fig 583A, model, Proposal Masterplan Model
fig 120A, Reference structure steel
fig 120B, Reference structure steel
fig 120C, Reference structure steel
fig 101A, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101B, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101C, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101D, drawing, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101E, drawing, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 709A, photo, Vynckier, Masterplan, Overdekte markt met passerelle
fig 939A, photo, Picobello
fig 804A, Casa a tre cilindri
fig 664A, Maquette Terminal
fig 664B, Maquette Terminal
fig 664C, Maquette Terminal
fig 664D, Maquette Terminal
fig 664E, Maquette Terminal
fig 754A, maquette
fig 754B, maquette
fig 754C, maquette
fig 754D, maquette
fig 754E, maquette
fig 754F, maquette
fig 754G, maquette
fig 439A, hopvandenbrandenstraat.
fig 439B, hopvandenbrandenstraat.
fig 439C, hopvandenbrandenstraat.
fig 774A, The Cube
fig 485A, Structure LaVallée
fig 569A, Vynckier Site masterplan sketch
fig 724A, Vynckier Site Masterplan
fig 169A, research / site model
fig 169B, research / site model
fig 169C, research / site model
fig 646A, BOX ON STEEL
fig 532A, The Smithsons’ New Brutalism
fig 532B, The Smithsons’ New Brutalism
fig 492A, DETAIL – brick meets wood
fig 688A, Model Manchester
fig 688B, Model Manchester
fig 688C, Model Manchester
fig 688D, Model Manchester
fig 688E, Model Manchester
fig 653A, primary arcs
fig 296A, WTC sections
fig 689A, Modelshots CONNECTING GRID
fig 689B, Modelshots CONNECTING GRID
fig 689C, model, Modelshots CONNECTING GRID
fig 689D, Modelshots CONNECTING GRID
fig 231A, AXONOMETRIC
fig 699A, Facades
fig 699B, Facades
fig 684A, ingrepen op aanwezige context
fig 684B, ingrepen op aanwezige context
fig 669A, Aanzicht westgevel
fig 576A, drawing, Masterplan
fig 987A, photo, Construction site
fig 987B, photo, Construction site
fig 987C, photo, Construction site
fig 987D, photo, Construction site
fig 213A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 250A, working session
fig 951A, MODEL 1/500
fig 951B, MODEL 1/500
fig 951C, MODEL 1/500
fig 581A, Proposal Masterplan Vynckier
fig 717A, Vynckier Circle Building
fig 717B, Vynckier Circle Building
fig 717C, Vynckier Circle Building
fig 717D, Vynckier Circle Building
fig 717E, Vynckier Circle Building
fig 244A, model, Maurício Muller and Jerónimo Bailat
fig 177A, Final model
fig 177B, Final model, C
fig 212A, final isometric Axel and Luna
fig 853A, INTERBETON
fig 214A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 693A, Axonometry of fragment CONNECTING GRID
fig 693B, Axonometry of fragment CONNECTING GRID
fig 566A, bouw fabriek schoorsteen
fig 566B, bouw fabriek schoorsteen
fig 566C, bouw fabriek schoorsteen
fig 452A, Enclosed houses
fig 452B, photo, Enclosed houses
fig 694A, Axonometries CONNECTING GRID
fig 694B, Axonometries CONNECTING GRID
fig 224A, studio
fig 697A, 1 UNIT
fig 697B, 1 UNIT
fig 75A, model, Construction details of a car dealers garage, Joint of a column, primary and secondary roof beams.
fig 75B, drawing, Construction details of a car dealers garage, Joint of a column, primary and secondary roof beams.
fig 75C, drawing, Construction details of a car dealers garage, Connection of the structure of the two halls.
fig 453A, renovated structure
fig 211A, proces_12
fig 446A, photo, Gilbert & George
fig 448A, wonen VS industrie
fig 797A, analysis facade hangar
fig 451A, collage de canal.brussels á la G&G
fig 140A, model making in the sun
fig 140B, model making in the sun
fig 820A, SUPERSTUDIO Un catalogo di ville 1968-1970, Villa Suburbana A6
fig 995A, Photo Assignment
fig 995B, Photo Assignment
fig 995C, Photo Assignment
fig 995D, Photo Assignment
fig 995E, Photo Assignment
fig 690A, Modelshots CONNECTING GRID
fig 690B, Modelshots CONNECTING GRID
fig 690C, Modelshots CONNECTING GRID
fig 690D, Modelshots CONNECTING GRID
fig 350A, How To Become A Niemeyer
fig 701A, De Nieuwe Vynckier – Incubator – Section
fig 782A, Detail – Lake Short Drive – Mies VDR
fig 607A, drawing, Vynckier
fig 607B, model, Vynckier
fig 607C, drawing, Vynckier
fig 655A, Steel Frame Box
fig 496A, photo, maquettefoto A. Lavalléestraat
fig 673A, fragment model
fig 673B, fragment model
fig 673C, fragment model
fig 478A, housewithonepencil.
fig 57A, Mid-Process model
fig 761A, Nieuwstraat Sint-Gillis-Waas
fig 438A, Gilbert & George
fig 762A, Analyse Robert Venturi en Denise Scott Brown, Big Donut Drive-in
fig 940A, Analyse Robert Venturi en Denise Scott Brown
fig 940B, Analyse Robert Venturi en Denise Scott Brown
fig 940C, Analyse Robert Venturi en Denise Scott Brown
fig 940D, Analyse Robert Venturi en Denise Scott Brown
fig 677A, Axonometrie primaire structuur
fig 677B, Axonometrie primaire structuur
fig 93A, TECHNICAL DETAILS, Technical detail on the guiding rails
fig 93B, TECHNICAL DETAILS, Technical detail on the connection between the steel structure & foundation
fig 472A, FUNDERING
fig 263A, structureel schema plint
fig 254A, The ramp
fig 254B, The ramp
fig 254C, The ramp
fig 511A, model, END MODEL
fig 511B, model, END MODEL
fig 511C, model, END MODEL
fig 115A, photo, Site visit
fig 115B, photo, Site visit
fig 115C, photo, Site visit
fig 115D, photo, Site visit
fig 115E, photo, Site visit
fig 695A, Plan / section Manchester
fig 695B, Plan / section Manchester
fig 695C, Plan / section Manchester
fig 707A, photo, Vynckier, Masterplan, Structuur site
fig 773A, Mushroom farm
fig 803A, Briona 72
fig 215A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 722A, photo, Vynckier 2, Vynckier 2, Wachtgevel
fig 979A, geel tracé
fig 979B, geel tracé
fig 680A, model
fig 680B, model
fig 680C, model
fig 680D, model
fig 680E, model
fig 680F, model
fig 34A, model, Lignatur floor/ roof element, Lignatur floor element - hollow core slab
fig 34B, model, Lignatur floor/ roof element, Lignatur floor element - Detail possibilties ducts
fig 369A, Section analysis of fermentation tank
fig 652A, drawing parochiezaal
fig 710A, photo, Vynckier, Masterplan, Zicht op plein
fig 823A, photo, Visit Building Nachtergaele, back facade, Steel, old and new, renovation
fig 823B, photo, Visit Building Nachtergaele, Canopy, conncection, structure, wood, steel, detail
fig 823C, photo, Visit Building Nachtergaele, Montage, original plans
fig 823D, photo, Visit Building Nachtergaele, Facade, floor, conncetion, 3D, lost form, steel, concrete
fig 823E, drawing, Visit Building Nachtergaele
fig 823F, drawing, Visit Building Nachtergaele
fig 611A, drawing, Masterplan CONNECTING GRID 1.0, scale 1/1000
fig 454A, George&Gilbert
fig 162A, REFERENCE – ALDO VAN EYCK SONSBEEK PAVILJOEN
fig 487A, Work in progress – Dauwstraat, Processed with VSCO with preset
fig 437A, model, WTC remodel – puzzle
fig 437B, model, WTC remodel – puzzle
fig 437C, model, WTC remodel – puzzle
fig 437D, model, WTC remodel – puzzle
fig 914A, FIETSBRUG WIEDAUWKAAI
fig 914B, FIETSBRUG WIEDAUWKAAI
fig 914C, FIETSBRUG WIEDAUWKAAI
fig 914D, photo, FIETSBRUG WIEDAUWKAAI
fig 914E, FIETSBRUG WIEDAUWKAAI
fig 914F, FIETSBRUG WIEDAUWKAAI
fig 914G, FIETSBRUG WIEDAUWKAAI
fig 914H, FIETSBRUG WIEDAUWKAAI
fig 422A, Distinction in program
fig 422B, Distinction in program
fig 420A, reference
fig 420B, reference
fig 420C, reference, construction
fig 374A, WERKMAQUETTE_4.1
fig 105A, WASSERIJ DER VLAANDEREN
fig 105B, WASSERIJ DER VLAANDEREN
fig 105C, WASSERIJ DER VLAANDEREN
fig 105D, WASSERIJ DER VLAANDEREN
fig 105E, WASSERIJ DER VLAANDEREN
fig 105F, WASSERIJ DER VLAANDEREN
fig 105G, WASSERIJ DER VLAANDEREN
fig 105H, WASSERIJ DER VLAANDEREN
fig 105I, WASSERIJ DER VLAANDEREN
fig 105J, WASSERIJ DER VLAANDEREN
fig 105K, WASSERIJ DER VLAANDEREN
fig 105L, WASSERIJ DER VLAANDEREN
fig 105M, WASSERIJ DER VLAANDEREN
fig 105N, WASSERIJ DER VLAANDEREN
fig 105O, photo, WASSERIJ DER VLAANDEREN
fig 105P, WASSERIJ DER VLAANDEREN
fig 105Q, WASSERIJ DER VLAANDEREN
fig 105R, WASSERIJ DER VLAANDEREN
fig 105S, WASSERIJ DER VLAANDEREN
fig 105T, WASSERIJ DER VLAANDEREN
fig 105U, WASSERIJ DER VLAANDEREN
fig 105V, WASSERIJ DER VLAANDEREN
fig 105W, WASSERIJ DER VLAANDEREN
fig 105X, WASSERIJ DER VLAANDEREN
fig 752A, ontwerpschetsen
fig 752B, ontwerpschetsen
fig 752C, ontwerpschetsen
fig 752D, ontwerpschetsen
fig 752E, ontwerpschetsen
fig 752F, ontwerpschetsen
fig 752G, ontwerpschetsen
fig 752H, ontwerpschetsen
fig 752I, ontwerpschetsen
fig 752J, ontwerpschetsen
fig 752K, ontwerpschetsen
fig 752L, ontwerpschetsen
fig 752M, ontwerpschetsen
fig 632A, Structure ConnectingGrid
fig 191A, meetings
fig 391A, Cathedrale Communale
fig 391B, Cathedrale Communale
fig 391C, Cathedrale Communale
fig 391D, Cathedrale Communale
fig 391E, Cathedrale Communale
fig 391F, Cathedrale Communale
fig 391G, Cathedrale Communale
fig 391H, Cathedrale Communale
fig 391I, Cathedrale Communale
fig 391J, Cathedrale Communale
fig 391K, Cathedrale Communale
fig 391L, Cathedrale Communale
fig 391M, Cathedrale Communale
fig 391N, Cathedrale Communale
fig 391O, Cathedrale Communale
fig 391P, model, Cathedrale Communale
fig 391Q, model, Cathedrale Communale
fig 391R, model, Cathedrale Communale
fig 391S, model, Cathedrale Communale
fig 391T, model, Cathedrale Communale
fig 391U, model, Cathedrale Communale
fig 391V, model, Cathedrale Communale
fig 391W, model, Cathedrale Communale
fig 391X, model, Cathedrale Communale
fig 391Y, model, Cathedrale Communale
fig 391Z, model, Cathedrale Communale
fig 391, model, Cathedrale Communale
fig 391, model, Cathedrale Communale
fig 391, model, Cathedrale Communale
fig 391, model, Cathedrale Communale
fig 391, model, Cathedrale Communale
fig 391, model, Cathedrale Communale
fig 391, model, Cathedrale Communale
fig 391, model, Cathedrale Communale
fig 391, model, Cathedrale Communale
fig 391, model, Cathedrale Communale
fig 383A, CATHEDRALE COMMUNALE_PLANS
fig 944A, model, JURY 26/05/’21
fig 944B, model, JURY 26/05/’21
fig 944C, model, JURY 26/05/’21
fig 944D, drawing, JURY 26/05/’21
fig 944E, model, JURY 26/05/’21
fig 944F, model, JURY 26/05/’21
fig 944G, model, JURY 26/05/’21
fig 944H, model, JURY 26/05/’21
fig 944I, model, JURY 26/05/’21
fig 361A, Bamboo exoskeleton stairs , Vertical garden
fig 361B, Bamboo exoskeleton stairs , Vertical garden
fig 352A, LOFTS With gardens in double skin facade
fig 899A, model, I-joist factory
fig 899B, I-joist factory
fig 899C, I-joist factory
fig 521A, photo, Les Monseigneurs – Primary Talks
fig 521B, Les Monseigneurs – Primary Talks
fig 100A, Steel Prefab Structure, construction site
fig 100B, Steel Prefab Structure, steel components joint
fig 100C, Steel Prefab Structure, steel components ridge joint
fig 100D, Steel Prefab Structure, steel components joint
