fig 198A, sketch
fig 1015A, drawing, Urban plan 1/5000
fig 343A, Open structure + circulation
fig 379A, The masters refer
fig 420A, reference
fig 420B, reference
fig 420C, reference, construction
fig 564A, In het spoor van Serafinus
fig 714A, photo, Vynckier 2, Vynckier 2, Primaire en secundaire structuur
fig 865A, THE ANALYSIS, Oostmalle Delften
fig 865B, THE ANALYSIS, Oostmalle Delften
fig 865C, drawing, THE ANALYSIS, Oostmalle Delften
fig 865D, THE ANALYSIS, Oostmalle Delften
fig 865E, THE ANALYSIS, Oostmalle Delften
fig 865F, THE ANALYSIS, Oostmalle Delften
fig 196A, AXONOMETRIC
fig 143A, structural color
fig 143B, structural color
fig 771A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 322A, Fotos werfbezoek
fig 322B, Fotos werfbezoek
fig 322C, Fotos werfbezoek
fig 803A, Briona 72
fig 736A, drawing, Tulou, reference - China
fig 736B, model, Tulou, rammed earth and wood structure
fig 736C, model, Tulou, rammed earth and wood structure
fig 736D, model, Tulou, structure
fig 736E, model, Tulou, Process
fig 736F, photo, Tulou, reference - China
fig 736G, drawing, Tulou, rammed earth structure
fig 736H, drawing, Tulou, section
fig 736I, drawing, Tulou, Plan
fig 68A, collage: walls around the field
fig 985A, drawing, Section Column
fig 732A, model, Project, Manchester Two
fig 732B, drawing, Project, Manchester Two
fig 732C, drawing, Project, Manchester Two
fig 732D, drawing, Project, Manchester Two
fig 732E, Project, Manchester Two
fig 363A, cathédrale communale work documents
fig 363B, cathédrale communale work documents
fig 60A, photo, SIMPLE CONSTRUCTION
fig 60B, SIMPLE CONSTRUCTION
fig 60C, SIMPLE CONSTRUCTION
fig 693A, Axonometry of fragment CONNECTING GRID
fig 693B, Axonometry of fragment CONNECTING GRID
fig 782A, Detail – Lake Short Drive – Mies VDR
fig 119A, model, Test model of 3 05 2017
fig 272A, Zuidertoren
fig 272B, Zuidertoren
fig 272C, Zuidertoren
fig 225A, drawing, proces_24
fig 603A, stay safe
fig 798A, Facade, office vs storage, Kleimoer, Office vs Storage
fig 954A, structuur – detail
fig 954B, structuur – detail
fig 954C, structuur – detail
fig 954D, structuur – detail
fig 29A, model, STEKO – Building Blocks, The basic elements of the STEKO® building system
fig 29B, photo, STEKO – Building Blocks
fig 29C, photo, STEKO – Building Blocks
fig 856A, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856B, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 856C, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856D, photo, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856E, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856F, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856G, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856H, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 856I, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 856J, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 856K, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 856L, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856M, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856N, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856O, Final Jury Brecht De Roose & Wannes De Brouwer
fig 856P, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 856Q, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 856R, Final Jury Brecht De Roose & Wannes De Brouwer, SONY DSC
fig 437A, model, WTC remodel – puzzle
fig 437B, model, WTC remodel – puzzle
fig 437C, model, WTC remodel – puzzle
fig 437D, model, WTC remodel – puzzle
fig 842A, Chernobyl radar
fig 531A, Schets, demonteerbare structuur, Jean Prouvé
fig 358A, Detailing sketches
fig 510A, final jury @ KANAL bxl
fig 510B, final jury @ KANAL bxl
fig 510C, final jury @ KANAL bxl
fig 510D, final jury @ KANAL bxl
fig 510E, final jury @ KANAL bxl
fig 510F, final jury @ KANAL bxl
fig 510G, final jury @ KANAL bxl
fig 510H, final jury @ KANAL bxl
fig 510I, final jury @ KANAL bxl
fig 510J, final jury @ KANAL bxl
fig 510K, final jury @ KANAL bxl
fig 510L, final jury @ KANAL bxl
fig 510M, final jury @ KANAL bxl
fig 510N, final jury @ KANAL bxl
fig 510O, final jury @ KANAL bxl
fig 510P, final jury @ KANAL bxl
fig 510Q, final jury @ KANAL bxl
fig 510R, final jury @ KANAL bxl
fig 510S, final jury @ KANAL bxl
fig 510T, final jury @ KANAL bxl
fig 510U, final jury @ KANAL bxl
fig 510V, final jury @ KANAL bxl
fig 510W, final jury @ KANAL bxl
fig 510X, final jury @ KANAL bxl
fig 510Y, final jury @ KANAL bxl
fig 510Z, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 510, final jury @ KANAL bxl
fig 598A, Vynckier Site Masterplan Model
fig 45A, drawing, shipping container
fig 45B, drawing, shipping container
fig 45C, drawing, shipping container
fig 727A, Vynckier Saw Shedroof
fig 727B, Vynckier Saw Shedroof
fig 727C, Vynckier Saw Shedroof
fig 1009A, photo, Bernard Tshumi, Rotterdam Railway Tunnel Site via Event Cities
fig 867A, model, THE RESULT, model of the site 1/500 with Alexandre Moens
fig 867B, THE RESULT, model of the site 1/500 with Alexandre Moens
fig 273A, References Prestige Towers
fig 550A, Werf GENT
fig 438A, Gilbert & George
fig 728A, primary structure
fig 728B, primary structure
fig 728C, primary structure
fig 728D, primary structure
fig 601A, drawing, voorstellen inplanting
fig 601B, voorstellen inplanting
fig 360A, Structure between diving tank and WTC 2tower
fig 140A, model making in the sun
fig 140B, model making in the sun
fig 134A, model, Structure models
fig 586A, Masterplan Proposal
fig 255A, WTC pillar dimensions
fig 696A, Axonometries CONNECTING GRID
fig 696B, Axonometries CONNECTING GRID
fig 303A, atelier
fig 147A, model, ‘HUIDEVETTERKEN’ werkmaquette
fig 147B, drawing, ‘HUIDEVETTERKEN’ werkmaquette, existing situation plan
fig 147C, model, ‘HUIDEVETTERKEN’ werkmaquette
fig 793A, Detail foto’s – ELbeton
fig 388A, CATHEDRALE COMMUNALE_DETAILS
fig 41A, drawing, Steel structure
fig 41B, drawing, Steel structure
fig 41C, drawing, Steel structure
fig 41D, drawing, Steel structure
fig 442A, George&Gilbert
fig 527A, drawing, Section of Art & Architecture Building
fig 97A, drawing, SITE & BUILDING ANALYSIS, Exploded view from different construction segments
fig 97B, SITE & BUILDING ANALYSIS, Detailed plan from below and above the ground
fig 166A, photo, FACADE DETAIL, The final fragmented detail of one of the three variations.
