2, Architectuurplan, Gelijkvloers
fig 407A, drawing, Facade
fig 561A, Machinekamer Vynckier site
fig 233A, model, Valentin Graf and Borja Fernandez
fig 32A, drawing, Hangar INCO, Exploded construction of the hangar
fig 32B, drawing, Hangar INCO, Composition detail of brick, concrete columns and plinth
fig 32C, Hangar INCO
fig 32D, Hangar INCO
fig 730A, primary structure
fig 730B, primary structure
fig 730C, primary structure
fig 730D, primary structure
fig 591A, photo, Vynckier Site, masterplan, sketch
fig 677A, research existing structure
fig 677B, research existing structure
fig 677C, research existing structure
fig 677D, research existing structure
fig 750A, vynckier 2020
fig 631A, drawing, SECTION VYNCKIER
fig 658A, Parochiezaal
fig 658B, Parochiezaal
fig 419A, drawing, snede
fig 44A, drawing, STEEL JOINT
fig 197A, work in progress … axonometry
fig 338A, Maquette 1/50
fig 704A, De Nieuwe Vynckier – Incubator – Model
fig 261A, drawing, WTC_subtraction, WTC_subtraction
fig 261B, drawing, WTC_subtraction, WTC_axonometry
fig 372A, Research roof structure diving tank
fig 372B, Research roof structure diving tank
fig 364A, cathédrale communale work documents
fig 364B, cathédrale communale work documents
fig 354A, Vertical Garden WTC, “Hanging the stairs” Sketches
fig 620A, U VYNCKIER
fig 620B, U VYNCKIER
fig 191A, meetings
fig 298A, WTC axo concepts
fig 227A, proces_29
fig 587A, Proposal Masterplan
fig 736A, model, Project, Manchester Two
fig 736B, drawing, Project, Manchester Two
fig 736C, drawing, Project, Manchester Two
fig 736D, drawing, Project, Manchester Two
fig 848A, Willem Boel – Primary Talks
fig 63A, Model tests
fig 31A, photo, Silos, tanks & holders, Fully assembled
fig 31B, photo, Silos, tanks & holders, Positioning the different panels
fig 31C, photo, Silos, tanks & holders, Pre-asssembly of the different panels
fig 319A, exploded sokkel
fig 489A, Work in progress – Dauwstraat, Processed with VSCO with preset
fig 288A, Voorstel programma toren
fig 334A, WERKMAQUETTE_3.1
fig 334B, WERKMAQUETTE_3.1
fig 305A, Site Visit 1
fig 305B, Site Visit 1
fig 305C, Site Visit 1
fig 305D, Site Visit 1
fig 778A, Mushroom farm
fig 122A, Structure site Nieuwevaart Gent
fig 122B, Structure site Nieuwevaart Gent
fig 195A, visits
fig 645A, MASTERPLAN VYNCKIER
fig 821A, photo, Loods Soubry, Roeselare – Ruff
fig 652A, Building shed structure new addition
fig 640A, Georgia
fig 236A, model,Jukyung & Uk
fig 713A, photo, Vynckier, Masterplan, Zicht op Manchester 1 en overdekte markt
fig 36A, photo, Woonzorgcentrum Van Lierde, the blocks can be used for structural and non-structural purposes
fig 521A, The Smithsons’ New Brutalism
fig 664A, Markthal
fig 664B, model, Markthal
fig 664C, drawing, Markthal
fig 664D, model, Markthal
fig 666A, Maquette Terminal
fig 666B, Maquette Terminal
fig 666C, Maquette Terminal
fig 666D, Maquette Terminal
fig 826A, SUPERSTUDIO Le dodici Città Ideali 1971
fig 87A, Analysis structure De Porre, De Porre - floorplan
fig 87B, Analysis structure De Porre, De Porre - level +1
fig 87C, Analysis structure De Porre, Isometric view - surroundings
fig 87D, Analysis structure De Porre, Isometric view - structure
fig 469A, werf, Aldi. Sint-Niklaas
fig 469B, werf, Aldi. Sint-Niklaas
fig 281A, werfbezoek – fout wapeningsstaal
fig 267A, OCBC Bank
fig 38A, drawing, pergola without roof connection
fig 794A, Detail foto hoekprofiel – Lake Short Drive – Mies VDR
fig 426A, northern quarter voyeurism, An MQ-9 Reaper and MQ-1 Predator sit on display in brand new Hangar three at Holloman Air Force Base, N.M.