fig 100E, Steel Prefab Structure, steel components ridge joint
fig 100F, Steel Prefab Structure
fig 100G, Steel Prefab Structure, steel components corner joint (inside)
fig 100H, Steel Prefab Structure, steel components ridge joint (inside)
fig 960A, FINAL DESIGN
fig 960B, FINAL DESIGN
fig 715A, photo, Vynckier 2, Vynckier 2, Architectuurplan, Gelijkvloers
fig 997A, End Presentation, Model
fig 997B, End Presentation, Model
fig 997C, model, End Presentation, Model
fig 997D, model, End Presentation, Model
fig 997E, model, End Presentation, Model
fig 997F, model, End Presentation, Model
fig 835A, drawing, Facq building, primary & secondary structure
fig 427A, WTC remodel – a tower can have a lot of different plans
fig 427B, WTC remodel – a tower can have a lot of different plans
fig 427C, WTC remodel – a tower can have a lot of different plans
fig 427D, WTC remodel – a tower can have a lot of different plans
fig 427E, WTC remodel – a tower can have a lot of different plans
fig 427F, WTC remodel – a tower can have a lot of different plans
fig 427G, WTC remodel – a tower can have a lot of different plans
fig 427H, WTC remodel – a tower can have a lot of different plans
fig 427I, WTC remodel – a tower can have a lot of different plans
fig 427J, WTC remodel – a tower can have a lot of different plans
fig 427K, WTC remodel – a tower can have a lot of different plans
fig 427L, WTC remodel – a tower can have a lot of different plans
fig 427M, WTC remodel – a tower can have a lot of different plans
fig 427N, WTC remodel – a tower can have a lot of different plans
fig 427O, WTC remodel – a tower can have a lot of different plans
fig 427P, WTC remodel – a tower can have a lot of different plans
fig 427Q, WTC remodel – a tower can have a lot of different plans
fig 427R, WTC remodel – a tower can have a lot of different plans
fig 427S, WTC remodel – a tower can have a lot of different plans
fig 427T, WTC remodel – a tower can have a lot of different plans
fig 427U, WTC remodel – a tower can have a lot of different plans
fig 427V, WTC remodel – a tower can have a lot of different plans
fig 427W, WTC remodel – a tower can have a lot of different plans
fig 427X, WTC remodel – a tower can have a lot of different plans
fig 427Y, WTC remodel – a tower can have a lot of different plans
fig 427Z, WTC remodel – a tower can have a lot of different plans
fig 427, WTC remodel – a tower can have a lot of different plans
fig 427, WTC remodel – a tower can have a lot of different plans
fig 427, WTC remodel – a tower can have a lot of different plans
fig 427, WTC remodel – a tower can have a lot of different plans
fig 427, WTC remodel – a tower can have a lot of different plans
fig 427, WTC remodel – a tower can have a lot of different plans
fig 770A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 865A, THE ANALYSIS, Oostmalle Delften
fig 865B, THE ANALYSIS, Oostmalle Delften
fig 865C, drawing, THE ANALYSIS, Oostmalle Delften
fig 865D, THE ANALYSIS, Oostmalle Delften
fig 865E, THE ANALYSIS, Oostmalle Delften
fig 865F, THE ANALYSIS, Oostmalle Delften
fig 932A, model, Final design Model 1/100
fig 932B, model, Final design Model 1/100
fig 932C, model, Final design Model 1/100
fig 932D, model, Final design Model 1/100
fig 932E, model, Final design Model 1/100
fig 932F, model, Final design Model 1/100
fig 932G, model, Final design Model 1/100
fig 932H, model, Final design Model 1/100
fig 932I, model, Final design Model 1/100
fig 241A, axonometric
fig 241B, axonometric
fig 718A, photo, Vynckier 2, Vynckier 2, Principe 'bloembakken'
fig 262A, Opbouw maquette S1:50 WTC
fig 270A, Willis Tower
fig 270B, Willis Tower
fig 509A, photo, A. Lavalléestraat
fig 509B, photo, A. Lavalléestraat
fig 509C, A. Lavalléestraat
fig 509D, photo, A. Lavalléestraat
fig 640A, Maquette
fig 640B, Maquette
fig 240A, drawing, axonometry Marta and Luciana
fig 763A, Palazzo della Ragione
fig 763B, Palazzo della Ragione
fig 295A, Civic Center – SOM
fig 54A, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54B, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54C, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54D, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54E, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 54F, HOLZER KOBLER ARCHITEKTUREN FRANKIE & JOHNNY STUDENT HOUSING PLÄNTERWALD
fig 615A, werfbezoek
fig 148A, Inversion of the field
fig 730A, Primary Circles_structural system
fig 1012A, photo, Model 1/500 – 1/50 residential
fig 1012B, photo, Model 1/500 – 1/50 residential
fig 1012C, photo, Model 1/500 – 1/50 residential
fig 798A, Facade, office vs storage, Kleimoer, Office vs Storage
fig 976A, GROOTHANDELSMARKT DER VLAANDEREN
fig 976B, GROOTHANDELSMARKT DER VLAANDEREN
fig 976C, GROOTHANDELSMARKT DER VLAANDEREN
fig 704A, Model
fig 564A, In het spoor van Serafinus
fig 155A, drawing, ISO
fig 310A, Architecture Noordwijk
fig 310B, Architecture Noordwijk
fig 276A, Structure WTC 1 +3 & +24
fig 276B, Structure WTC 1 +3 & +24
fig 276C, Structure WTC 1 +3 & +24
fig 276D, Structure WTC 1 +3 & +24
fig 276E, Structure WTC 1 +3 & +24
fig 276F, Structure WTC 1 +3 & +24
fig 276G, Structure WTC 1 +3 & +24
fig 276H, Structure WTC 1 +3 & +24
fig 276I, Structure WTC 1 +3 & +24
fig 276J, Structure WTC 1 +3 & +24
fig 276K, Structure WTC 1 +3 & +24
fig 436A, model, WTC remodel – final presentation
fig 436B, model, WTC remodel – final presentation
fig 436C, model, WTC remodel – final presentation
fig 436D, model, WTC remodel – final presentation
fig 181A, final drawings
fig 181B, drawing, final drawings
fig 795A, drawing, bOb Van Reeth, Circle vs Square, The basic operation in the design is playing the circle and parts of the circle off against the equality, the peace and quiet, and the infinite expandability and divisibility of the square and the grid. Because every square is otherwise perfectly divisible and fits in without a different figure ever being created. A square certainly does centre but at thesame time the four sides decentre and orient, the sides are just as strong as the cenre. A circle on the other hand radiates but centres to a much greater degree, detaches itself, and never shares its borderline with a second circle. It is enough to draw a circle in or around a square, or to construct a circle from an angle of a square, to obtain a dynamic heterogenous division of the plane with centred and non centred, single and complex planes, regular primary figures and secondary spaces, insides and outsides, direction.
fig 844A, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844B, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844C, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844D, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844E, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844F, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844G, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844H, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844I, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844J, model, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844K, model, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844L, model, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844M, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844N, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844O, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844P, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844Q, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844R, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 188A, porto class 17
fig 988A, Viaduct als groene as
fig 457A, Enclosed house
fig 171A, drawing, Analysis structure De Porre, Cantilever in concrete
fig 411A, Torre Velasca
fig 411B, Torre Velasca
fig 135A, model, Final model
fig 618A, U VYNCKIER
fig 618B, U VYNCKIER
fig 958A, FINAL DESIGN
fig 425A, first test extra facade
fig 921A, EL Beton A0 analyse
fig 78A, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78B, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78C, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78D, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 626A, drawing, Section of a Tulou, traditional housing in China
fig 626B, drawing, Section of a Tulou, traditional housing in China
fig 3A, drawing, Voorhaven Site, The column is constructed with leftovers from the world expo in Antwerp 1985
fig 3B, photo, Voorhaven Site
fig 3C, drawing, Voorhaven Site, how hot riveting is done.
fig 936A, photo, Visit dok brewing company, Bottler and fermenting silo's
fig 936B, photo, Visit dok brewing company, hopper and water boiler
fig 936C, photo, Visit dok brewing company, Storage tank warm water
fig 936D, photo, Visit dok brewing company, Heat exchanger
fig 768A, Erfgoeddepot Trezoor, Kortrijk
fig 971A, The Family – Isamu Noguchi (Photo by Ezra Stoller)
fig 781A, SUPERSTUDIO quaderna console tables for zanotta 1971
fig 495A, A110 – 2M wide cohousing
fig 790A, miro miro
fig 790B, miro miro
fig 318A, Axonometric WTC
fig 809A, V-Profiles used in the ceiling (lost formwork), V-Profile 1978
fig 223A, drawing, proces_23
fig 176A, FINAL MODEL
fig 176B, FINAL MODEL
fig 600A, photo, Recycled U, Een manier van bouwen die de aarde zo min mogelijk belast. Als schakel tussen wonen en industrie die de site verbindt.
fig 600B, Recycled U
fig 239A, PHOTO
fig 534A, photo, Rue Franklin 25bis, Paris – Auguste Perret
fig 838A, Becher Price
fig 978A, Kaduk…Kadukaduk…kadukaduk…kadukaduk…
fig 63A, Model tests
fig 468A, GEORGE & GILBERT
fig 468B, GEORGE & GILBERT
fig 720A, photo, Vynckier 2, Vynckier 2, Schets inkom
fig 668A, Structuur Manchester 2
fig 180A, model, Site de Porre – primary structure model, A
fig 691A, 3RROR cad to jpg
fig 666A, Site section Terminal
fig 42A, photo, Renovation factory Kotrijk
fig 42B, photo, Renovation factory Kotrijk
fig 42C, photo, Renovation factory Kotrijk
fig 42D, photo, Renovation factory Kotrijk
fig 522A, photo, Analyse Swiss Sound Box – Peter Zumthor, Swiss Sound Box - Peter Zumthor
fig 139A, DT
fig 139B, DT
fig 793A, Detail foto’s – ELbeton
fig 193A, meetings
fig 99A, Basic Concrete Prefab Construction, construction site
fig 99B, Basic Concrete Prefab Construction, Connection in the center of a diagonal buttress
fig 99C, Basic Concrete Prefab Construction, Top connection of a diagonal buttress
fig 99D, Basic Concrete Prefab Construction, Floor connection of a diagonal buttress
fig 99E, Basic Concrete Prefab Construction, prefab column and beam
fig 99F, Basic Concrete Prefab Construction, Columns with corbels and visible hole from weld plate cast into column for the beam connection.