fig 166B, photo, FACADE DETAIL, The final fragmented detail of one of the three variations.
fig 166C, photo, FACADE DETAIL, Isometric view of the three variation on the outside columns.
fig 166D, photo, FACADE DETAIL, Handmade concrete
fig 166E, photo, FACADE DETAIL, Facade detail. Now waiting to remove the formwork.
fig 414A, omgeving analyse
fig 414B, drawing, omgeving analyse
fig 414C, drawing, omgeving analyse
fig 414D, drawing, omgeving analyse
fig 414E, drawing, omgeving analyse
fig 263A, structureel schema plint
fig 87A, Analysis structure De Porre, De Porre - floorplan
fig 87B, Analysis structure De Porre, De Porre - level +1
fig 87C, Analysis structure De Porre, Isometric view - surroundings
fig 87D, Analysis structure De Porre, Isometric view - structure
fig 837A, BSF-Connection
fig 809A, V-Profiles used in the ceiling (lost formwork), V-Profile 1978
fig 964A, interieur render voorontwerp
fig 848A, Structure analysis Erfoeddepot Trezoor, Kortrijk
fig 711A, photo, Vynckier, Masterplan, Zicht op Manchester 1 en overdekte markt
fig 992A, Viaduct Gentbrugge
fig 329A, WERKMAQUETTE_1-2
fig 329B, WERKMAQUETTE_1-2
fig 983A, photo, Blockbebauung Paltaufgasse, Vienna, Austria, 1997 via © Werk, Bauen + Wohnen 1998/3
fig 983B, photo, Blockbebauung Paltaufgasse, Vienna, Austria, 1997 via © Werk, Bauen + Wohnen 1998/3
fig 690A, Modelshots CONNECTING GRID
fig 690B, Modelshots CONNECTING GRID
fig 690C, Modelshots CONNECTING GRID
fig 690D, Modelshots CONNECTING GRID
fig 224A, studio
fig 351A, WERKMAQUETTE_PLINT
fig 816A, photo, Loods Soubry, Roeselare – Ruff
fig 614A, werfbezoek
fig 976A, GROOTHANDELSMARKT DER VLAANDEREN
fig 976B, GROOTHANDELSMARKT DER VLAANDEREN
fig 976C, GROOTHANDELSMARKT DER VLAANDEREN
fig 348A, Scheme connections in steel
fig 741A, drawing, STADSPARK VYNCKIER/ DE SCHIJF
fig 741B, STADSPARK VYNCKIER/ DE SCHIJF
fig 741C, STADSPARK VYNCKIER/ DE SCHIJF
fig 741D, STADSPARK VYNCKIER/ DE SCHIJF
fig 741E, STADSPARK VYNCKIER/ DE SCHIJF
fig 741F, STADSPARK VYNCKIER/ DE SCHIJF
fig 741G, STADSPARK VYNCKIER/ DE SCHIJF
fig 741H, STADSPARK VYNCKIER/ DE SCHIJF
fig 741I, STADSPARK VYNCKIER/ DE SCHIJF
fig 741J, STADSPARK VYNCKIER/ DE SCHIJF
fig 741K, STADSPARK VYNCKIER/ DE SCHIJF
fig 741L, STADSPARK VYNCKIER/ DE SCHIJF
fig 713A, structure proposition
fig 713B, structure proposition
fig 713C, structure proposition
fig 591A, Masterplan Vynckiersite Gent
fig 591B, Masterplan Vynckiersite Gent
fig 591C, Masterplan Vynckiersite Gent
fig 942A, Axometrie
fig 323A, Werfbezoek
fig 323B, Werfbezoek
fig 323C, Werfbezoek
fig 323D, Werfbezoek
fig 323E, Werfbezoek
fig 167A, photo, WORK – tussen
fig 167B, WORK – tussen
fig 799A, analysis facade
fig 1003A, Busstation/Public Area Brusselsesteenweg
fig 1003B, Busstation/Public Area Brusselsesteenweg
fig 1003C, Busstation/Public Area Brusselsesteenweg
fig 1003D, Busstation/Public Area Brusselsesteenweg
fig 1003E, model, Busstation/Public Area Brusselsesteenweg
fig 507A, Final maquette
fig 507B, Final maquette
fig 507C, photo, Final maquette
fig 716A, axo existing structure
fig 266A, WTC Massive Model
fig 109A, photo, Japanese House, 1907, Wood construction by 'master carpenter' Nishida Isaburo
fig 705A, photo, Vynckier, Masterplan, Vooraanzicht maquette
fig 210A, drawing, proces_11
fig 258A, model WTC
fig 909A, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 909B, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 909C, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 909D, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 909E, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 909F, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 909G, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 484A, model, Model housing tower
fig 10A, drawing, CORRUGATED WEB BEAM, Production GLP Beam
fig 10B, photo, CORRUGATED WEB BEAM, Connection GLP to GLP
fig 10C, photo, CORRUGATED WEB BEAM, Connection GLP to column
fig 10D, photo, CORRUGATED WEB BEAM, Example project
fig 10E, photo, CORRUGATED WEB BEAM, Example project 2
fig 494A, roof structure
fig 854A, POCO LOCO FACTORY
fig 970A, Viaduct Gent 2021
fig 970B, Viaduct Gent 2021, Constructie
fig 460A, bOb
fig 460B, bOb
fig 460C, bOb
fig 460D, bOb
fig 206A, drawing, proces_01
fig 806A, Haus ohne eigenschaften
fig 913A, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 913B, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 913C, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 409A, drawing, Detail
fig 135A, model, Final model
fig 423A, Early plan social triplex
fig 252A, Pillar Catalogue
fig 236A, model,Jukyung & Uk
fig 304A, work documents
fig 1011A, photo, Model 1/500 -1/50 mobility hub
fig 1011B, photo, Model 1/500 -1/50 mobility hub
fig 1011C, photo, Model 1/500 -1/50 mobility hub
fig 1011D, photo, Model 1/500 -1/50 mobility hub
fig 729A, model, Project, The Modern Tulou
fig 729B, model, Project, The Modern Tulou
fig 729C, model, Project, The Modern Tulou
fig 729D, model, Project, The Modern Tulou
fig 729E, drawing, Project, The Modern Tulou
fig 729F, drawing, Project, The Modern Tulou
fig 729G, drawing, Project, The Modern Tulou
fig 729H, model, Project, The Modern Tulou
fig 729I, model, Project, The Modern Tulou
fig 681A, volume maquette en masterplan ingreep
fig 681B, volume maquette en masterplan ingreep
fig 376A, Wooden box in steel structure
fig 274A, Welkom in de Noord-wijk
fig 274B, Welkom in de Noord-wijk
fig 274C, Welkom in de Noord-wijk