fig 426B, northern quarter voyeurism
fig 814A, V-Profiles used in the ceiling (lost formwork), V-Profile 1978
No images selected…
fig 81A drawing, ANALYSE EXISTING STRUCTURES, posted by Tim Belaen at 24.05.17 (filed under: steel)
fig 458A Enclosed house, posted by Sandrine Janssens at 02.03.19 (filed under:)
fig 436A MAQUETTE_WTC_ONTWERP, posted by Louis Lories at 15.06.18 (filed under: steel)
fig 436B MAQUETTE_WTC_ONTWERP, posted by Louis Lories at 15.06.18 (filed under: steel)
fig 436C MAQUETTE_WTC_ONTWERP, posted by Louis Lories at 15.06.18 (filed under: steel)
fig 436D MAQUETTE_WTC_ONTWERP, posted by Louis Lories at 15.06.18 (filed under: steel)
fig 393A model, Cathedrale Communale, posted by leilaviaene at 03.06.18 (filed under: concrete)
fig 393B model, Cathedrale Communale, posted by leilaviaene at 03.06.18 (filed under: concrete)
fig 393C model, Cathedrale Communale, posted by leilaviaene at 03.06.18 (filed under: concrete)
fig 393D model, Cathedrale Communale, posted by leilaviaene at 03.06.18 (filed under: concrete)
fig 132A 4 Column House, posted by Michiel Vrolix at 31.05.17 (filed under: brick wood)
fig 310A Architecture Noordwijk, posted by Femke Van Doorsselaere at 16.04.18 (filed under: glass steel)
fig 310B Architecture Noordwijk, posted by Femke Van Doorsselaere at 16.04.18 (filed under: glass steel)
fig 149A Sketches, posted by Helen Van de Vloet at 31.05.17 (filed under: concrete steel)
fig 149B Sketches, posted by Helen Van de Vloet at 31.05.17 (filed under: concrete steel)
fig 550A Parkeergebouw Ledeberg, posted by Bert Van Wijnendaele at 27.02.20 (filed under: concrete steel)
fig 256A drawing, Structural core, posted by Nikolai Thyregaard at 01.09.17 (filed under: concrete)
fig 256B drawing, Structural core, posted by Nikolai Thyregaard at 01.09.17 (filed under: concrete)
fig 24A photo, Steel truss, posted by Thomas Monsy at 15.03.17 (filed under: steel)
fig 24B photo, Steel truss, posted by Thomas Monsy at 15.03.17 (filed under: steel)
fig 84A photo, Study models, posted by Thomas Monsy at 24.05.17 (filed under: steel)
fig 84B photo, Study models, posted by Thomas Monsy at 24.05.17 (filed under: steel)
fig 84C photo, Study models, posted by Thomas Monsy at 24.05.17 (filed under: steel)
fig 40A photo, Schuur Gentbrugge – Site, posted by Emmanuelle Vanhaesendonck at 15.03.17 (filed under: steel)
fig 40B photo, Schuur Gentbrugge – Site, posted by Emmanuelle Vanhaesendonck at 15.03.17 (filed under: steel)
fig 40C photo, Schuur Gentbrugge – Site, posted by Emmanuelle Vanhaesendonck at 15.03.17 (filed under: steel)
fig 40D drawing, Schuur Gentbrugge – Site, posted by Emmanuelle Vanhaesendonck at 15.03.17 (filed under: steel)
fig 409A drawing, Sfeer, posted by Eva Van Craenenbroeck at 03.06.18 (filed under: glass)
fig 409B drawing, Sfeer, posted by Eva Van Craenenbroeck at 03.06.18 (filed under: glass)
fig 409C drawing, Sfeer, posted by Eva Van Craenenbroeck at 03.06.18 (filed under: glass)
fig 596A NIEUWE VYNCKIER, posted by Bert Van Wijnendaele at 24.03.20 (filed under:)
fig 466A l’unionfaitlaforce, posted by Robbe Van Rafelghem at 05.03.19 (filed under:)
fig 597A The Brewing Process, posted by Bert Van Wijnendaele at 24.03.20 (filed under:)
fig 527A Analyse Allmannajuvet Zinc Mine Museum – Peter Zumthor, posted by Bert Van Wijnendaele at 19.02.20 (filed under: wood)
fig 56A sketches container : Stacking;Connection, posted by Helen Van de Vloet at 24.05.17 (filed under: steel wood)