fig 99G, Basic Concrete Prefab Construction, enfilade of the prefab system
fig 99H, Basic Concrete Prefab Construction, crane
fig 99I, Basic Concrete Prefab Construction, beam reinforcement
fig 280A, werfbezoek – ultiem grid 740 x 740
fig 280B, werfbezoek – ultiem grid 740 x 740
fig 149A, Sketches
fig 149B, Sketches
fig 353A, Vertical Garden WTC, “Hanging the stairs” Sketches
fig 12A, photo, Industrial Structure
fig 12B, photo, Industrial Structure
fig 575A, Digital masterplan, scale 1/1000
fig 199A, sketch
fig 156A, photo, research structure, A
fig 403A, model, Cathedrale Communale 1/200
fig 403B, model, Cathedrale Communale 1/200
fig 403C, model, Cathedrale Communale 1/200
fig 403D, model, Cathedrale Communale 1/200
fig 403E, model, Cathedrale Communale 1/200
fig 403F, model, Cathedrale Communale 1/200
fig 403G, model, Cathedrale Communale 1/200
fig 403H, model, Cathedrale Communale 1/200
fig 403I, model, Cathedrale Communale 1/200
fig 743A, STADSPARK VYNCKIER/ DE SCHIJF
fig 743B, STADSPARK VYNCKIER/ DE SCHIJF
fig 743C, STADSPARK VYNCKIER/ DE SCHIJF
fig 756A, drawing, Projection of chessboard grid on Vynckier site
fig 182A, drawing, Masterplan final site gentbrugge
fig 182B, drawing, Masterplan final site gentbrugge, coworking
fig 182C, drawing, Masterplan final site gentbrugge
fig 182D, photo, Masterplan final site gentbrugge
fig 182E, photo, Masterplan final site gentbrugge
fig 182F, photo, Masterplan final site gentbrugge
fig 911A, primary structure maquette
fig 911B, photo, primary structure maquette
fig 911C, photo, primary structure maquette
fig 911D, photo, primary structure maquette
fig 911E, photo, primary structure maquette
fig 207A, model
fig 359A, Structure underneath diving tank
fig 736A, drawing, Tulou, reference - China
fig 736B, model, Tulou, rammed earth and wood structure
fig 736C, model, Tulou, rammed earth and wood structure
fig 736D, model, Tulou, structure
fig 736E, model, Tulou, Process
fig 736F, photo, Tulou, reference - China
fig 736G, drawing, Tulou, rammed earth structure
fig 736H, drawing, Tulou, section
fig 736I, drawing, Tulou, Plan
fig 445A, Adjacent
fig 913A, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 913B, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 913C, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 549A, Parkeergebouw Ledeberg, Nieuw Parkeergebouw Ledeberg
fig 319A, exploded sokkel
fig 800A, Granulate Storage Shed, Axo
fig 993A, Plan Walkway
fig 993B, Plan Walkway
fig 993C, Plan Walkway
fig 993D, Plan Walkway
fig 518A, drawing, Kimbell Art Center
fig 518B, Kimbell Art Center
fig 526A, drawing, Sketch of Art & Architecture Building
fig 734A, Vynckier site, model
fig 294A, Structure Niv +27 WTC
fig 524A, ANALYSE Steilneset Memorial – PETER ZUMTHOR, Steilneset Memorial - Peter Zumthor
fig 1004A, End Presentation, Models
fig 1004B, End Presentation, Models
fig 1004C, End Presentation, Models
fig 172A, drawing, Research new structures in combination with existing
fig 172B, drawing, Research new structures in combination with existing
fig 172C, drawing, Research new structures in combination with existing, acoustic solutions - new vs. existing (2)
fig 172D, drawing, Research new structures in combination with existing
fig 172E, drawing, Research new structures in combination with existing
fig 172F, photo, Research new structures in combination with existing, A
fig 172G, photo, Research new structures in combination with existing, B
fig 172H, Research new structures in combination with existing, Fase 1
fig 172I, Research new structures in combination with existing, fase 3
fig 812A, Beton model y-kolom
fig 812B, Beton model y-kolom
fig 812C, Beton model y-kolom
fig 985A, drawing, Section Column
fig 419A, waffle slab
fig 419B, waffle slab
fig 32A, drawing, Hangar INCO, Exploded construction of the hangar
fig 32B, drawing, Hangar INCO, Composition detail of brick, concrete columns and plinth
fig 32C, Hangar INCO
fig 32D, Hangar INCO
fig 32E, photo, Hangar INCO, Skylight
fig 32F, photo, Hangar INCO, Skylight
fig 32G, photo, Hangar INCO, Concrete columns, laminated wooden beams
fig 32H, photo, Hangar INCO, Concrete columns & beams
fig 285A, sketch on existing plan
fig 257A, WTC beams
fig 845A, Hannelore Van Dijck – Primary Talks
fig 1011A, photo, Model 1/500 -1/50 mobility hub
fig 1011B, photo, Model 1/500 -1/50 mobility hub
fig 1011C, photo, Model 1/500 -1/50 mobility hub
fig 1011D, photo, Model 1/500 -1/50 mobility hub
fig 857A, Analyse
fig 857B, model, Analyse
fig 857C, Analyse
fig 514A, Werfbeeld 51 Rue Raynouard – Perret
fig 540A, Bambow bridge – Atelier Lai
fig 540B, Bambow bridge – Atelier Lai
fig 303A, atelier
fig 513A, Structural analysis, AFASIA, P. FLammer
fig 759A, Ghent expo
fig 556A, Model Engine Room
fig 556B, Model Engine Room
fig 582A, Proposal Facade Vynckier site
fig 186A, Model
fig 186B, Model
fig 186C, Model
fig 165A, analysing site Gents Bakkershuis
fig 242A, axonometric alejandra and joao
fig 368A, Structural model WTC brewery
fig 368B, Structural model WTC brewery
fig 289A, Louis Sullivan – The tall office building artistically considered
fig 306A, Site Visit 2
fig 306B, Site Visit 2
fig 306C, Site Visit 2
fig 306D, Site Visit 2
fig 8A, photo, FRAC, Dunkerque by Lacaton & Vasal, Frontal Facade, showing the old building and new 'copy' next to each other
fig 8B, photo, FRAC, Dunkerque by Lacaton & Vasal
fig 8C, photo, FRAC, Dunkerque by Lacaton & Vasal, The beautiful transparency of the skin invites the outside world in and ceases to be distant as an art institution might be. The shell does only what it is meant to do, protect its core from the outer elements. The glass and steel myth was reinterpreted and altered with a plastic and steel frame.
fig 8D, photo, FRAC, Dunkerque by Lacaton & Vasal, Steel connection between the old and new building.
fig 8E, photo, FRAC, Dunkerque by Lacaton & Vasal, The climactic gain from this greenhouse concept is an ingenious solution for the demand of more self-sufficient buildings and energy efficiency. The circulation spaces function as a buffer between the spaces and the one-layered shell.
fig 8F, photo, FRAC, Dunkerque by Lacaton & Vasal, Where the spaces themselves border the shell, at the upper level aswell as the vertical separation space between the 2 monoliths, another ingenious transparant envelope is applied. Convexly shaped hard plastic is placed in layers against eachother so an insulating layer of air is trapped inside this half orb space.
fig 8G, drawing, FRAC, Dunkerque by Lacaton & Vasal, Detailed section
fig 8H, drawing, FRAC, Dunkerque by Lacaton & Vasal, Front facade detail
fig 953A, onderzoek structuur – vorm – werking
fig 953B, onderzoek structuur – vorm – werking
fig 31A, photo, Silos, tanks & holders, Fully assembled
fig 31B, photo, Silos, tanks & holders, Positioning the different panels
fig 31C, photo, Silos, tanks & holders, Pre-asssembly of the different panels
fig 925A, JURY studio 21, Gent Wiedauwkaai
fig 925B, JURY studio 21, Gent Wiedauwkaai
fig 925C, JURY studio 21, Gent Wiedauwkaai
fig 925D, JURY studio 21, Gent Wiedauwkaai
fig 925E, JURY studio 21, Gent Wiedauwkaai
fig 925F, JURY studio 21, Gent Wiedauwkaai
fig 925G, JURY studio 21, Gent Wiedauwkaai
fig 925H, JURY studio 21, Gent Wiedauwkaai
fig 925I, JURY studio 21, Gent Wiedauwkaai
fig 925J, JURY studio 21, Gent Wiedauwkaai
fig 925K, JURY studio 21, Gent Wiedauwkaai
fig 925L, JURY studio 21, Gent Wiedauwkaai
fig 925M, JURY studio 21, Gent Wiedauwkaai
fig 925N, JURY studio 21, Gent Wiedauwkaai
fig 925O, JURY studio 21, Gent Wiedauwkaai
fig 925P, JURY studio 21, Gent Wiedauwkaai
fig 925Q, JURY studio 21, Gent Wiedauwkaai
fig 925R, JURY studio 21, Gent Wiedauwkaai
fig 925S, JURY studio 21, Gent Wiedauwkaai
fig 925T, JURY studio 21, Gent Wiedauwkaai
fig 925U, JURY studio 21, Gent Wiedauwkaai
fig 925V, JURY studio 21, Gent Wiedauwkaai
fig 925W, JURY studio 21, Gent Wiedauwkaai
fig 925X, JURY studio 21, Gent Wiedauwkaai
fig 925Y, JURY studio 21, Gent Wiedauwkaai
fig 925Z, JURY studio 21, Gent Wiedauwkaai
fig 925, JURY studio 21, Gent Wiedauwkaai
fig 925, JURY studio 21, Gent Wiedauwkaai
fig 925, JURY studio 21, Gent Wiedauwkaai
fig 925, JURY studio 21, Gent Wiedauwkaai
fig 925, JURY studio 21, Gent Wiedauwkaai
fig 238A, AXONOMETRIC, Jukyung & Uk
fig 38A, drawing, pergola without roof connection
fig 220A, drawing, proces_20
fig 25A, photo, Hole deck, Holedeck construction
fig 25B, model, Hole deck
fig 916A, THE RESULT, Plot 5, model 1/100 and 1/50 by Alexandre Moens
fig 916B, THE RESULT, Plot 5, model 1/100 and 1/50 by Alexandre Moens
fig 74A, model, MODEL – WASSERIJ DER VLAANDEREN, WASSERIJ DER VLAANDEREN
fig 179A, Primary & New
fig 229A, proces_31
fig 901A, I-joist factory
fig 441A, Visible structure
fig 620A, Structuur Schijf
fig 748A, photo, Vynckier 2, Principe, Maquette, Inkom
fig 409A, drawing, Detail
fig 942A, Axometrie
fig 304A, work documents
fig 124A, photo, Construction clt
fig 1005A, End Presentation, Drawings
fig 1005B, drawing, End Presentation, Drawings
fig 1005C, drawing, End Presentation, Drawings
fig 1005D, End Presentation, Drawings
fig 902A, drawing, I-joist factory
fig 51A, photo, Project Nonnemeersstraat, Ghent
fig 51B, drawing, Project Nonnemeersstraat, Ghent
fig 51C, drawing, Project Nonnemeersstraat, Ghent
fig 51D, drawing, Project Nonnemeersstraat, Ghent
fig 51E, drawing, Project Nonnemeersstraat, Ghent
fig 51F, drawing, Project Nonnemeersstraat, Ghent
fig 51G, drawing, Project Nonnemeersstraat, Ghent
fig 51H, drawing, Project Nonnemeersstraat, Ghent
fig 51I, drawing, Project Nonnemeersstraat, Ghent
fig 51J, drawing, Project Nonnemeersstraat, Ghent
fig 51K, photo, Project Nonnemeersstraat, Ghent
fig 51L, drawing, Project Nonnemeersstraat, Ghent
fig 51M, drawing, Project Nonnemeersstraat, Ghent
fig 51N, drawing, Project Nonnemeersstraat, Ghent
fig 51O, model, Project Nonnemeersstraat, Ghent
fig 51P, photo, Project Nonnemeersstraat, Ghent
fig 233A, model, Valentin Graf and Borja Fernandez
fig 696A, Axonometries CONNECTING GRID
fig 696B, Axonometries CONNECTING GRID
fig 933A, drawing, Final design plan and drawings
fig 933B, drawing, Final design plan and drawings
fig 933C, drawing, Final design plan and drawings
fig 933D, drawing, Final design plan and drawings
fig 933E, drawing, Final design plan and drawings
fig 933F, drawing, Final design plan and drawings
fig 933G, drawing, Final design plan and drawings
fig 970A, Viaduct Gent 2021
fig 970B, Viaduct Gent 2021, Constructie
fig 462A, Tree Tops 2.0
fig 84A, photo, Study models, Model 1/25
fig 84B, photo, Study models, Model 1/25
fig 84C, photo, Study models, Model 1/25
fig 145A, STRUCTURAL DESIGN PRINCIPLES
fig 145B, STRUCTURAL DESIGN PRINCIPLES
fig 145C, STRUCTURAL DESIGN PRINCIPLES
fig 145D, STRUCTURAL DESIGN PRINCIPLES
fig 145E, STRUCTURAL DESIGN PRINCIPLES
fig 145F, STRUCTURAL DESIGN PRINCIPLES
fig 145G, STRUCTURAL DESIGN PRINCIPLES
fig 622A, drawing, Construction in wood for Manchester
fig 98A, Quick steel
fig 221A, model, work in progress
fig 134A, model, Structure models
fig 273A, References Prestige Towers
fig 16A, photo, SITE VISIT, The large wooden beams ready to be installed.