fig 274D, Welkom in de Noord-wijk
fig 593A, drawing, 25/03
fig 593B, drawing, 25/03
fig 593C, model, 25/03
fig 698A, Masterplan
fig 698B, Masterplan
fig 51A, photo, Project Nonnemeersstraat, Ghent
fig 51B, drawing, Project Nonnemeersstraat, Ghent
fig 51C, drawing, Project Nonnemeersstraat, Ghent
fig 51D, drawing, Project Nonnemeersstraat, Ghent
fig 51E, drawing, Project Nonnemeersstraat, Ghent
fig 51F, drawing, Project Nonnemeersstraat, Ghent
fig 51G, drawing, Project Nonnemeersstraat, Ghent
fig 51H, drawing, Project Nonnemeersstraat, Ghent
fig 51I, drawing, Project Nonnemeersstraat, Ghent
fig 51J, drawing, Project Nonnemeersstraat, Ghent
fig 51K, photo, Project Nonnemeersstraat, Ghent
fig 51L, drawing, Project Nonnemeersstraat, Ghent
fig 51M, drawing, Project Nonnemeersstraat, Ghent
fig 51N, drawing, Project Nonnemeersstraat, Ghent
fig 51O, model, Project Nonnemeersstraat, Ghent
fig 51P, photo, Project Nonnemeersstraat, Ghent
fig 514A, Werfbeeld 51 Rue Raynouard – Perret
fig 616A, photo, SCHETSEN 1/04
fig 616B, SCHETSEN 1/04
fig 616C, photo, SCHETSEN 1/04
fig 616D, drawing, SCHETSEN 1/04
fig 785A, Mies van der Rohe – Crown Hall – Isometrie
fig 1008A, Superstudio
fig 1000A, Foto
fig 439A, hopvandenbrandenstraat.
fig 439B, hopvandenbrandenstraat.
fig 439C, hopvandenbrandenstraat.
fig 444A, Old vs. new
fig 487A, Work in progress – Dauwstraat, Processed with VSCO with preset
fig 646A, BOX ON STEEL
fig 241A, axonometric
fig 241B, axonometric
fig 558A, inplantingsmaquette, burst
fig 71A, photo, axonometric view on docks site
fig 117A, model, Test model of 19 04 2017
fig 117B, model, Test model of 19 04 2017
fig 117C, model, Test model of 19 04 2017
fig 515A, space and event
fig 555A, Vynckier
fig 555B, Vynckier
fig 186A, Model
fig 186B, Model
fig 186C, Model
fig 778A, photo, Eames Case Study House 8, Interior steel Truss, aesthetics of prefab
fig 1A, drawing, STEEL JOINT
fig 770A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 91A, MODEL #1, Interior wooden structure
fig 91B, MODEL #1, Interior wooden structure
fig 1001A, Jury in progress
fig 1001B, Jury in progress
fig 1001C, Jury in progress
fig 1001D, Jury in progress
fig 1001E, Jury in progress
fig 781A, SUPERSTUDIO quaderna console tables for zanotta 1971
fig 792A, EL Beton – Structuur plan
fig 352A, LOFTS With gardens in double skin facade
fig 594A, NIEUWE VYNCKIER
fig 561A, Front façade and back façade of building 4 and 4A, Vynckier site
fig 13A, photo, Arrival_Tower
fig 383A, CATHEDRALE COMMUNALE_PLANS
fig 509A, photo, A. Lavalléestraat
fig 509B, photo, A. Lavalléestraat
fig 509C, A. Lavalléestraat
fig 509D, photo, A. Lavalléestraat
fig 605A, drawing, English Garden – Lancelot Capability Brown
fig 920A, Design model 1/50
fig 853A, INTERBETON
fig 24A, photo, Steel truss, center piece
fig 24B, photo, Steel truss, Beam and truss connection
fig 293A, Core WTC
fig 48A, model vs Spa reine
fig 597A, Masterplan 25/03
fig 981A, Velsertunnel (A22) Ventilation Towers, NL
fig 254A, The ramp
fig 254B, The ramp
fig 254C, The ramp
fig 939A, photo, Picobello
fig 588A, Vynckier Site, first proposal, sketches
fig 249A, photo, working session
fig 999A, Foto opdracht
fig 999B, Foto opdracht
fig 999C, Foto opdracht
fig 999D, Foto opdracht
fig 999E, Foto opdracht
fig 999F, Foto opdracht
fig 49A, Model #2
fig 777A, photo, Eames Case Study House 8
fig 589A, photo, Vynckier Site, masterplan, sketch
fig 292A, WTC NIV + 27
fig 829A, Analyse EL beton – Detail dakspant 1
fig 844A, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844B, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844C, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844D, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844E, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844F, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844G, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844H, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844I, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844J, model, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844K, model, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844L, model, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844M, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844N, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844O, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844P, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844Q, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 844R, drawing, analysis, storage for granulates, Willemen Infra, Brecht De Roose & Wannes De Brouwer
fig 104A, drawing, supporting points in sports
fig 104B, supporting points in sports
fig 104C, supporting points in sports
fig 532A, The Smithsons’ New Brutalism
fig 532B, The Smithsons’ New Brutalism
fig 151A, photo, Site ‘Huidevetterken’, L-profile column
fig 151B, photo, Site ‘Huidevetterken’, Steel detail
fig 676A, model, Dwarse snede woning
fig 148A, Inversion of the field
fig 518A, drawing, Kimbell Art Center
fig 518B, Kimbell Art Center
fig 862A, Circular Stacking ; Isometric drawing
fig 656A, Parochiezaal
fig 656B, Parochiezaal
fig 756A, drawing, Projection of chessboard grid on Vynckier site
fig 664A, Maquette Terminal
fig 664B, Maquette Terminal
fig 664C, Maquette Terminal
fig 664D, Maquette Terminal
fig 664E, Maquette Terminal
fig 17A, photo, SITE VISIT °2, On top you can see the combination of the concrete columns with the steel trusses.