fig 56B sketches container : Stacking;Connection, posted by Helen Van de Vloet at 24.05.17 (filed under: steel wood)
fig 56C sketches container : Stacking;Connection, posted by Helen Van de Vloet at 24.05.17 (filed under: steel wood)
fig 56D sketches container : Stacking;Connection, posted by Helen Van de Vloet at 24.05.17 (filed under: steel wood)
fig 843A Becher Price, posted by Tom Cauwels at 19.03.21 (filed under: brick concrete steel wood)
fig 323A Werfbezoek, posted by Eva Van Craenenbroeck at 16.04.18 (filed under: concrete steel)
fig 323B Werfbezoek, posted by Eva Van Craenenbroeck at 16.04.18 (filed under: concrete steel)
fig 323C Werfbezoek, posted by Eva Van Craenenbroeck at 16.04.18 (filed under: concrete steel)
fig 323D Werfbezoek, posted by Eva Van Craenenbroeck at 16.04.18 (filed under: concrete steel)
fig 139A DT, posted by Manon Coppens at 31.05.17 (filed under: brick concrete steel wood)
fig 139B DT, posted by Manon Coppens at 31.05.17 (filed under: brick concrete steel wood)
fig 370A Section analysis of fermentation tank, posted by Sven de Smet at 10.05.18 (filed under: steel)
fig 93A TECHNICAL DETAILS, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel wood)
fig 93B TECHNICAL DETAILS, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel wood)
fig 585A model, Proposal Masterplan Model, posted by Maurits Verstraete at 18.03.20 (filed under:)
fig 762A theory research Gottfried semper, posted by Corentin  Lefebvre at 02.03.21 (filed under:)
fig 75A model, Construction details of a car dealers garage, posted by Anton Parys at 24.05.17 (filed under: steel)
fig 75B drawing, Construction details of a car dealers garage, posted by Anton Parys at 24.05.17 (filed under: steel)
fig 75C drawing, Construction details of a car dealers garage, posted by Anton Parys at 24.05.17 (filed under: steel)
fig 437A Jury WTC, posted by Floris De Bruyn at 19.06.18 (filed under:)
fig 437B Jury WTC, posted by Floris De Bruyn at 19.06.18 (filed under:)
fig 437C Jury WTC, posted by Floris De Bruyn at 19.06.18 (filed under:)
fig 437D Jury WTC, posted by Floris De Bruyn at 19.06.18 (filed under:)
fig 610A drawing, 01/04, posted by Lene Lemmens at 31.03.20 (filed under:)
fig 610B drawing, 01/04, posted by Lene Lemmens at 31.03.20 (filed under:)
fig 610C drawing, 01/04, posted by Lene Lemmens at 31.03.20 (filed under:)
fig 522A Vynckier site bezoek, posted by Floris De Bruyn at 19.02.20 (filed under:)
fig 359A Detailing sketches, posted by Mattias Vandenbempt at 01.05.18 (filed under: steel)
fig 19A photo, SUPPORTING FACADE STRUCTURE, posted by Floris De Bruyn at 15.03.17 (filed under: steel)
fig 726A Vynckier Site Masterplan, posted by Lode De Smet Van Damme at 27.05.20 (filed under:)
fig 606A Masterplan V2, posted by Bram Degieter at 28.03.20 (filed under:)
fig 606B Masterplan V2, posted by Bram Degieter at 28.03.20 (filed under:)
fig 35A drawing, Floor systems of bricks, posted by Jean-Louis Verstraete at 15.03.17 (filed under: brick)
fig 35B drawing, Floor systems of bricks, posted by Jean-Louis Verstraete at 15.03.17 (filed under: brick)
fig 35C drawing, Floor systems of bricks, posted by Jean-Louis Verstraete at 15.03.17 (filed under: brick)
fig 35D model, Floor systems of bricks, posted by Jean-Louis Verstraete at 15.03.17 (filed under: brick)
fig 663A drawing, 27/05, posted by Lene Lemmens at 26.05.20 (filed under:)