fig 16B, photo, SITE VISIT, Prefabricated elements are fixed on the columns.
fig 16C, photo, SITE VISIT, Steel elements where the secondary wooden beams will be fixed on.
fig 16D, photo, SITE VISIT, The building of the extension of the store of Aveve.
fig 16E, photo, SITE VISIT, The existing store of Aveve.
fig 866A, THE RESULT, Plans, sections and axonometry with Alexandre Moens
fig 866B, THE RESULT, Plans, sections and axonometry with Alexandre Moens
fig 866C, drawing, THE RESULT, Plans, sections and axonometry with Alexandre Moens
fig 349A, Scheme structures silo
fig 349B, Scheme structures silo
fig 952A, MODEL 1/100
fig 952B, MODEL 1/100
fig 952C, MODEL 1/100
fig 952D, MODEL 1/100
fig 613A, Model of masterplan CONNECTING GRID 1.0
fig 311A, Analysing the parking lot
fig 311B, Analysing the parking lot
fig 311C, Analysing the parking lot
fig 311D, Analysing the parking lot
fig 311E, Analysing the parking lot
fig 604A, Masterplan V2
fig 604B, Masterplan V2
fig 174A, drawing, current structure analyse
fig 126A, URBAN FARM
fig 126B, URBAN FARM
fig 45A, drawing, shipping container
fig 45B, drawing, shipping container
fig 45C, drawing, shipping container
fig 217A, drawing, proces_17
fig 833A, drawing, section detail structure
fig 919A, EL Beton – model 1/20
fig 275A, Ceiling Infrastructure plan
fig 519A, The Smithsons’ New Brutalism
fig 249A, photo, working session
fig 616A, photo, SCHETSEN 1/04
fig 616B, SCHETSEN 1/04
fig 616C, photo, SCHETSEN 1/04
fig 616D, drawing, SCHETSEN 1/04
fig 579A, Mosterdfabriek Oudenaarde
fig 86A, photo, Wittemolenstraat, Sint – Amandsberg, OLYMPUS DIGITAL CAMERA
fig 86B, Wittemolenstraat, Sint – Amandsberg, OLYMPUS DIGITAL CAMERA
fig 859A, WOODPROTECT ; Storage of wooden sleepers
fig 67A, College Football Hall of Fame, Robert Venturi & Denise Scott Brown
fig 67B, College Football Hall of Fame, Robert Venturi & Denise Scott Brown
fig 200A, photo, Axonometry Limit – Axel and Luna :)
fig 253A, Working session
fig 807A, Vliegtuigloods Grimbergen
fig 363A, cathédrale communale work documents
fig 363B, cathédrale communale work documents
fig 732A, model, Project, Manchester Two
fig 732B, drawing, Project, Manchester Two
fig 732C, drawing, Project, Manchester Two
fig 732D, drawing, Project, Manchester Two
fig 732E, Project, Manchester Two
fig 398A, Brewery visit
fig 398B, Brewery visit
fig 259A, model detail
fig 623A, Masterplan level 1
fig 512A, model, END MODEL CNC
fig 512B, model, END MODEL CNC
fig 512C, END MODEL CNC
fig 941A, model, Analyse Picobello
fig 941B, model, Analyse Picobello
fig 941C, Analyse Picobello
fig 631A, Masterplan level 1
fig 535A, photo, Palais d’Iéna, Paris – Auguste Perret
fig 908A, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 908B, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 908C, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 908D, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 381A, ANALYSIS WTC
fig 381B, ANALYSIS WTC
fig 463A, drawing, hopvandenbrandenstraat.
fig 477A, Review Primary structure – Kanal Brussels, Processed with VSCO with m5 preset
fig 137A, model, photos models
fig 137B, photo, photos models
fig 137C, model, photos models
fig 137D, photos models
fig 137E, photos models
fig 674A, drawing, Langse snede
fig 272A, Zuidertoren
fig 272B, Zuidertoren
fig 272C, Zuidertoren
fig 15A, photo, SILOS, TANKS & HOLDERS, Rotating the panels allows vertical forces to be guided down
fig 15B, drawing, SILOS, TANKS & HOLDERS, Basic dimensions of a cold rolled steel silo panel
fig 675A, research existing structure
fig 675B, research existing structure
fig 675C, research existing structure
fig 675D, research existing structure
fig 355A, Notre-Dame in BXL?
fig 923A, Design Sections
fig 415A, model, werkmaquette
fig 415B, model, werkmaquette
fig 396A, drawing, Final plans
fig 291A, WTC I: Axo op 2 verdiepen
fig 327A, WTC – model
fig 327B, WTC – model
fig 787A, Mies van der Rohe – Farnsworth House – Hoekdetail
fig 19A, photo, SUPPORTING FACADE STRUCTURE, steel supporting structure
fig 219A, drawing, proces_19
fig 829A, Analyse EL beton – Detail dakspant 1
fig 142A, Urban design
fig 142B, Urban design
fig 216A, drawing, proces_13
fig 849A, Structure analysis Erfoeddepot Trezoor, Kortrijk
fig 849B, Structure analysis Erfoeddepot Trezoor, Kortrijk
fig 849C, Structure analysis Erfoeddepot Trezoor, Kortrijk
fig 292A, WTC NIV + 27
fig 444A, Old vs. new
fig 209A, drawing, proces_10
fig 251A, DEEP PLAN construction detail 1, structural detail 1
fig 449A, Repitition
fig 331A, REFERENTIE_1
fig 508A, model, DAUWSTRAAT MODEL
fig 508B, DAUWSTRAAT MODEL
fig 508C, DAUWSTRAAT MODEL
fig 508D, DAUWSTRAAT MODEL
fig 643A, MASTERPLAN VYNCKIER
fig 127A, model, Final
fig 127B, drawing, Final
fig 127C, drawing, Final
fig 959A, FINAL DESIGN
fig 104A, drawing, supporting points in sports
fig 104B, supporting points in sports
fig 104C, supporting points in sports
fig 18A, photo, Wood Hollow Core Slab
fig 18B, photo, Wood Hollow Core Slab
fig 900A, I-joist factory
fig 769A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 721A, photo, Vynckier 2, Vynckier 2, Principe gevel- en dakopbouw
fig 146A, Visit Industrial Natural stone factory
fig 146B, Visit Industrial Natural stone factory
fig 390A, Is It a Niemeyer?
fig 390B, Is It a Niemeyer?
fig 144A, structural options. Isolating a container outside
fig 144B, structural options. Isolating a container outside
fig 848A, Structure analysis Erfoeddepot Trezoor, Kortrijk
fig 362A, WTC 1 – model of mosque
fig 362B, WTC 1 – model of mosque
fig 861A, Circular Stacking ; 1/100 model
fig 861B, Circular Stacking ; 1/100 model
fig 861C, Circular Stacking ; 1/100 model
fig 861D, Circular Stacking ; 1/100 model
fig 861E, Circular Stacking ; 1/100 model
fig 77A, Concrete building elements
fig 77B, Concrete building elements
fig 77C, Concrete building elements
fig 77D, Concrete building elements
fig 77E, Concrete building elements
fig 77F, Concrete building elements
fig 77G, Concrete building elements
fig 77H, Concrete building elements
fig 29A, model, STEKO – Building Blocks, The basic elements of the STEKO® building system
fig 29B, photo, STEKO – Building Blocks
fig 29C, photo, STEKO – Building Blocks
fig 307A, STRUCTURE WTC
fig 307B, STRUCTURE WTC
fig 9A, photo, Getting some help, Getting some help.
fig 986A, photo, 1/5000 identiteit vlekken (studie)
fig 986B, photo, 1/5000 identiteit vlekken (studie)
fig 237A, final axonometry
fig 203A, sketch
fig 1009A, photo, Bernard Tshumi, Rotterdam Railway Tunnel Site via Event Cities
fig 731A, Primary Circles_Model
fig 954A, structuur – detail
fig 954B, structuur – detail
fig 954C, structuur – detail
fig 954D, structuur – detail
fig 794A, bOb van Reeth, House Van Roosmalen, design sketch
fig 842A, Chernobyl radar
fig 367A, Structural model WTC brewery
fig 367B, Structural model WTC brewery
fig 109A, photo, Japanese House, 1907, Wood construction by 'master carpenter' Nishida Isaburo
fig 588A, Vynckier Site, first proposal, sketches
fig 474A, vertrapping
fig 1008A, Superstudio
fig 159A, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159B, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159C, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159D, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159E, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159F, photo, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159G, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159H, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159I, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159J, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159K, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159L, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159M, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159N, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 33A, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre Gentbrugge - site
fig 33B, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre - Primary structure
fig 33C, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre Gentbrugge - Concrete ceiling
fig 33D, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre - fragment
fig 33E, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre - Concrete cantilever
fig 33F, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre Gentbrugge - steel truss
fig 505A, drawing, DAUWSTRAAT DETAILSECTION
fig 455A, depotdesign
fig 981A, Velsertunnel (A22) Ventilation Towers, NL
fig 599A, Proposal masterplan Vynckier site
fig 751A, model, Vynckier 2, Principe, Inkom
fig 922A, Design isometrie
fig 256A, drawing, Structural core
fig 256B, drawing, Structural core
fig 80A, drawing, Site analyse
fig 80B, drawing, Site analyse
fig 80C, drawing, Site analyse
fig 80D, drawing, Site analyse
fig 80E, drawing, Site analyse
fig 80F, drawing, Site analyse
fig 80G, drawing, Site analyse
fig 80H, drawing, Site analyse
fig 80I, drawing, Site analyse
fig 80J, drawing, Site analyse
fig 80K, drawing, Site analyse
fig 80L, drawing, Site analyse
fig 80M, drawing, Site analyse
fig 80N, drawing, Site analyse
fig 80O, drawing, Site analyse
fig 80P, drawing, Site analyse
fig 80Q, model, Site analyse
fig 80R, model, Site analyse
fig 80S, model, Site analyse
fig 80T, model, Site analyse
fig 602A, Superstudio, Adolfo Natalini, Monumento Continuo, 1969
fig 226A, drawing, proces_27
fig 525A, Analyse Allmannajuvet Zinc Mine Museum – Peter Zumthor, Allmannajuvet Zinc Mine Museum - Peter Zumthor
fig 949A, Analyse
fig 584A, drawing, VERTICAL FARMING WITH WATER PURIFICATION
fig 584B, photo, VERTICAL FARMING WITH WATER PURIFICATION
fig 365A, Bochten testen
fig 365B, Bochten testen
fig 365C, Bochten testen
fig 385A, CATHEDRALE COMMUNALE
fig 930A, Design model 1/100
fig 930B, Design model 1/100
fig 433A, finaal model
fig 433B, finaal model
fig 433C, finaal model
fig 97A, drawing, SITE & BUILDING ANALYSIS, Exploded view from different construction segments
fig 97B, SITE & BUILDING ANALYSIS, Detailed plan from below and above the ground
fig 195A, visits
fig 943A, Analyse Loods
fig 943B, model, Analyse Loods
fig 943C, drawing, Analyse Loods
fig 943D, drawing, Analyse Loods
fig 119A, model, Test model of 3 05 2017
fig 202A, WALL LIMIT AXONOMETRIC
fig 208A, drawing, proces_09
fig 328A, Werf station parking
fig 328B, Werf station parking, plan ondergrondse parking
fig 328C, Werf station parking, wapening om 4 bogen op aan te sluiten, door een fout is het beton te hoog gegoten waardoor alles terug is uitgekapt. Hierdoor komt de wapening in het beton bloot te liggen.