fig 17B, photo, SITE VISIT °2, Prefabricated concrete elements fits perfectly in each other.
fig 17C, photo, SITE VISIT °2, The holes in the beams are made to put ducts through them.
fig 17D, photo, SITE VISIT °2, Prefabricated concrete elements fits perfectly in each other.
fig 17E, photo, SITE VISIT °2, Prefabricated beams and columns with on top the prefabricated vaults.
fig 17F, photo, SITE VISIT °2, The structure is filled up with brick between the columns.
fig 17G, photo, SITE VISIT °2, The prefabricated vaults.
fig 17H, photo, SITE VISIT °2, Against the primary structure, facade elements are fixed.
fig 316A, Notre Dame
fig 377A, Wooden stairs in steel structure
fig 246A, Axonometria
fig 755A, photo, Eve Babitz playing chess with Marcel Duchamp, Pasadena 1963
fig 477A, Review Primary structure – Kanal Brussels, Processed with VSCO with m5 preset
fig 132A, 4 Column House
fig 190A, meetings
fig 974A, photo, Oosterweel verbinding, construction site
fig 974B, photo, Oosterweel verbinding, construction site
fig 974C, photo, Oosterweel verbinding, construction site
fig 725A, Vynckier Circle
fig 725B, Vynckier Circle
fig 725C, Vynckier Circle
fig 750A, photo, Vynckier 2, Principe authentieke en groene gevel, Maquette
fig 1007A, Bas Princen
fig 403A, model, Cathedrale Communale 1/200
fig 403B, model, Cathedrale Communale 1/200
fig 403C, model, Cathedrale Communale 1/200
fig 403D, model, Cathedrale Communale 1/200
fig 403E, model, Cathedrale Communale 1/200
fig 403F, model, Cathedrale Communale 1/200
fig 403G, model, Cathedrale Communale 1/200
fig 403H, model, Cathedrale Communale 1/200
fig 403I, model, Cathedrale Communale 1/200
fig 861A, Circular Stacking ; 1/100 model
fig 861B, Circular Stacking ; 1/100 model
fig 861C, Circular Stacking ; 1/100 model
fig 861D, Circular Stacking ; 1/100 model
fig 861E, Circular Stacking ; 1/100 model
fig 1014A, photo, Plan 1/500 residential
fig 748A, photo, Vynckier 2, Principe, Maquette, Inkom
fig 184A, Design
fig 184B, Design
fig 184C, Design
fig 184D, Design
fig 184E, Design
fig 184F, Design
fig 184G, Design
fig 184H, Design
fig 184I, Design
fig 779A, Eames Case Study House 8, build sketch from Eames' Movie: House - after 5 years of living in it.
fig 73A, drawing, Construction details of the warehouse on site
fig 73B, drawing, Construction details of the warehouse on site
fig 73C, drawing, Construction details of the warehouse on site
fig 733A, Primaru Circles_photos
fig 47A, drawing, Every Big Box has its structure
fig 47B, drawing, Every Big Box has its structure
fig 122A, Structure site Nieuwevaart Gent
fig 122B, Structure site Nieuwevaart Gent
fig 839A, ambiguous prouvé
fig 27A, drawing, Types of steel trusses
fig 401A, model, CATHEDRALE COMMUNALE_DETAIL
fig 401B, model, CATHEDRALE COMMUNALE_DETAIL
fig 288A, Voorstel programma toren
fig 699A, Facades
fig 699B, Facades
fig 128A, drawing, Final drawings
fig 128B, model, Final drawings
fig 128C, drawing, Final drawings
fig 128D, drawing, Final drawings
fig 128E, Final drawings
fig 183A, Structural Analysis
fig 183B, Structural Analysis
fig 183C, Structural Analysis
fig 183D, Structural Analysis
fig 183E, Structural Analysis
fig 183F, Structural Analysis
fig 183G, Structural Analysis
fig 183H, Structural Analysis
fig 183I, drawing, Structural Analysis
fig 183J, Structural Analysis
fig 183K, Structural Analysis
fig 385A, CATHEDRALE COMMUNALE
fig 250A, working session
fig 788A, Detail – Neue National Galerie – Mies VDR
fig 478A, housewithonepencil.
fig 945A, Onderzoek industriebouw
fig 945B, Onderzoek industriebouw
fig 945C, Onderzoek industriebouw
fig 929A, Design details
fig 373A, Cathedrale Communale
fig 694A, Axonometries CONNECTING GRID
fig 694B, Axonometries CONNECTING GRID
fig 1022A, drawing, conceptual scheme
fig 776A, photo, Eames case study house 8, Eames case study house No.8, exterior
fig 776B, photo, Eames case study house 8, Eames case study house No. 8, Bare steel frame
fig 9A, photo, Getting some help, Getting some help.
fig 998A, End Presentation, Site Model
fig 538A, ECAM – Agwa Architects
fig 538B, ECAM – Agwa Architects
fig 769A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 22A, photo, factory Gentbrugge – Site, wooden beam pattern
fig 22B, drawing, factory Gentbrugge – Site
fig 22C, drawing, factory Gentbrugge – Site
fig 22D, drawing, factory Gentbrugge – Site, masonry
fig 22E, drawing, factory Gentbrugge – Site, existing structure
fig 911A, primary structure maquette
fig 911B, photo, primary structure maquette
fig 911C, photo, primary structure maquette
fig 911D, photo, primary structure maquette
fig 911E, photo, primary structure maquette
fig 168A, Tempory billboard on tempory structure
fig 471A, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 471B, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 471C, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 208A, drawing, proces_09
fig 197A, work in progress … axonometry
fig 900A, I-joist factory
fig 262A, Opbouw maquette S1:50 WTC
fig 320A, exploded toren
fig 611A, drawing, Masterplan CONNECTING GRID 1.0, scale 1/1000
fig 396A, drawing, Final plans
fig 930A, Design model 1/100
fig 930B, Design model 1/100
fig 795A, drawing, bOb Van Reeth, Circle vs Square, The basic operation in the design is playing the circle and parts of the circle off against the equality, the peace and quiet, and the infinite expandability and divisibility of the square and the grid. Because every square is otherwise perfectly divisible and fits in without a different figure ever being created. A square certainly does centre but at thesame time the four sides decentre and orient, the sides are just as strong as the cenre. A circle on the other hand radiates but centres to a much greater degree, detaches itself, and never shares its borderline with a second circle. It is enough to draw a circle in or around a square, or to construct a circle from an angle of a square, to obtain a dynamic heterogenous division of the plane with centred and non centred, single and complex planes, regular primary figures and secondary spaces, insides and outsides, direction.