fig 663B drawing, 27/05, posted by Lene Lemmens at 26.05.20 (filed under:)
fig 663C model, 27/05, posted by Lene Lemmens at 26.05.20 (filed under:)
fig 663D drawing, 27/05, posted by Lene Lemmens at 26.05.20 (filed under:)
fig 679A Axonometrie primaire structuur, posted by Anouk Depaepe at 26.05.20 (filed under: concrete steel)
fig 679B Axonometrie primaire structuur, posted by Anouk Depaepe at 26.05.20 (filed under: concrete steel)
fig 592A masterplan, posted by Eva Roose at 20.03.20 (filed under:)
fig 187A studio at carlos ramos’ pavillion, posted by ricardo leitao at 22.07.17 (filed under: concrete)
fig 524A photo, Analyse Swiss Sound Box – Peter Zumthor, posted by Bert Van Wijnendaele at 19.02.20 (filed under: wood)
fig 218A drawing, proces_18, posted by Axel Fangueiro at 26.07.17 (filed under: brick)
fig 94A INDUSTRIAL CONSTRUCTION SITE, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel)
fig 94B INDUSTRIAL CONSTRUCTION SITE, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel)
fig 94C INDUSTRIAL CONSTRUCTION SITE, posted by Alexander Van den Spiegel at 24.05.17 (filed under: concrete steel)
fig 598A Masterplan Model 2, posted by Anouk Depaepe at 25.03.20 (filed under:)
fig 506A TOWER, posted by Sandrine Janssens at 03.06.19 (filed under:)
fig 506B TOWER, posted by Sandrine Janssens at 03.06.19 (filed under:)
fig 506C TOWER, posted by Sandrine Janssens at 03.06.19 (filed under:)
fig 506D TOWER, posted by Sandrine Janssens at 03.06.19 (filed under:)
fig 518A Column Peter Märkli, posted by Lode De Smet Van Damme at 19.02.20 (filed under: concrete)
fig 199A sketch, posted by ricardo leitao at 24.07.17 (filed under: concrete)
fig 795A miro miro, posted by Floris De Bruyn at 03.03.21 (filed under:)
fig 795B miro miro, posted by Floris De Bruyn at 03.03.21 (filed under:)
fig 320A exploded toren, posted by Eva Van Craenenbroeck at 16.04.18 (filed under: steel)
fig 7A drawing, types of compound beam, posted by Helen Van de Vloet at 05.03.17 (filed under: concrete)
fig 62A container cut outs, posted by Helen Van de Vloet at 24.05.17 (filed under: steel)
fig 62B container cut outs, posted by Helen Van de Vloet at 24.05.17 (filed under: steel)
fig 62C container cut outs, posted by Helen Van de Vloet at 24.05.17 (filed under: steel)
fig 62D container cut outs, posted by Helen Van de Vloet at 24.05.17 (filed under: steel)
fig 485A Stut-opties, posted by Sandrine Janssens at 04.05.19 (filed under:)
fig 560A inplantingsmaquette, posted by Jan Ilsbroekx at 06.03.20 (filed under:)
fig 759A photo, Eve Babitz playing chess with Marcel Duchamp, Pasadena 1963, posted by Floris De Bruyn at 29.06.20 (filed under:)
fig 276A Structure WTC 1 +3 & +24, posted by Mattias Vandenbempt at 10.03.18 (filed under: steel)
fig 276B Structure WTC 1 +3 & +24, posted by Mattias Vandenbempt at 10.03.18 (filed under: steel)
fig 276C Structure WTC 1 +3 & +24, posted by Mattias Vandenbempt at 10.03.18 (filed under: steel)
fig 276D Structure WTC 1 +3 & +24, posted by Mattias Vandenbempt at 10.03.18 (filed under: steel)
fig 533A Schets, demonteerbare structuur, Jean Prouvé, posted by Isra Cekaj at 20.02.20 (filed under: steel)
fig 399A Brewery visit, posted by Sven de Smet at 03.06.18 (filed under: steel)
fig 399B Brewery visit, posted by Sven de Smet at 03.06.18 (filed under: steel)
fig 788A Mies van der Rohe – Farnsworth House, posted by Tycho  Maes at 03.03.21 (filed under: steel)