fig 328D, Werf station parking, beton voor de Kiss&Ride wordt gegoten.
fig 328E, Werf station parking, achteringang met een tijdelijke muur die door de uitsparingen makkelijk weggehaald kan worden.
fig 328F, Werf station parking, peilers uit gewapend beton waar het tunneldak op is gelegd. Hier komen 2 rijstroken.
fig 328G, Werf station parking, doorgang naar ondergrondse parking en naar afrit
fig 133A, photo, Final urban model
fig 133B, Final urban model
fig 133C, model, Final urban model
fig 194A, meetings
fig 825A, Structural Plan Pattyn Factory
fig 299A, WTC – plan section
fig 375A, STRUCTUREMODEL_SERVICEFLATS_1
fig 375B, STRUCTUREMODEL_SERVICEFLATS_1
fig 834A, model, Facq building model section, roller bridge
fig 152A, Reference: ALEXANDER BRODSKY 95 DEGREES RESTAURANT
fig 152B, photo, Reference: ALEXANDER BRODSKY 95 DEGREES RESTAURANT
fig 152C, photo, Reference: ALEXANDER BRODSKY 95 DEGREES RESTAURANT
fig 563A, Photo of of interior staircase at building 4, Vynckier site
fig 467A, werf, Aldi. Sint-Niklaas
fig 467B, werf, Aldi. Sint-Niklaas
fig 210A, drawing, proces_11
fig 290A, Reference: Standard Bank Centre – Hentrich, Petschnigg & Partners ( 1970)
fig 450A, Collage Gilbert and Georges
fig 948A, Analyse
fig 82A, model, Analysis structure “De Porre”, Part of structure with cantilever
fig 82B, Analysis structure “De Porre”, Part of structure with cantilever - top
fig 82C, Analysis structure “De Porre”, Part of structure with cantilever
fig 479A, work in progress
fig 479B, work in progress
fig 434A, MAQUETTE_WTC_ONTWERP
fig 434B, MAQUETTE_WTC_ONTWERP
fig 434C, MAQUETTE_WTC_ONTWERP
fig 434D, MAQUETTE_WTC_ONTWERP
fig 434E, MAQUETTE_WTC_ONTWERP
fig 300A, Basiliek van Koekelberg
fig 300B, Basiliek van Koekelberg
fig 197A, work in progress … axonometry
fig 35A, drawing, Floor systems of bricks
fig 35B, drawing, Floor systems of bricks
fig 35C, drawing, Floor systems of bricks
fig 35D, model, Floor systems of bricks
fig 325A, work documents 20180417
fig 325B, work documents 20180417
fig 325C, work documents 20180417
fig 458A, Marc-Antoine Laugier ‘Essay on Architecture’
fig 458B, Marc-Antoine Laugier ‘Essay on Architecture’
fig 358A, Detailing sketches
fig 836A, drawing, Facq building, concrete detail with BSF-connection
fig 827A, Facade Pattyn Factory
fig 827B, Facade Pattyn Factory
fig 801A, photo, storage for granulates, next to concrete plant, facade
fig 801B, drawing, storage for granulates, next to concrete plant, section
fig 531A, Schets, demonteerbare structuur, Jean Prouvé
fig 733A, Primaru Circles_photos
fig 274A, Welkom in de Noord-wijk
fig 274B, Welkom in de Noord-wijk
fig 274C, Welkom in de Noord-wijk
fig 274D, Welkom in de Noord-wijk
fig 286A, sketch on existing plan
fig 726A, stil leven de werf
fig 726B, stil leven de werf
fig 726C, stil leven de werf
fig 726D, stil leven de werf
fig 726E, stil leven de werf
fig 726F, stil leven de werf
fig 726G, stil leven de werf
fig 726H, stil leven de werf
fig 515A, space and event
fig 945A, Onderzoek industriebouw
fig 945B, Onderzoek industriebouw
fig 945C, Onderzoek industriebouw
fig 637A, Masterplan model
fig 17A, photo, SITE VISIT °2, On top you can see the combination of the concrete columns with the steel trusses.
fig 17B, photo, SITE VISIT °2, Prefabricated concrete elements fits perfectly in each other.
fig 17C, photo, SITE VISIT °2, The holes in the beams are made to put ducts through them.
fig 17D, photo, SITE VISIT °2, Prefabricated concrete elements fits perfectly in each other.
fig 17E, photo, SITE VISIT °2, Prefabricated beams and columns with on top the prefabricated vaults.
fig 17F, photo, SITE VISIT °2, The structure is filled up with brick between the columns.
fig 17G, photo, SITE VISIT °2, The prefabricated vaults.
fig 17H, photo, SITE VISIT °2, Against the primary structure, facade elements are fixed.
fig 189A, MAIN PLAN
fig 711A, photo, Vynckier, Masterplan, Zicht op Manchester 1 en overdekte markt
fig 218A, drawing, proces_18
fig 741A, drawing, STADSPARK VYNCKIER/ DE SCHIJF
fig 741B, STADSPARK VYNCKIER/ DE SCHIJF
fig 741C, STADSPARK VYNCKIER/ DE SCHIJF
fig 741D, STADSPARK VYNCKIER/ DE SCHIJF
fig 741E, STADSPARK VYNCKIER/ DE SCHIJF
fig 741F, STADSPARK VYNCKIER/ DE SCHIJF
fig 741G, STADSPARK VYNCKIER/ DE SCHIJF
fig 741H, STADSPARK VYNCKIER/ DE SCHIJF
fig 741I, STADSPARK VYNCKIER/ DE SCHIJF
fig 741J, STADSPARK VYNCKIER/ DE SCHIJF
fig 741K, STADSPARK VYNCKIER/ DE SCHIJF
fig 741L, STADSPARK VYNCKIER/ DE SCHIJF
fig 95A, Tube and Coupler Scaffolds
fig 95B, Tube and Coupler Scaffolds
fig 95C, Tube and Coupler Scaffolds
fig 95D, Tube and Coupler Scaffolds
fig 95E, Tube and Coupler Scaffolds
fig 95F, Tube and Coupler Scaffolds
fig 937A, drawing, Jury 27mei2021
fig 937B, Jury 27mei2021
fig 937C, Jury 27mei2021
fig 937D, Jury 27mei2021
fig 937E, Jury 27mei2021
fig 924A, Design facades
fig 650A, Building shed structure new addition
fig 968A, Bedrijfsverzamelgebouw
fig 968B, Bedrijfsverzamelgebouw
fig 968C, Bedrijfsverzamelgebouw
fig 625A, model, De Schijf
fig 625B, model, De Schijf
fig 64A, DOME – EPS + SPRAYED CONCRETE, DOME - EPS + SPRAYED CONCRETE
fig 64B, DOME – EPS + SPRAYED CONCRETE
fig 64C, DOME – EPS + SPRAYED CONCRETE
fig 64D, DOME – EPS + SPRAYED CONCRETE
fig 64E, DOME – EPS + SPRAYED CONCRETE
fig 64F, DOME – EPS + SPRAYED CONCRETE
fig 64G, DOME – EPS + SPRAYED CONCRETE
fig 568A, photo, WATER TOWER, Public square as entrance.
fig 568B, photo, WATER TOWER, Manchester's are for living and the heart of industry (water tower) between them.
fig 287A, WTC 1 axo tetris
fig 698A, Masterplan
fig 698B, Masterplan
fig 491A, drawing, Betonnen wafelstructuur
fig 516A, Column Peter Märkli
fig 811A, Detail betonnen loods Ieper
fig 811B, Detail betonnen loods Ieper
fig 112A, photo, Hans Chr. Hansen, Amager Koblingsstation, Facade detail
fig 112B, photo, Hans Chr. Hansen, Amager Koblingsstation
fig 112C, photo, Hans Chr. Hansen, Amager Koblingsstation
fig 847A, drawing, Analysis aircraft shed
fig 847B, drawing, Analysis aircraft shed
fig 847C, drawing, Analysis aircraft shed
fig 847D, drawing, Analysis aircraft shed
fig 847E, drawing, Analysis aircraft shed
fig 847F, drawing, Analysis aircraft shed
fig 729A, model, Project, The Modern Tulou
fig 729B, model, Project, The Modern Tulou
fig 729C, model, Project, The Modern Tulou
fig 729D, model, Project, The Modern Tulou
fig 729E, drawing, Project, The Modern Tulou
fig 729F, drawing, Project, The Modern Tulou
fig 729G, drawing, Project, The Modern Tulou
fig 729H, model, Project, The Modern Tulou
fig 729I, model, Project, The Modern Tulou
fig 764A, Analyse Robert Venturi en Denise Scott Brown, Sainsbury Wing National Gallery
fig 764B, Analyse Robert Venturi en Denise Scott Brown, Sainsbury Wing National Gallery
fig 764C, Analyse Robert Venturi en Denise Scott Brown, Sainsbury Wing National Gallery
fig 48A, model vs Spa reine
fig 324A, werfbezoek
fig 324B, werfbezoek
fig 324C, werfbezoek
fig 72A, drawing, Structure of the big warehouse on docks site
fig 456A, Enclosed house
fig 252A, Pillar Catalogue
fig 591A, Masterplan Vynckiersite Gent
fig 591B, Masterplan Vynckiersite Gent
fig 591C, Masterplan Vynckiersite Gent
fig 785A, Mies van der Rohe – Crown Hall – Isometrie
fig 443A, VERNACULAR
fig 185A, DECORMAQUETTE
fig 364A, Axo volumes
fig 364B, Axo volumes
fig 557A, section engine room archive
fig 49A, Model #2
fig 931A, Design model 1/50
fig 931B, Design model 1/50
fig 758A, warehouse Zoutman ghent
fig 758B, warehouse Zoutman ghent
fig 917A, industrial buildings, grafted onto rammed earth wall with common functions
fig 917B, industrial buildings, grafted onto rammed earth wall with common functions
fig 917C, industrial buildings, grafted onto rammed earth wall with common functions
fig 917D, industrial buildings, grafted onto rammed earth wall with common functions
fig 917E, industrial buildings, grafted onto rammed earth wall with common functions
fig 143A, structural color
fig 143B, structural color
fig 351A, WERKMAQUETTE_PLINT
fig 723A, Vynckier Site Saw-tooth roof
fig 723B, Vynckier Site Saw-tooth roof
fig 723C, Vynckier Site Saw-tooth roof
fig 723D, Vynckier Site Saw-tooth roof
fig 723E, Vynckier Site Saw-tooth roof
fig 723F, Vynckier Site Saw-tooth roof
fig 723G, Vynckier Site Saw-tooth roof
fig 55A, section draft
fig 499A, Housing tower – AXO
fig 658A, future for the fireplace
fig 1007A, Bas Princen
fig 13A, photo, Arrival_Tower
fig 41A, drawing, Steel structure
fig 41B, drawing, Steel structure
fig 41C, drawing, Steel structure
fig 41D, drawing, Steel structure
fig 551A, Vynckier Manchester I Foundation
fig 749A, photo, Vynckier 2, Principe oud en nieuw, Maquette
fig 627A, Vynckier 2
fig 595A, The Brewing Process
fig 538A, ECAM – Agwa Architects
fig 538B, ECAM – Agwa Architects
fig 802A, Briona 72
fig 559A, Machinekamer Vynckier site
fig 753A, detail schetsen
fig 753B, detail schetsen
fig 753C, detail schetsen
fig 753D, detail schetsen
fig 753E, detail schetsen
fig 753F, detail schetsen
fig 346A, Site visite Orsi Academy
fig 346B, Site visite Orsi Academy
fig 346C, Site visite Orsi Academy
fig 346D, Site visite Orsi Academy
fig 346E, Site visite Orsi Academy
fig 346F, Site visite Orsi Academy
fig 346G, Site visite Orsi Academy
fig 346H, Site visite Orsi Academy
fig 346I, Site visite Orsi Academy
fig 346J, Site visite Orsi Academy
fig 346K, Site visite Orsi Academy
fig 346L, Site visite Orsi Academy
fig 1020A, photo, conceptual text
fig 840A, Becher prize
fig 840B, Becher prize
fig 603A, stay safe
fig 341A, Axo concrete factory
fig 6A, drawing, Drawing connection of steel structure
fig 6B, drawing, Drawing connection of steel structure
fig 740A, photo, Jubileumlaan, construction soilmixwall
fig 651A, Circle Building section
fig 260A, REA new ramp
fig 372A, cathédrale communale work documents
fig 372B, cathédrale communale work documents
fig 228A, proces_30
fig 46A, drawing, masterplan site gentbrugge
fig 46B, drawing, masterplan site gentbrugge
fig 46C, photo, masterplan site gentbrugge
fig 974A, photo, Oosterweel verbinding, construction site
fig 974B, photo, Oosterweel verbinding, construction site
fig 974C, photo, Oosterweel verbinding, construction site
fig 992A, Viaduct Gentbrugge