fig 596A, Masterplan Model 2
fig 459A, House Botte – bOb Van Reeth
fig 754A, maquette
fig 754B, maquette
fig 754C, maquette
fig 754D, maquette
fig 754E, maquette
fig 754F, maquette
fig 754G, maquette
fig 935A, drawing, Intermediate design proposal week 12
fig 935B, Intermediate design proposal week 12
fig 935C, drawing, Intermediate design proposal week 12
fig 935D, drawing, Intermediate design proposal week 12
fig 935E, drawing, Intermediate design proposal week 12
fig 935F, drawing, Intermediate design proposal week 12
fig 935G, drawing, Intermediate design proposal week 12
fig 935H, drawing, Intermediate design proposal week 12
fig 126A, URBAN FARM
fig 126B, URBAN FARM
fig 180A, model, Site de Porre – primary structure model, A
fig 658A, future for the fireplace
fig 235A, model, Laia Bonet and Charlette Frémont
fig 265A, John Hancock Center
fig 265B, John Hancock Center
fig 265C, John Hancock Center
fig 265D, John Hancock Center
fig 265E, John Hancock Center
fig 581A, Proposal Masterplan Vynckier
fig 501A, Section A110
fig 602A, Superstudio, Adolfo Natalini, Monumento Continuo, 1969
fig 633A, Idea Superstudio on ConnectingGrid
fig 464A, l’unionfaitlaforce
fig 751A, model, Vynckier 2, Principe, Inkom
fig 860A, WIEDAUWKAAI ; 1/500 model
fig 860B, WIEDAUWKAAI ; 1/500 model
fig 863A, Circular Stacking ; Stacked roof detail
fig 294A, Structure Niv +27 WTC
fig 543A, Constructie detail werfbezoek
fig 723A, Vynckier Site Saw-tooth roof
fig 723B, Vynckier Site Saw-tooth roof
fig 723C, Vynckier Site Saw-tooth roof
fig 723D, Vynckier Site Saw-tooth roof
fig 723E, Vynckier Site Saw-tooth roof
fig 723F, Vynckier Site Saw-tooth roof
fig 723G, Vynckier Site Saw-tooth roof
fig 901A, I-joist factory
fig 1019A, photo, Work on view at LifeCycles event 2022
fig 1019B, photo, Work on view at LifeCycles event 2022
fig 765A, Piazza dell’Anfiteatro
fig 765B, Piazza dell’Anfiteatro
fig 677A, Axonometrie primaire structuur
fig 677B, Axonometrie primaire structuur
fig 1006A, model, Gate Building, Gate Building
fig 1006B, Gate Building, Gate Building
fig 1006C, Gate Building, axis
fig 1006D, Gate Building, Bridge Structure
fig 181A, final drawings
fig 181B, drawing, final drawings
fig 57A, Mid-Process model
fig 449A, Repitition
fig 959A, FINAL DESIGN
fig 956A, MODEL 1/500
fig 46A, drawing, masterplan site gentbrugge
fig 46B, drawing, masterplan site gentbrugge
fig 46C, photo, masterplan site gentbrugge
fig 289A, Louis Sullivan – The tall office building artistically considered
fig 429A, drawing, WTC remodel – detail of roof of rooftop extension
fig 429B, drawing, WTC remodel – detail of roof of rooftop extension
fig 429C, drawing, WTC remodel – detail of roof of rooftop extension
fig 429D, drawing, WTC remodel – detail of roof of rooftop extension
fig 429E, drawing, WTC remodel – detail of roof of rooftop extension
fig 429F, drawing, WTC remodel – detail of roof of rooftop extension
fig 297A, WTC situation plan
fig 78A, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78B, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78C, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 78D, Site Secondary structure, OLYMPUS DIGITAL CAMERA
fig 55A, section draft
fig 823A, photo, Visit Building Nachtergaele, back facade, Steel, old and new, renovation
fig 823B, photo, Visit Building Nachtergaele, Canopy, conncection, structure, wood, steel, detail
fig 823C, photo, Visit Building Nachtergaele, Montage, original plans
fig 823D, photo, Visit Building Nachtergaele, Facade, floor, conncetion, 3D, lost form, steel, concrete
fig 823E, drawing, Visit Building Nachtergaele
fig 823F, drawing, Visit Building Nachtergaele
fig 516A, Column Peter Märkli
fig 936A, photo, Visit dok brewing company, Bottler and fermenting silo's
fig 936B, photo, Visit dok brewing company, hopper and water boiler
fig 936C, photo, Visit dok brewing company, Storage tank warm water
fig 936D, photo, Visit dok brewing company, Heat exchanger
fig 474A, vertrapping
fig 4A, photo, Hidden interior structure of the Tondelier sasholders, Interior of the Tondelier gasholders.
fig 4B, photo, Hidden interior structure of the Tondelier sasholders, Interior of the Tondelier gasholders.
fig 4C, photo, Hidden interior structure of the Tondelier sasholders, Interior of the Tondelier gasholders.
fig 4D, photo, Hidden interior structure of the Tondelier sasholders, Remaining structure Tondelier gasholder
fig 138A, Sint – Amandsberg site, Gent. Details
fig 300A, Basiliek van Koekelberg
fig 300B, Basiliek van Koekelberg
fig 308A, Vertical Garden
fig 374A, WERKMAQUETTE_4.1
fig 547A, photo, Site visit
fig 547B, photo, Site visit
fig 547C, photo, Site visit
fig 663A, OMA
fig 663B, OMA
fig 663C, OMA
fig 663D, OMA
fig 663E, OMA
fig 663F, OMA
fig 118A, photo, Test model of 26 04 2017
fig 118B, photo, Test model of 26 04 2017
fig 118C, photo, Test model of 26 04 2017
fig 655A, Steel Frame Box
fig 957A, FINAL DESIGN
fig 355A, Notre-Dame in BXL?