fig 34A model, Lignatur floor/ roof element, posted by Deborah Dumarey at 15.03.17 (filed under: wood)
fig 34B model, Lignatur floor/ roof element, posted by Deborah Dumarey at 15.03.17 (filed under: wood)
fig 167A photo, WORK – tussen, posted by Manon Coppens at 31.05.17 (filed under: steel)
fig 167B WORK – tussen, posted by Manon Coppens at 31.05.17 (filed under: steel)
fig 751A photo, Vynckier 2, posted by Jolien De Smet at 27.05.20 (filed under:)
fig 701A Facades, posted by Bram Degieter at 26.05.20 (filed under: steel)
fig 701B Facades, posted by Bram Degieter at 26.05.20 (filed under: steel)
fig 607A drawing, English Garden – Lancelot Capability Brown, posted by Maurits Verstraete at 31.03.20 (filed under:)
fig 337A Ingang wtc via kern, posted by Carolien Vereecken at 23.04.18 (filed under:)
fig 232A proces_33, posted by Floris De Bruyn at 26.07.17 (filed under: glass)
fig 190A meetings, posted by ricardo leitao at 24.07.17 (filed under: concrete)
fig 612A Masterplan 25/03 & 1/04 2020, posted by Eva Roose at 01.04.20 (filed under:)
fig 612B Masterplan 25/03 & 1/04 2020, posted by Eva Roose at 01.04.20 (filed under:)
fig 612C Masterplan 25/03 & 1/04 2020, posted by Eva Roose at 01.04.20 (filed under:)
fig 612D Masterplan 25/03 & 1/04 2020, posted by Eva Roose at 01.04.20 (filed under:)
fig 632A OFFICE – RTS Building, posted by Lara Winderickx at 28.04.20 (filed under: steel)
fig 632B OFFICE – RTS Building, posted by Lara Winderickx at 28.04.20 (filed under: steel)
fig 278A werfbezoek, posted by Dorien Moonen at 12.03.18 (filed under: brick)
fig 481A work in progress, posted by Sandrine Janssens at 29.04.19 (filed under: brick wood)
fig 481B work in progress, posted by Sandrine Janssens at 29.04.19 (filed under: brick wood)
fig 723A photo, Vynckier 2, posted by Jolien De Smet at 27.05.20 (filed under:)
fig 206A drawing, proces_01, posted by Floris De Bruyn at 26.07.17 (filed under: wood)
fig 545A Constructie detail werfbezoek, posted by Lene Lemmens at 27.02.20 (filed under: concrete steel)
fig 303A atelier, posted by Sophie Leemans at 28.03.18 (filed under:)
fig 811A Haus ohne eigenschaften, posted by Hélène Callewaert at 09.03.21 (filed under:)
fig 8A photo, FRAC, Dunkerque by Lacaton & Vasal, posted by arthurhaegeman at 08.03.17 (filed under: concrete plastics steel)
fig 8B photo, FRAC, Dunkerque by Lacaton & Vasal, posted by arthurhaegeman at 08.03.17 (filed under: concrete plastics steel)
fig 8C photo, FRAC, Dunkerque by Lacaton & Vasal, posted by arthurhaegeman at 08.03.17 (filed under: concrete plastics steel)
fig 8D photo, FRAC, Dunkerque by Lacaton & Vasal, posted by arthurhaegeman at 08.03.17 (filed under: concrete plastics steel)
fig 253A Working session, posted by Floris De Bruyn at 30.08.17 (filed under: concrete glass wood)
fig 639A Masterplan model, posted by Maurits Verstraete at 29.04.20 (filed under:)
fig 203A sketch, posted by ricardo leitao at 25.07.17 (filed under: concrete)
fig 584A Proposal Facade Vynckier site, posted by Lode De Smet Van Damme at 18.03.20 (filed under: steel)
fig 148A Inversion of the field, posted by Helen Van de Vloet at 31.05.17 (filed under: wood)
fig 615A Model of masterplan CONNECTING GRID 1.0, posted by Aaron Vanacker at 01.04.20 (filed under: steel)
fig 121A Pictures Model, posted by Mathias Tack at 31.05.17 (filed under: brick steel wood)
fig 121B Pictures Model, posted by Mathias Tack at 31.05.17 (filed under: brick steel wood)