fig 432A, FINAL MODEL – JURY
fig 432B, FINAL MODEL – JURY
fig 432C, FINAL MODEL – JURY
fig 432D, FINAL MODEL – JURY
fig 432E, FINAL MODEL – JURY
fig 432F, FINAL MODEL – JURY
fig 432G, FINAL MODEL – JURY
fig 432H, FINAL MODEL – JURY
fig 103A, RECTOLIGHT
fig 366A, Opwervendag Nemo link
fig 366B, Opwervendag Nemo link
fig 366C, Opwervendag Nemo link
fig 366D, Opwervendag Nemo link
fig 366E, Opwervendag Nemo link
fig 565A, Vynckier oude luchtfoto
fig 320A, exploded toren
fig 83A, drawing, SITE ANALYSE
fig 83B, drawing, SITE ANALYSE
fig 83C, drawing, SITE ANALYSE
fig 76A, Project Kievit
fig 76B, Project Kievit
fig 76C, Project Kievit
fig 76D, Project Kievit
fig 37A, drawing, corner of the sport fence
fig 973A, bOb Van Reeth, House Botte, 1968-70
fig 122A, Structure site Nieuwevaart Gent
fig 122B, Structure site Nieuwevaart Gent
fig 856A, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856B, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 856C, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856D, photo, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856E, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856F, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856G, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856H, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 856I, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 856J, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 856K, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 856L, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856M, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856N, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856O, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856P, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 856Q, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 856R, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 335A, REFERENTIE_3
fig 81A, drawing, ANALYSE EXISTING STRUCTURES
fig 43A, photo, Hot Rivet, knooppunt staalstructuur
fig 52A, CONSTRUCTION SITE
fig 345A, La Fábrica – Ricardo Bofill
fig 965A, omgevings maquette voorontwerp
fig 965B, omgevings maquette voorontwerp
fig 192A, sketch
fig 393A, model, Cathedrale Communale
fig 393B, model, Cathedrale Communale
fig 393C, model, Cathedrale Communale
fig 393D, model, Cathedrale Communale
fig 393E, model, Cathedrale Communale
fig 393F, model, Cathedrale Communale
fig 393G, model, Cathedrale Communale
fig 150A, Composite steel columns
fig 157A, model masterplan
fig 544A, Bijgebouw Manchester 1
fig 298A, WTC axo concepts
fig 719A, photo, Vynckier 2, Vynckier 2, Snede
fig 852A, MAISTER HEADQ., concrete pink architecture facade
fig 413A, Final design detail
fig 413B, Final design detail
fig 612A, drawing, Section connection Manchester and CONNECTING GRID 1.0
fig 261A, drawing, WTC_subtraction, WTC_subtraction
fig 261B, drawing, WTC_subtraction, WTC_axonometry
fig 111A, ComFlor® 51+
fig 111B, model, ComFlor® 51+
fig 111C, photo, ComFlor® 51+
fig 183A, Structural Analysis
fig 183B, Structural Analysis
fig 183C, Structural Analysis
fig 183D, Structural Analysis
fig 183E, Structural Analysis
fig 183F, Structural Analysis
fig 183G, Structural Analysis
fig 183H, Structural Analysis
fig 183I, drawing, Structural Analysis
fig 183J, Structural Analysis
fig 183K, Structural Analysis
fig 590A, masterplan
fig 255A, WTC pillar dimensions
fig 792A, EL Beton – Structuur plan
fig 799A, analysis facade
fig 501A, Section A110
fig 918A, Design model 1/100
fig 918B, Design model 1/100
fig 918C, Design model 1/100
fig 23A, photo, Poco Loco – Fully automatic warehouse, View from the street
fig 23B, photo, Poco Loco – Fully automatic warehouse, section build on the ground
fig 23C, photo, Poco Loco – Fully automatic warehouse, connection of 2 different sections
fig 23D, photo, Poco Loco – Fully automatic warehouse, reinforcement for windloads
fig 23E, photo, Poco Loco – Fully automatic warehouse, connection
fig 23F, photo, Poco Loco – Fully automatic warehouse, detail of a steel beam
fig 23G, photo, Poco Loco – Fully automatic warehouse, reinforcement on the top for the windloads
fig 94A, INDUSTRIAL CONSTRUCTION SITE, Prefab structure
fig 94B, INDUSTRIAL CONSTRUCTION SITE, Two truss crossing
fig 94C, INDUSTRIAL CONSTRUCTION SITE, Cross bracing of the structure
fig 994A, Hangend gebouw onder viaduct
fig 994B, Hangend gebouw onder viaduct
fig 994C, Hangend gebouw onder viaduct
fig 994D, Hangend gebouw onder viaduct
fig 994E, Hangend gebouw onder viaduct
fig 96A, mazda site koopvaardijlaan, Drawing of the interior structure on the exterior wall. Also the remnants of a connected wooden building that burned down in the 1970's is still visible in the drawing.
fig 96B, mazda site koopvaardijlaan, cast concrete column
fig 96C, mazda site koopvaardijlaan, View towards aisle on the side of the tracks.
fig 96D, mazda site koopvaardijlaan
fig 96E, mazda site koopvaardijlaan
fig 96F, mazda site koopvaardijlaan
fig 96G, mazda site koopvaardijlaan
fig 96H, mazda site koopvaardijlaan
fig 465A, Collage Rules
fig 317A, Lina Bo Bardi MASP under construction
fig 777A, photo, Eames Case Study House 8
fig 406A, drawing, Facade
fig 246A, Axonometria
fig 642A, PALACE OF LABOUR, TURIN, 1961
fig 660A, working in quarantaine
fig 947A, Analyse
fig 947B, Analyse
fig 947C, Analyse
fig 947D, Analyse
fig 947E, Analyse
fig 573A, Model of vision on masterplan, scale 1/1000
fig 928A, Design spaces
fig 928B, Design spaces
fig 928C, Design spaces
fig 315A, Tetris Within A Tetris
fig 282A, werfbezoek – zettingsvoegen
fig 204A, meetings, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 1000A, Foto
fig 284A, werfbezoek – kraan in liftschacht
fig 107A, drawing, details in color
fig 107B, details in color
fig 107C, details in color
fig 107D, details in color
fig 107E, details in color
fig 107F, drawing, details in color
fig 964A, interieur render voorontwerp
fig 750A, photo, Vynckier 2, Principe authentieke en groene gevel, Maquette
fig 649A, Building shed structure axonometric
fig 523A, Photo during construction – Healey Guest House – ‘Cocoon House’
fig 555A, Vynckier
fig 555B, Vynckier
fig 337A, Ingang wtc via kern
fig 408A, drawing, Sfeer
fig 408B, drawing, Sfeer
fig 408C, drawing, Sfeer
fig 395A, model, Small 1/200 scale model
fig 679A, 27/05
fig 679B, 27/05
fig 679C, 27/05
fig 679D, drawing, 27/05
fig 679E, model, 27/05
fig 679F, model, 27/05
fig 679G, drawing, 27/05
fig 679H, drawing, 27/05
fig 679I, 27/05
fig 679J, drawing, 27/05
fig 679K, drawing, 27/05
fig 850A, Structure analysis Erfoeddepot Trezoor, Kortrijk
fig 678A, 27/05
fig 678B, 27/05
fig 678C, 27/05
fig 678D, drawing, 27/05
fig 678E, model, 27/05
fig 678F, model, 27/05
fig 678G, 27/05
fig 678H, drawing, 27/05
fig 678I, drawing, 27/05
fig 678J, 27/05
fig 678K, drawing, 27/05
fig 678L, drawing, 27/05
fig 20A, drawing, stabilizing structural systems, different ways to stabilize structure
fig 371A, Research roof structure diving tank
fig 371B, Research roof structure diving tank
fig 70A, photo, Pictures Nonnemeersstraat, Ghent
fig 70B, photo, Pictures Nonnemeersstraat, Ghent
fig 1A, drawing, STEEL JOINT
fig 558A, inplantingsmaquette, burst
fig 235A, model, Laia Bonet and Charlette Frémont
fig 414A, omgeving analyse
fig 414B, drawing, omgeving analyse
fig 414C, drawing, omgeving analyse
fig 414D, drawing, omgeving analyse
fig 414E, drawing, omgeving analyse
fig 475A, Wachtstaven
fig 392A, model, Cathedrale Communale
fig 392B, model, Cathedrale Communale
fig 392C, model, Cathedrale Communale
fig 392D, model, Cathedrale Communale
fig 392E, model, Cathedrale Communale
fig 392F, model, Cathedrale Communale
fig 392G, model, Cathedrale Communale
fig 392H, model, Cathedrale Communale
fig 392I, model, Cathedrale Communale
fig 506A, drawing, PICARDSTRAAT DETAILSECTION
fig 354A, WERKMAQUETTE_3.3_BUREN
fig 106A, drawing, SITE
fig 106B, drawing, SITE
fig 572A, les 18/03
fig 572B, drawing, les 18/03
fig 572C, drawing, les 18/03
fig 706A, photo, Vynckier, Masterplan, Functies
fig 47A, drawing, Every Big Box has its structure
fig 47B, drawing, Every Big Box has its structure
fig 173A, model, model analyse
fig 577A, Vynckier 5
fig 410A, axo details
fig 410B, drawing, axo details
fig 459A, House Botte – bOb Van Reeth
fig 863A, Circular Stacking ; Stacked roof detail
fig 858A, Concrete stacking blocks ; variations in form and size
fig 1014A, photo, Plan 1/500 residential
fig 222A, model, proces_22
fig 323A, Werfbezoek
fig 323B, Werfbezoek
fig 323C, Werfbezoek
fig 323D, Werfbezoek
fig 323E, Werfbezoek
fig 676A, model, Dwarse snede woning
fig 175A, drawing, Project BOMA
fig 175B, drawing, Project BOMA
fig 175C, drawing, Project BOMA
fig 175D, drawing, Project BOMA
fig 175E, drawing, Project BOMA
fig 175F, drawing, Project BOMA
fig 175G, drawing, Project BOMA
fig 175H, Project BOMA
fig 305A, Site Visit 1
fig 305B, Site Visit 1
fig 305C, Site Visit 1
fig 305D, Site Visit 1
fig 305E, Site Visit 1
fig 705A, photo, Vynckier, Masterplan, Vooraanzicht maquette
fig 382A, WTC EXISTING STRUCTURE
fig 466A, belibel
fig 488A, detail – wood & wood connection
fig 488B, detail – wood & wood connection
fig 488C, detail – wood & wood connection
fig 808A, Ruff Collage | Admisol, Toonzaal + woning | Luc Van Landuyt | 1978
fig 998A, End Presentation, Site Model
fig 336A, Werkmaquette
fig 405A, drawing, SECTION_BREWERY_AA’
fig 670A, drawing, Masterplan
fig 961A, FINAL DESIGN
fig 266A, WTC Massive Model
fig 639A, Staal-beton kolom
fig 639B, Staal-beton kolom
fig 138A, Sint – Amandsberg site, Gent. Details
fig 386A, CATHEDRALE COMMUNALE_PROGRAM
fig 386B, CATHEDRALE COMMUNALE_PROGRAM
fig 376A, Wooden box in steel structure
fig 281A, werfbezoek – fout wapeningsstaal
fig 113A, drawing, Site Ijzerweglaan, City fabric
fig 113B, photo, Site Ijzerweglaan, Island cut off by the river Schelde and the E17 Viaduct
fig 113C, model, Site Ijzerweglaan
fig 113D, drawing, Site Ijzerweglaan, Different existing typologies
fig 113E, photo, Site Ijzerweglaan
fig 113F, photo, Site Ijzerweglaan
fig 113G, photo, Site Ijzerweglaan, A fence between a small neigborhood park and the 13.000 m2 site
fig 113H, photo, Site Ijzerweglaan