fig 298A, WTC axo concepts
fig 689A, Modelshots CONNECTING GRID
fig 689B, Modelshots CONNECTING GRID
fig 689C, model, Modelshots CONNECTING GRID
fig 689D, Modelshots CONNECTING GRID
fig 679A, 27/05
fig 679B, 27/05
fig 679C, 27/05
fig 679D, drawing, 27/05
fig 679E, model, 27/05
fig 679F, model, 27/05
fig 679G, drawing, 27/05
fig 679H, drawing, 27/05
fig 679I, 27/05
fig 679J, drawing, 27/05
fig 679K, drawing, 27/05
fig 195A, visits
fig 757A, theory research Gottfried semper
fig 356A, Diving Tank, WTC
fig 721A, photo, Vynckier 2, Vynckier 2, Principe gevel- en dakopbouw
fig 572A, les 18/03
fig 572B, drawing, les 18/03
fig 572C, drawing, les 18/03
fig 331A, REFERENTIE_1
fig 828A, Analyse EL beton – total overvieuw
fig 535A, photo, Palais d’Iéna, Paris – Auguste Perret
fig 1002A, Beelden by Floris
fig 1002B, Beelden by Floris
fig 1002C, Beelden by Floris
fig 1002D, Beelden by Floris
fig 1002E, Beelden by Floris
fig 1002F, Beelden by Floris
fig 1002G, Beelden by Floris
fig 463A, drawing, hopvandenbrandenstraat.
fig 826A, New Added Structure Pattyn Factory
fig 607A, drawing, Vynckier
fig 607B, model, Vynckier
fig 607C, drawing, Vynckier
fig 539A, Isomo uitsparing voor TPG betonvloer
fig 465A, Collage Rules
fig 3A, drawing, Voorhaven Site, The column is constructed with leftovers from the world expo in Antwerp 1985
fig 3B, photo, Voorhaven Site
fig 3C, drawing, Voorhaven Site, how hot riveting is done.
fig 369A, Section analysis of fermentation tank
fig 406A, drawing, Facade
fig 768A, Erfgoeddepot Trezoor, Kortrijk
fig 120A, Reference structure steel
fig 120B, Reference structure steel
fig 120C, Reference structure steel
fig 982A, studio
fig 995A, Photo Assignment
fig 995B, Photo Assignment
fig 995C, Photo Assignment
fig 995D, Photo Assignment
fig 995E, Photo Assignment
fig 801A, photo, storage for granulates, next to concrete plant, facade
fig 801B, drawing, storage for granulates, next to concrete plant, section
fig 415A, model, werkmaquette
fig 415B, model, werkmaquette
fig 232A, proces_33
fig 590A, masterplan
fig 171A, drawing, Analysis structure De Porre, Cantilever in concrete
fig 141A, Site visit Sint-Martens-Latem
fig 141B, Site visit Sint-Martens-Latem
fig 141C, Site visit Sint-Martens-Latem
fig 141D, Site visit Sint-Martens-Latem
fig 141E, Site visit Sint-Martens-Latem
fig 141F, Site visit Sint-Martens-Latem
fig 141G, Site visit Sint-Martens-Latem
fig 996A, photo, End Presentation, Axonometric Drawing
fig 666A, Site section Terminal
fig 648A, Building with shed structure
fig 800A, Granulate Storage Shed, Axo
fig 692A, Behind the scenes
fig 692B, Behind the scenes
fig 72A, drawing, Structure of the big warehouse on docks site
fig 103A, RECTOLIGHT
fig 50A, drawing, OLD vs. NEW
fig 112A, photo, Hans Chr. Hansen, Amager Koblingsstation, Facade detail
fig 112B, photo, Hans Chr. Hansen, Amager Koblingsstation
fig 112C, photo, Hans Chr. Hansen, Amager Koblingsstation
fig 659A, Concrete Disc building
fig 98A, Quick steel
fig 595A, The Brewing Process
fig 850A, Structure analysis Erfoeddepot Trezoor, Kortrijk
fig 416A, drawing, proces
fig 416B, proces
fig 390A, Is It a Niemeyer?
fig 390B, Is It a Niemeyer?
fig 158A, Model of the Site, The final position of the new added buildings.
fig 158B, Model of the Site, Model without any of the existing structures.
fig 349A, Scheme structures silo
fig 349B, Scheme structures silo
fig 113A, drawing, Site Ijzerweglaan, City fabric
fig 113B, photo, Site Ijzerweglaan, Island cut off by the river Schelde and the E17 Viaduct
fig 113C, model, Site Ijzerweglaan
fig 113D, drawing, Site Ijzerweglaan, Different existing typologies
fig 113E, photo, Site Ijzerweglaan
fig 113F, photo, Site Ijzerweglaan
fig 113G, photo, Site Ijzerweglaan, A fence between a small neigborhood park and the 13.000 m2 site
fig 113H, photo, Site Ijzerweglaan
fig 113I, Site Ijzerweglaan
fig 113J, photo, Site Ijzerweglaan, Volvo seen by Volvo
fig 321A, plan woning
fig 185A, DECORMAQUETTE
fig 327A, WTC – model
fig 327B, WTC – model
fig 649A, Building shed structure axonometric
fig 804A, Casa a tre cilindri
fig 170A, photo, REFERENCES
fig 170B, REFERENCES
fig 170C, REFERENCES
fig 170D, REFERENCES
fig 170E, REFERENCES
fig 170F, REFERENCES
fig 366A, Opwervendag Nemo link
fig 366B, Opwervendag Nemo link
fig 366C, Opwervendag Nemo link
fig 366D, Opwervendag Nemo link
fig 366E, Opwervendag Nemo link
fig 486A, Structure Beekstraat
fig 835A, drawing, Facq building, primary & secondary structure
fig 570A, Masterplan
fig 458A, Marc-Antoine Laugier ‘Essay on Architecture’
fig 458B, Marc-Antoine Laugier ‘Essay on Architecture’
fig 163A, Proces
fig 163B, drawing, Proces, detail exploded view