fig 733A Primary Circles_structural system, posted by Emile Bouckaert at 27.05.20 (filed under: concrete)
fig 110A drawing, Current structure analyse, posted by Lawrence Schietgat at 29.05.17 (filed under: steel)
fig 110B drawing, Current structure analyse, posted by Lawrence Schietgat at 29.05.17 (filed under: steel)
fig 110C Current structure analyse, posted by Lawrence Schietgat at 29.05.17 (filed under: steel)
fig 110D Current structure analyse, posted by Lawrence Schietgat at 29.05.17 (filed under: steel)
fig 775A Peter Behrens, AEG Turbinefabriek Berlijn (1909), posted by Pieter-Jan Van Steen at 02.03.21 (filed under: concrete glass steel)
fig 273A References Prestige Towers, posted by Laura Vanderdonckt at 06.03.18 (filed under: steel)
fig 140A model making in the sun, posted by Helen Van de Vloet at 31.05.17 (filed under: concrete steel wood)
fig 140B model making in the sun, posted by Helen Van de Vloet at 31.05.17 (filed under: concrete steel wood)
fig 671A Aanzicht westgevel, posted by Anouk Depaepe at 26.05.20 (filed under: concrete steel)
fig 542A Bambow bridge – Atelier Lai, posted by Wout Vandermeersch at 26.02.20 (filed under: wood)
fig 542B Bambow bridge – Atelier Lai, posted by Wout Vandermeersch at 26.02.20 (filed under: wood)
fig 76A Project Kievit, posted by Yvonne van der Poel at 24.05.17 (filed under: concrete)
fig 76B Project Kievit, posted by Yvonne van der Poel at 24.05.17 (filed under: concrete)
fig 76C Project Kievit, posted by Yvonne van der Poel at 24.05.17 (filed under: concrete)
fig 76D Project Kievit, posted by Yvonne van der Poel at 24.05.17 (filed under: concrete)
fig 188A porto class 17, posted by Floris De Bruyn at 24.07.17 (filed under: concrete)
fig 761A expo Vynckier @ WTF, posted by Floris De Bruyn at 01.07.20 (filed under:)
fig 761B expo Vynckier @ WTF, posted by Floris De Bruyn at 01.07.20 (filed under:)
fig 761C expo Vynckier @ WTF, posted by Floris De Bruyn at 01.07.20 (filed under:)
fig 761D expo Vynckier @ WTF, posted by Floris De Bruyn at 01.07.20 (filed under:)
fig 280A werfbezoek – ultiem grid 740 x 740, posted by Sophie Leemans at 13.03.18 (filed under: concrete)
fig 280B werfbezoek – ultiem grid 740 x 740, posted by Sophie Leemans at 13.03.18 (filed under: concrete)
fig 258A model WTC, posted by Floris De Bruyn at 01.09.17 (filed under: glass steel)
fig 455A renovated structure, posted by Kadir Altun at 27.02.19 (filed under: concrete)
fig 621A drawing, Vynckier, posted by Wout Vandermeersch at 21.04.20 (filed under: steel)
fig 621B drawing, Vynckier, posted by Wout Vandermeersch at 21.04.20 (filed under: steel)
fig 621C drawing, Vynckier, posted by Wout Vandermeersch at 21.04.20 (filed under: steel)
fig 621D drawing, Vynckier, posted by Wout Vandermeersch at 21.04.20 (filed under: steel)
fig 259A model detail, posted by Floris De Bruyn at 01.09.17 (filed under: glass steel)
fig 465A drawing, hopvandenbrandenstraat., posted by Fransje Leijenaar at 04.03.19 (filed under:)
fig 557A Vynckier, posted by Wout Vandermeersch at 05.03.20 (filed under: steel)
fig 557B Vynckier, posted by Wout Vandermeersch at 05.03.20 (filed under: steel)
fig 513A model, END MODEL, posted by Hanlin Li at 11.06.19 (filed under: concrete wood)
fig 513B model, END MODEL, posted by Hanlin Li at 11.06.19 (filed under: concrete wood)
fig 513C model, END MODEL, posted by Hanlin Li at 11.06.19 (filed under: concrete wood)