fig 113I, Site Ijzerweglaan
fig 113J, photo, Site Ijzerweglaan, Volvo seen by Volvo
fig 343A, Open structure + circulation
fig 22A, photo, factory Gentbrugge – Site, wooden beam pattern
fig 22B, drawing, factory Gentbrugge – Site
fig 22C, drawing, factory Gentbrugge – Site
fig 22D, drawing, factory Gentbrugge – Site, masonry
fig 22E, drawing, factory Gentbrugge – Site, existing structure
fig 543A, Constructie detail werfbezoek
fig 65A, test model: terraces &facade
fig 682A, Maquette Masterplan
fig 293A, Core WTC
fig 950A, Omgeving isometrie
fig 950B, Omgeving isometrie
fig 269A, Shanghai Tower
fig 927A, Vertical farming
fig 927B, Vertical farming
fig 486A, Structure Beekstraat
fig 771A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 58A, Model #1
fig 58B, Model #1
fig 860A, WIEDAUWKAAI ; 1/500 model
fig 860B, WIEDAUWKAAI ; 1/500 model
fig 989A, Walkway
fig 989B, Walkway
fig 989C, Walkway
fig 560A, Section Vynckier Machinekamer
fig 442A, George&Gilbert
fig 430A, model, jury WTC
fig 430B, model, jury WTC
fig 430C, model, jury WTC
fig 1019A, photo, Work on view at LifeCycles event 2022
fig 1019B, photo, Work on view at LifeCycles event 2022
fig 447A, photo, Collage geïnspireerd op Gilbert & George
fig 766A, drawing, Città Analoga, Aldo Rossi
fig 854A, POCO LOCO FACTORY
fig 418A, drawing, snede
fig 665A, Plan 1 terminal
fig 30A, photo, Silos, tanks & holders, Bottom-up construction
fig 30B, photo, Silos, tanks & holders, Interior view
fig 30C, photo, Silos, tanks & holders, Assembling the topcover
fig 30D, photo, Silos, tanks & holders, Surreal image
fig 1006A, model, Gate Building, Gate Building
fig 1006B, Gate Building, Gate Building
fig 1006C, Gate Building, axis
fig 1006D, Gate Building, Bridge Structure
fig 755A, photo, Eve Babitz playing chess with Marcel Duchamp, Pasadena 1963
fig 1010A, model, Living Above The Road 12-01-22
fig 1010B, model, Living Above The Road 12-01-22
fig 1010C, model, Living Above The Road 12-01-22
fig 1010D, model, Living Above The Road 12-01-22
fig 1010E, model, Living Above The Road 12-01-22
fig 708A, photo, Vynckier, Masterplan, Maquette
fig 610A, Masterplan 25/03 & 1/04 2020
fig 633A, Idea Superstudio on ConnectingGrid
fig 69A, models
fig 996A, photo, End Presentation, Axonometric Drawing
fig 545A, Manchester building – structure
fig 545B, Manchester building – structure
fig 469A, photo, workshop
fig 469B, workshop
fig 818A, axo, STORAGE FOR GRANULATES, NEXT TO CONCRETE PLANT
fig 27A, drawing, Types of steel trusses
fig 938A, Luminus
fig 832A, model, foto maquette
fig 529A, photo, Vynckier 1981-94
fig 529B, photo, Vynckier 1981-94
fig 624A, Connecting grid model
fig 789A, Detail foto hoekprofiel – Lake Short Drive – Mies VDR
fig 28A, photo, Industrial warehouse, connection between foundation and column
fig 28B, photo, Industrial warehouse, connection between column and beam
fig 28C, photo, Industrial warehouse
fig 28D, photo, Industrial warehouse, connection between beams
fig 28E, photo, Industrial warehouse, connection between column and beam
fig 28F, photo, Industrial warehouse
fig 592A, drawing, 25/03
fig 592B, drawing, 25/03
fig 592C, model, 25/03
fig 461A, Structure, Libelco
fig 461B, Structure, Libelco
fig 502A, Axonometric NG17
fig 910A, Analyse Picobello Roeselare
fig 910B, Analyse Picobello Roeselare
fig 745A, STADSPARK VYNCKIER/ DE SCHIJF
fig 745B, STADSPARK VYNCKIER/ DE SCHIJF
fig 745C, STADSPARK VYNCKIER/ DE SCHIJF
fig 745D, STADSPARK VYNCKIER/ DE SCHIJF
fig 745E, STADSPARK VYNCKIER/ DE SCHIJF
fig 745F, STADSPARK VYNCKIER/ DE SCHIJF
fig 745G, STADSPARK VYNCKIER/ DE SCHIJF
fig 234A, model, João Branco and Alejandra Calvo
fig 268A, Knights of Columbus
fig 268B, Knights of Columbus
fig 268C, Knights of Columbus
fig 178A, model, Final model, B, 1:50
fig 999A, Foto opdracht
fig 999B, Foto opdracht
fig 999C, Foto opdracht
fig 999D, Foto opdracht
fig 999E, Foto opdracht
fig 999F, Foto opdracht
fig 483A, Stut-opties
fig 344A, How to become a Niemeyer
fig 131A, Blekerijstraat site photos
fig 131B, Blekerijstraat site photos
fig 131C, Blekerijstraat site photos
fig 131D, Blekerijstraat site photos
fig 716A, axo existing structure
fig 596A, Masterplan Model 2
fig 190A, meetings
fig 737A, model, Site model, site Vynkier
fig 778A, photo, Eames Case Study House 8, Interior steel Truss, aesthetics of prefab
fig 837A, BSF-Connection
fig 530A, Werf, Temporary school of Villejuif, Jean Prouvé
fig 728A, primary structure
fig 728B, primary structure
fig 728C, primary structure
fig 728D, primary structure
fig 431A, CATHEDRALE COMMUNALE_JURY
fig 431B, CATHEDRALE COMMUNALE_JURY
fig 431C, CATHEDRALE COMMUNALE_JURY
fig 431D, CATHEDRALE COMMUNALE_JURY
fig 431E, CATHEDRALE COMMUNALE_JURY
fig 431F, CATHEDRALE COMMUNALE_JURY
fig 431G, CATHEDRALE COMMUNALE_JURY
fig 431H, CATHEDRALE COMMUNALE_JURY
fig 431I, CATHEDRALE COMMUNALE_JURY
fig 431J, CATHEDRALE COMMUNALE_JURY
fig 431K, CATHEDRALE COMMUNALE_JURY
fig 431L, CATHEDRALE COMMUNALE_JURY
fig 39A, drawing, Japan wood connection in chamonix
fig 460A, bOb
fig 460B, bOb
fig 460C, bOb
fig 460D, bOb
fig 464A, l’unionfaitlaforce
fig 1001A, Jury in progress
fig 1001B, Jury in progress
fig 1001C, Jury in progress
fig 1001D, Jury in progress
fig 1001E, Jury in progress
fig 1022A, drawing, conceptual scheme
fig 687A, research existing structure
fig 141A, Site visit Sint-Martens-Latem
fig 141B, Site visit Sint-Martens-Latem
fig 141C, Site visit Sint-Martens-Latem
fig 141D, Site visit Sint-Martens-Latem
fig 141E, Site visit Sint-Martens-Latem
fig 141F, Site visit Sint-Martens-Latem
fig 141G, Site visit Sint-Martens-Latem
fig 703A, De Nieuwe Vynckier – Incubator – Passerel
fig 510A, final jury @ KANAL bxl
fig 510B, final jury @ KANAL bxl
fig 510C, final jury @ KANAL bxl
fig 510D, final jury @ KANAL bxl
fig 510E, final jury @ KANAL bxl
fig 510F, final jury @ KANAL bxl
fig 510G, final jury @ KANAL bxl
fig 510H, final jury @ KANAL bxl
fig 510I, final jury @ KANAL bxl
fig 510J, final jury @ KANAL bxl
fig 510K, final jury @ KANAL bxl
fig 510L, final jury @ KANAL bxl
fig 510M, final jury @ KANAL bxl
fig 510N, final jury @ KANAL bxl
fig 510O, final jury @ KANAL bxl
fig 510P, final jury @ KANAL bxl
fig 510Q, final jury @ KANAL bxl
fig 510R, final jury @ KANAL bxl
fig 510S, final jury @ KANAL bxl
fig 510T, final jury @ KANAL bxl
fig 510U, final jury @ KANAL bxl
fig 510V, final jury @ KANAL bxl
fig 510W, final jury @ KANAL bxl
fig 510X, final jury @ KANAL bxl
fig 510Y, final jury @ KANAL bxl
fig 510Z, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 725A, Vynckier Circle
fig 725B, Vynckier Circle
fig 725C, Vynckier Circle
fig 742A, STADSPARK VYNCKIER/ DE SCHIJF
fig 742B, STADSPARK VYNCKIER/ DE SCHIJF
fig 742C, STADSPARK VYNCKIER/ DE SCHIJF
fig 742D, STADSPARK VYNCKIER/ DE SCHIJF
fig 742E, STADSPARK VYNCKIER/ DE SCHIJF
fig 742F, STADSPARK VYNCKIER/ DE SCHIJF
fig 742G, STADSPARK VYNCKIER/ DE SCHIJF
fig 742H, STADSPARK VYNCKIER/ DE SCHIJF
fig 742I, STADSPARK VYNCKIER/ DE SCHIJF
fig 742J, STADSPARK VYNCKIER/ DE SCHIJF
fig 742K, STADSPARK VYNCKIER/ DE SCHIJF
fig 402A, drawing, Drawing of buildup wintergarden
fig 796A, bOb van Reeth, House Botte
fig 225A, drawing, proces_24
fig 205A, meetings, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 40A, photo, Schuur Gentbrugge – Site
fig 40B, photo, Schuur Gentbrugge – Site
fig 40C, photo, Schuur Gentbrugge – Site
fig 40D, drawing, Schuur Gentbrugge – Site
fig 40E, drawing, Schuur Gentbrugge – Site
fig 400A, drawing, Connection to the floor
fig 635A, Shed structure with new volume
fig 635B, Shed structure with new volume
fig 102A, drawing, club house
fig 326A, WTC model progress week 8
fig 489A, NG17 – preliminary design 06/05 – hostel + offices
fig 489B, NG17 – preliminary design 06/05 – hostel + offices
fig 196A, AXONOMETRIC
fig 636A, circular building
fig 636B, circular building
fig 373A, Cathedrale Communale
fig 969A, Bedrijfsverzamelgebouw
fig 969B, Bedrijfsverzamelgebouw
fig 110A, drawing, Current structure analyse
fig 110B, drawing, Current structure analyse
fig 110C, Current structure analyse
fig 110D, Current structure analyse
fig 110E, drawing, Current structure analyse
fig 110F, drawing, Current structure analyse
fig 110G, drawing, Current structure analyse
fig 589A, photo, Vynckier Site, masterplan, sketch
fig 909A, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 909B, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 909C, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 909D, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 909E, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 909F, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 909G, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 567A, photo, Vynckier, Vynckier_Productiehal
fig 490A, test materiality – housing tower
fig 89A, photo, Study models
fig 89B, Study models
fig 89C, photo, Study models, Using the same logic to connect two pieces to find the right length
fig 73A, drawing, Construction details of the warehouse on site
fig 73B, drawing, Construction details of the warehouse on site
fig 73C, drawing, Construction details of the warehouse on site
fig 473A, work in progress
fig 473B, work in progress
fig 862A, Circular Stacking ; Isometric drawing
fig 692A, Behind the scenes
fig 692B, Behind the scenes
fig 378A, Model structure
fig 788A, Detail – Neue National Galerie – Mies VDR
fig 826A, New Added Structure Pattyn Factory
fig 227A, proces_29
fig 297A, WTC situation plan
fig 504A, TOWER
fig 504B, TOWER
fig 504C, TOWER
fig 504D, TOWER
fig 962A, FINAL DESIGN
fig 265A, John Hancock Center
fig 265B, John Hancock Center
fig 265C, John Hancock Center
fig 265D, John Hancock Center
fig 265E, John Hancock Center
fig 609A, Pavilion on Vynckier Site
fig 609B, Pavilion on Vynckier Site
fig 609C, Pavilion on Vynckier Site
fig 609D, Pavilion on Vynckier Site
fig 609E, Pavilion on Vynckier Site
fig 548A, Parkeergebouw Ledeberg, Nieuw Parkeergebouw Ledeberg
fig 661A, drawing, 27/05
fig 661B, drawing, 27/05
fig 661C, model, 27/05
fig 661D, drawing, 27/05
fig 661E, drawing, 27/05
fig 661F, drawing, 27/05
fig 661G, model, 27/05
fig 661H, model, 27/05
fig 813A, photo, Autographe, Teamwork with Jill Gielen.