fig 163C, Proces
fig 163D, Proces
fig 163E, Proces
fig 674A, drawing, Langse snede
fig 606A, drawing, Vynckier
fig 606B, model, Vynckier
fig 606C, drawing, Vynckier
fig 569A, Vynckier Site masterplan sketch
fig 324A, werfbezoek
fig 324B, werfbezoek
fig 324C, werfbezoek
fig 296A, WTC sections
fig 522A, photo, Analyse Swiss Sound Box – Peter Zumthor, Swiss Sound Box - Peter Zumthor
fig 307A, STRUCTURE WTC
fig 307B, STRUCTURE WTC
fig 309A, Balkony garden
fig 309B, Balkony garden
fig 309C, Balkony garden
fig 309D, Balkony garden
fig 447A, photo, Collage geïnspireerd op Gilbert & George
fig 495A, A110 – 2M wide cohousing
fig 326A, WTC model progress week 8
fig 136A, Sint – Amandsberg site, Gent. Detail Model, OLYMPUS DIGITAL CAMERA
fig 709A, photo, Vynckier, Masterplan, Overdekte markt met passerelle
fig 834A, model, Facq building model section, roller bridge
fig 42A, photo, Renovation factory Kotrijk
fig 42B, photo, Renovation factory Kotrijk
fig 42C, photo, Renovation factory Kotrijk
fig 42D, photo, Renovation factory Kotrijk
fig 153A, DRAWINGS
fig 153B, DRAWINGS
fig 153C, DRAWINGS
fig 153D, DRAWINGS
fig 153E, DRAWINGS
fig 153F, DRAWINGS
fig 153G, DRAWINGS
fig 153H, DRAWINGS
fig 153I, DRAWINGS
fig 153J, drawing, DRAWINGS
fig 305A, Site Visit 1
fig 305B, Site Visit 1
fig 305C, Site Visit 1
fig 305D, Site Visit 1
fig 305E, Site Visit 1
fig 498A, photo, Tandartsenpraktijk
fig 961A, FINAL DESIGN
fig 609A, Pavilion on Vynckier Site
fig 609B, Pavilion on Vynckier Site
fig 609C, Pavilion on Vynckier Site
fig 609D, Pavilion on Vynckier Site
fig 609E, Pavilion on Vynckier Site
fig 497A, photo, Huisartsenpraktijk
fig 1005A, End Presentation, Drawings
fig 1005B, drawing, End Presentation, Drawings
fig 1005C, drawing, End Presentation, Drawings
fig 1005D, End Presentation, Drawings
fig 787A, Mies van der Rohe – Farnsworth House – Hoekdetail
fig 493A, model, Work in progress model CNC-site
fig 260A, REA new ramp
fig 436A, model, WTC remodel – final presentation
fig 436B, model, WTC remodel – final presentation
fig 436C, model, WTC remodel – final presentation
fig 436D, model, WTC remodel – final presentation
fig 456A, Enclosed house
fig 285A, sketch on existing plan
fig 525A, Analyse Allmannajuvet Zinc Mine Museum – Peter Zumthor, Allmannajuvet Zinc Mine Museum - Peter Zumthor
fig 563A, Photo of of interior staircase at building 4, Vynckier site
fig 127A, model, Final
fig 127B, drawing, Final
fig 127C, drawing, Final
fig 821A, SUPERSTUDIO Le dodici Città Ideali 1971
fig 83A, drawing, SITE ANALYSE
fig 83B, drawing, SITE ANALYSE
fig 83C, drawing, SITE ANALYSE
fig 131A, Blekerijstraat site photos
fig 131B, Blekerijstraat site photos
fig 131C, Blekerijstraat site photos
fig 131D, Blekerijstraat site photos
fig 279A, werfbezoek – breedplaatwanden
fig 279B, werfbezoek – breedplaatwanden
fig 80A, drawing, Site analyse
fig 80B, drawing, Site analyse
fig 80C, drawing, Site analyse
fig 80D, drawing, Site analyse
fig 80E, drawing, Site analyse
fig 80F, drawing, Site analyse
fig 80G, drawing, Site analyse
fig 80H, drawing, Site analyse
fig 80I, drawing, Site analyse
fig 80J, drawing, Site analyse
fig 80K, drawing, Site analyse
fig 80L, drawing, Site analyse
fig 80M, drawing, Site analyse
fig 80N, drawing, Site analyse
fig 80O, drawing, Site analyse
fig 80P, drawing, Site analyse
fig 80Q, model, Site analyse
fig 80R, model, Site analyse
fig 80S, model, Site analyse
fig 80T, model, Site analyse
fig 382A, WTC EXISTING STRUCTURE
fig 988A, Viaduct als groene as
fig 99A, Basic Concrete Prefab Construction, construction site
fig 99B, Basic Concrete Prefab Construction, Connection in the center of a diagonal buttress
fig 99C, Basic Concrete Prefab Construction, Top connection of a diagonal buttress
fig 99D, Basic Concrete Prefab Construction, Floor connection of a diagonal buttress
fig 99E, Basic Concrete Prefab Construction, prefab column and beam
fig 99F, Basic Concrete Prefab Construction, Columns with corbels and visible hole from weld plate cast into column for the beam connection.
fig 99G, Basic Concrete Prefab Construction, enfilade of the prefab system
fig 99H, Basic Concrete Prefab Construction, crane
fig 99I, Basic Concrete Prefab Construction, beam reinforcement
fig 281A, werfbezoek – fout wapeningsstaal
fig 628A, fake Mies
fig 628B, fake Mies
fig 75A, model, Construction details of a car dealers garage, Joint of a column, primary and secondary roof beams.
fig 75B, drawing, Construction details of a car dealers garage, Joint of a column, primary and secondary roof beams.
fig 75C, drawing, Construction details of a car dealers garage, Connection of the structure of the two halls.