fig 507A drawing, DAUWSTRAAT DETAILSECTION, posted by Inge Habils at 04.06.19 (filed under: concrete glass steel)
fig 168A Tempory billboard on tempory structure, posted by Helen Van de Vloet at 31.05.17 (filed under: steel wood)
fig 294A Structure Niv +27 WTC, posted by charlie lanckvrind at 19.03.18 (filed under: steel)
fig 445A VERNACULAR, posted by Melissa Vanwezemael at 25.02.19 (filed under: wood)
fig 573A model, Masterplan Vynckiersite, posted by Cisse Vercauteren at 17.03.20 (filed under:)
fig 573B model, Masterplan Vynckiersite, posted by Cisse Vercauteren at 17.03.20 (filed under:)
fig 438A model, WTC remodel – final presentation, posted by Karel Verdonck at 27.06.18 (filed under: concrete glass steel)
fig 438B model, WTC remodel – final presentation, posted by Karel Verdonck at 27.06.18 (filed under: concrete glass steel)
fig 438C model, WTC remodel – final presentation, posted by Karel Verdonck at 27.06.18 (filed under: concrete glass steel)
fig 438D model, WTC remodel – final presentation, posted by Karel Verdonck at 27.06.18 (filed under: concrete glass steel)
fig 386A CATHEDRALE COMMUNALE, posted by Sophie Leemans at 03.06.18 (filed under: concrete steel)
fig 22A photo, factory Gentbrugge – Site, posted by Emmanuelle Vanhaesendonck at 15.03.17 (filed under: brick concrete steel wood)
fig 22B drawing, factory Gentbrugge – Site, posted by Emmanuelle Vanhaesendonck at 15.03.17 (filed under: brick concrete steel wood)
fig 22C drawing, factory Gentbrugge – Site, posted by Emmanuelle Vanhaesendonck at 15.03.17 (filed under: brick concrete steel wood)
fig 22D drawing, factory Gentbrugge – Site, posted by Emmanuelle Vanhaesendonck at 15.03.17 (filed under: brick concrete steel wood)
fig 417A drawing, proces, posted by LindsayPrat at 04.06.18 (filed under: concrete)
fig 417B proces, posted by LindsayPrat at 04.06.18 (filed under: concrete)
fig 237A final axonometry, posted by Charlette Fremont at 26.07.17 (filed under: brick concrete steel)
fig 366A Bochten testen, posted by Laura Vanderdonckt at 08.05.18 (filed under: concrete steel)
fig 366B Bochten testen, posted by Laura Vanderdonckt at 08.05.18 (filed under: concrete steel)
fig 366C Bochten testen, posted by Laura Vanderdonckt at 08.05.18 (filed under: concrete steel)
fig 552A Werf GENT, posted by Eva Roose at 28.02.20 (filed under: concrete)
fig 452A Collage Gilbert and Georges, posted by Chloe Berton at 26.02.19 (filed under:)
fig 245A model, Axel Fangueiro and Luna Fonseca, posted by Floris De Bruyn at 27.07.17 (filed under: brick concrete wood)
fig 95A Tube and Coupler Scaffolds, posted by Kevin De Roeck at 24.05.17 (filed under: steel)
fig 95B Tube and Coupler Scaffolds, posted by Kevin De Roeck at 24.05.17 (filed under: steel)
fig 95C Tube and Coupler Scaffolds, posted by Kevin De Roeck at 24.05.17 (filed under: steel)
fig 95D Tube and Coupler Scaffolds, posted by Kevin De Roeck at 24.05.17 (filed under: steel)
fig 275A Ceiling Infrastructure plan, posted by Maxim Lefebvre at 07.03.18 (filed under: concrete glass steel)
fig 781A photo, Eames case study house 8, posted by Enrico Pavone at 02.03.21 (filed under: glass steel)
fig 781B photo, Eames case study house 8, posted by Enrico Pavone at 02.03.21 (filed under: glass steel)
fig 215A studio, posted by Floris De Bruyn at 26.07.17 (filed under: brick)
fig 769A Analyse Robert Venturi en Denise Scott Brown, Sainsbury Wing National Gallery, posted by Joline Yzewyn at 02.03.21 (filed under:)
fig 769B