fig 813B, photo, Autographe, Teamwork with Jill Gielen.
fig 813C, photo, Autographe, Teamwork with Jill Gielen.
fig 813D, photo, Autographe, Teamwork with Jill Gielen.
fig 539A, Isomo uitsparing voor TPG betonvloer
fig 53A, visit construction site
fig 53B, visit construction site
fig 53C, visit construction site
fig 990A, Brug Util
fig 164A, photo, CREE LCT building system, Floor slab with the holes in it for the steel bar of the columns
fig 164B, CREE LCT building system, wall piece with the columns attached
fig 824A, Structure Pattyn Factory
fig 14A, photo, Industrial project
fig 14B, photo, Industrial project
fig 14C, photo, Industrial project
fig 14D, photo, Industrial project
fig 14E, photo, Industrial project
fig 14F, photo, Industrial project
fig 14G, photo, Industrial project
fig 14H, photo, Industrial project
fig 14I, photo, Industrial project
fig 14J, photo, Industrial project
fig 14K, photo, Industrial project
fig 14L, photo, Industrial project
fig 14M, photo, Industrial project
fig 14N, photo, Industrial project
fig 14O, photo, Industrial project
fig 14P, photo, Industrial project
fig 14Q, photo, Industrial project
fig 14R, photo, Industrial project
fig 14S, photo, Industrial project
fig 14T, photo, Industrial project
fig 14U, photo, Industrial project
fig 271A, Citygroup Center
fig 271B, Citygroup Center
fig 271C, Citygroup Center
fig 991A, Unite d’habitation
fig 313A, Experience the real stuff
fig 313B, Experience the real stuff
fig 313C, Experience the real stuff
fig 360A, Structure between diving tank and WTC 2tower
fig 619A, drawing, Vynckier
fig 619B, drawing, Vynckier
fig 619C, drawing, Vynckier
fig 619D, drawing, Vynckier
fig 384A, CATHEDRALE COMMUNALE_SECTIONS
fig 384B, CATHEDRALE COMMUNALE_SECTIONS
fig 963A, FINAL DESIGN
fig 963B, FINAL DESIGN
fig 243A, model, Luciana Ligeiro and Marta Faustino
fig 36A, photo, Woonzorgcentrum Van Lierde, the blocks can be used for structural and non-structural purposes
fig 503A, BEEKSTRAAT
fig 503B, BEEKSTRAAT
fig 503C, BEEKSTRAAT
fig 168A, Tempory billboard on tempory structure
fig 760A, fire station Mechelen
fig 123A, New structures
fig 230A, proces_32
fig 128A, drawing, Final drawings
fig 128B, model, Final drawings
fig 128C, drawing, Final drawings
fig 128D, drawing, Final drawings
fig 128E, Final drawings
fig 348A, Scheme connections in steel
fig 333A, REFERENTIE_2
fig 546A, Jun Igarashi – Hat H house
fig 815A, photo, A. Mangiarotti
fig 815B, photo, A. Mangiarotti
fig 815C, A. Mangiarotti
fig 815D, drawing, A. Mangiarotti
fig 815E, photo, A. Mangiarotti
fig 815F, photo, A. Mangiarotti
fig 983A, photo, Blockbebauung Paltaufgasse, Vienna, Austria, 1997 via © Werk, Bauen + Wohnen 1998/3
fig 983B, photo, Blockbebauung Paltaufgasse, Vienna, Austria, 1997 via © Werk, Bauen + Wohnen 1998/3
fig 279A, werfbezoek – breedplaatwanden
fig 279B, werfbezoek – breedplaatwanden
fig 606A, drawing, Vynckier
fig 606B, model, Vynckier
fig 606C, drawing, Vynckier
fig 946A, Gottfried Semper
fig 946B, Gottfried Semper
fig 784A, Mies van der Rohe – Kruiskolom
fig 735A, drawing, Manchester, concept apartments and stores
fig 735B, drawing, Manchester, concept structure
fig 735C, drawing, Manchester, concept offices
fig 735D, drawing, Manchester, entrance
fig 735E, drawing, Manchester, CLT structure details
fig 735F, drawing, Manchester, process
fig 735G, drawing, Manchester, plan
fig 735H, drawing, Manchester, section 1
fig 735I, drawing, Manchester, section 2
fig 735J, model, Manchester, courtyard
fig 735K, model, Manchester, facade
fig 401A, model, CATHEDRALE COMMUNALE_DETAIL
fig 401B, model, CATHEDRALE COMMUNALE_DETAIL
fig 187A, studio at carlos ramos’ pavillion
fig 79A, drawing, detail construction garage box, construction detail precast concrete elements
fig 570A, Masterplan
fig 498A, photo, Tandartsenpraktijk
fig 657A, photo, shed structure
fig 24A, photo, Steel truss, center piece
fig 24B, photo, Steel truss, Beam and truss connection
fig 647A, New Shed structure
fig 647B, New Shed structure
fig 370A, Glass corner “box” vertical garden
fig 356A, Diving Tank, WTC
fig 645A, The Nantes Saint-Nazaire Higher School of Fine Arts
fig 648A, Building with shed structure
fig 702A, De Nieuwe Vynckier – Incubator – Model
fig 561A, Front façade and back façade of building 4 and 4A, Vynckier site
fig 470A, volumestudie
fig 601A, drawing, voorstellen inplanting
fig 601B, voorstellen inplanting
fig 571A, model, Masterplan Vynckiersite
fig 571B, model, Masterplan Vynckiersite
fig 864A, Circular Stacking ; RUFF
fig 685A, facades
fig 685B, facades
fig 685C, facades
fig 685D, facades
fig 681A, volume maquette en masterplan ingreep
fig 681B, volume maquette en masterplan ingreep
fig 935A, drawing, Intermediate design proposal week 12
fig 935B, Intermediate design proposal week 12
fig 935C, drawing, Intermediate design proposal week 12
fig 935D, drawing, Intermediate design proposal week 12
fig 935E, drawing, Intermediate design proposal week 12
fig 935F, drawing, Intermediate design proposal week 12
fig 935G, drawing, Intermediate design proposal week 12
fig 935H, drawing, Intermediate design proposal week 12
fig 416A, drawing, proces
fig 416B, proces
fig 630A, OFFICE – RTS Building
fig 630B, OFFICE – RTS Building
fig 683A, section
fig 683B, section
fig 683C, section
fig 641A, Masterplan
fig 248A, photo, exploring the deep plan
fig 830A, drawing, ISO_Facq
fig 783A, Mies van der Rohe – Farnsworth House
fig 746A, vynckier 2020
fig 160A, PROCES – AFBREKEN VS OPBOUW
fig 160B, PROCES – AFBREKEN VS OPBOUW
fig 614A, werfbezoek
fig 656A, Parochiezaal
fig 656B, Parochiezaal
fig 497A, photo, Huisartsenpraktijk
fig 114A, drawing, Existing structure
fig 114B, drawing, Existing structure, Axo
fig 114C, drawing, Existing structure, Section
fig 114D, photo, Existing structure
fig 114E, photo, Existing structure
fig 114F, photo, Existing structure
fig 779A, Eames Case Study House 8, build sketch from Eames' Movie: House - after 5 years of living in it.
fig 520A, Vynckier site bezoek
fig 765A, Piazza dell’Anfiteatro
fig 765B, Piazza dell’Anfiteatro
fig 805A, Haus ohne eigenschaften
fig 493A, model, Work in progress model CNC-site
fig 117A, model, Test model of 19 04 2017
fig 117B, model, Test model of 19 04 2017
fig 117C, model, Test model of 19 04 2017
fig 585A, Proposal Masterplan
fig 839A, ambiguous prouvé
fig 772A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 920A, Design model 1/50
fig 1002A, Beelden by Floris
fig 1002B, Beelden by Floris
fig 1002C, Beelden by Floris
fig 1002D, Beelden by Floris
fig 1002E, Beelden by Floris
fig 1002F, Beelden by Floris
fig 1002G, Beelden by Floris
fig 929A, Design details
fig 547A, photo, Site visit
fig 547B, photo, Site visit
fig 547C, photo, Site visit
fig 791A, Alfred Hardy
fig 791B, Alfred Hardy
fig 791C, Alfred Hardy
fig 791D, Alfred Hardy
fig 663A, OMA
fig 663B, OMA
fig 663C, OMA
fig 663D, OMA
fig 663E, OMA
fig 663F, OMA
fig 476A, KANAL review KUL UCL ULB
fig 476B, KANAL review KUL UCL ULB
fig 476C, KANAL review KUL UCL ULB
fig 90A, Connection of a steel beam to a concrete wall
fig 90B, Connection of a steel beam to a concrete wall
fig 738A, drawing, axo Manchester and Tulou, axonometric drawing
fig 578A, model, Masterplan Vynckier
fig 62A, container cut outs
fig 62B, container cut outs
fig 62C, container cut outs
fig 62D, container cut outs
fig 309A, Balkony garden
fig 309B, Balkony garden
fig 309C, Balkony garden
fig 309D, Balkony garden
fig 967A, analyse maquette
fig 967B, analyse maquette
fig 507A, Final maquette
fig 507B, Final maquette
fig 507C, photo, Final maquette
fig 236A, model,Jukyung & Uk
fig 819A, Fotoreportage context
fig 686A, floorplan
fig 686B, floorplan
fig 686C, floorplan
fig 163A, Proces