fig 668A, Structuur Manchester 2
fig 724A, Vynckier Site Masterplan
fig 142A, Urban design
fig 142B, Urban design
fig 199A, sketch
fig 528A, Study of the capital
fig 84A, photo, Study models, Model 1/25
fig 84B, photo, Study models, Model 1/25
fig 84C, photo, Study models, Model 1/25
fig 730A, Primary Circles_structural system
fig 156A, photo, research structure, A
fig 364A, Axo volumes
fig 364B, Axo volumes
fig 990A, Brug Util
fig 944A, model, JURY 26/05/’21
fig 944B, model, JURY 26/05/’21
fig 944C, model, JURY 26/05/’21
fig 944D, drawing, JURY 26/05/’21
fig 944E, model, JURY 26/05/’21
fig 944F, model, JURY 26/05/’21
fig 944G, model, JURY 26/05/’21
fig 944H, model, JURY 26/05/’21
fig 944I, model, JURY 26/05/’21
fig 278A, werfbezoek, SAMSUNG CSC
fig 394A, model, Final scale model
fig 574A, Sketch of masterplan, scale 1/1000
fig 268A, Knights of Columbus
fig 268B, Knights of Columbus
fig 268C, Knights of Columbus
fig 845A, Hannelore Van Dijck – Primary Talks
fig 619A, drawing, Vynckier
fig 619B, drawing, Vynckier
fig 619C, drawing, Vynckier
fig 619D, drawing, Vynckier
fig 244A, model, Maurício Muller and Jerónimo Bailat
fig 979A, geel tracé
fig 979B, geel tracé
fig 386A, CATHEDRALE COMMUNALE_PROGRAM
fig 386B, CATHEDRALE COMMUNALE_PROGRAM
fig 94A, INDUSTRIAL CONSTRUCTION SITE, Prefab structure
fig 94B, INDUSTRIAL CONSTRUCTION SITE, Two truss crossing
fig 94C, INDUSTRIAL CONSTRUCTION SITE, Cross bracing of the structure
fig 949A, Analyse
fig 524A, ANALYSE Steilneset Memorial – PETER ZUMTHOR, Steilneset Memorial - Peter Zumthor
fig 773A, Mushroom farm
fig 62A, container cut outs
fig 62B, container cut outs
fig 62C, container cut outs
fig 62D, container cut outs
fig 350A, How To Become A Niemeyer
fig 317A, Lina Bo Bardi MASP under construction
fig 221A, model, work in progress
fig 275A, Ceiling Infrastructure plan
fig 20A, drawing, stabilizing structural systems, different ways to stabilize structure
fig 541A, Bambow bridge – Atelier Lai
fig 121A, Pictures Model
fig 121B, Pictures Model
fig 155A, drawing, ISO
fig 353A, Vertical Garden WTC, “Hanging the stairs” Sketches
fig 433A, finaal model
fig 433B, finaal model
fig 433C, finaal model
fig 960A, FINAL DESIGN
fig 960B, FINAL DESIGN
fig 359A, Structure underneath diving tank
fig 627A, Vynckier 2
fig 947A, Analyse
fig 947B, Analyse
fig 947C, Analyse
fig 947D, Analyse
fig 947E, Analyse
fig 79A, drawing, detail construction garage box, construction detail precast concrete elements
fig 827A, Facade Pattyn Factory
fig 827B, Facade Pattyn Factory
fig 177A, Final model
fig 177B, Final model, C
fig 342A, Drawing of concrete silo
fig 925A, JURY studio 21, Gent Wiedauwkaai
fig 925B, JURY studio 21, Gent Wiedauwkaai
fig 925C, JURY studio 21, Gent Wiedauwkaai
fig 925D, JURY studio 21, Gent Wiedauwkaai
fig 925E, JURY studio 21, Gent Wiedauwkaai
fig 925F, JURY studio 21, Gent Wiedauwkaai
fig 925G, JURY studio 21, Gent Wiedauwkaai
fig 925H, JURY studio 21, Gent Wiedauwkaai
fig 925I, JURY studio 21, Gent Wiedauwkaai
fig 925J, JURY studio 21, Gent Wiedauwkaai
fig 925K, JURY studio 21, Gent Wiedauwkaai
fig 925L, JURY studio 21, Gent Wiedauwkaai
fig 925M, JURY studio 21, Gent Wiedauwkaai
fig 925N, JURY studio 21, Gent Wiedauwkaai
fig 925O, JURY studio 21, Gent Wiedauwkaai
fig 925P, JURY studio 21, Gent Wiedauwkaai
fig 925Q, JURY studio 21, Gent Wiedauwkaai
fig 925R, JURY studio 21, Gent Wiedauwkaai
fig 925S, JURY studio 21, Gent Wiedauwkaai
fig 925T, JURY studio 21, Gent Wiedauwkaai
fig 925U, JURY studio 21, Gent Wiedauwkaai
fig 925V, JURY studio 21, Gent Wiedauwkaai
fig 925W, JURY studio 21, Gent Wiedauwkaai
fig 925X, JURY studio 21, Gent Wiedauwkaai
fig 925Y, JURY studio 21, Gent Wiedauwkaai
fig 925Z, JURY studio 21, Gent Wiedauwkaai
fig 925, JURY studio 21, Gent Wiedauwkaai
fig 925, JURY studio 21, Gent Wiedauwkaai
fig 925, JURY studio 21, Gent Wiedauwkaai
fig 925, JURY studio 21, Gent Wiedauwkaai
fig 925, JURY studio 21, Gent Wiedauwkaai
fig 434A, MAQUETTE_WTC_ONTWERP
fig 434B, MAQUETTE_WTC_ONTWERP
fig 434C, MAQUETTE_WTC_ONTWERP
fig 434D, MAQUETTE_WTC_ONTWERP
fig 434E, MAQUETTE_WTC_ONTWERP
fig 334A, WERKMAQUETTE_3.1
fig 334B, WERKMAQUETTE_3.1
fig 683A, section
fig 683B, section
fig 683C, section
fig 346A, Site visite Orsi Academy
fig 346B, Site visite Orsi Academy
fig 346C, Site visite Orsi Academy
fig 346D, Site visite Orsi Academy
fig 346E, Site visite Orsi Academy
fig 346F, Site visite Orsi Academy
fig 346G, Site visite Orsi Academy
fig 346H, Site visite Orsi Academy
fig 346I, Site visite Orsi Academy
fig 346J, Site visite Orsi Academy
fig 346K, Site visite Orsi Academy
fig 346L, Site visite Orsi Academy
fig 32A, drawing, Hangar INCO, Exploded construction of the hangar
fig 32B, drawing, Hangar INCO, Composition detail of brick, concrete columns and plinth
fig 32C, Hangar INCO
fig 32D, Hangar INCO
fig 32E, photo, Hangar INCO, Skylight
fig 32F, photo, Hangar INCO, Skylight
fig 32G, photo, Hangar INCO, Concrete columns, laminated wooden beams
fig 32H, photo, Hangar INCO, Concrete columns & beams
fig 397A, drawing, Isometrie gevel
fig 604A, Masterplan V2
fig 604B, Masterplan V2
fig 440A, mapping trough the lens of G&G
fig 984A, photo, Aldo Rossi
fig 688A, Model Manchester
fig 688B, Model Manchester
fig 688C, Model Manchester
fig 688D, Model Manchester
fig 688E, Model Manchester
fig 843A, Willem Boel – Primary Talks
fig 58A, Model #1
fig 58B, Model #1
fig 608A, drawing, 01/04
fig 608B, drawing, 01/04
fig 608C, drawing, 01/04
fig 559A, Machinekamer Vynckier site
fig 697A, 1 UNIT
fig 697B, 1 UNIT
fig 573A, Model of vision on masterplan, scale 1/1000
fig 387A, CATHEDRALE COMMUNALE_ISOMETRIC
fig 618A, U VYNCKIER
fig 618B, U VYNCKIER
fig 685A, facades
fig 685B, facades
fig 685C, facades
fig 685D, facades
fig 712A, photo, Vynckier 2, Vynckier 2, Structuur, Grid Vynckier 1
fig 718A, photo, Vynckier 2, Vynckier 2, Principe 'bloembakken'
fig 922A, Design isometrie
fig 520A, Vynckier site bezoek
fig 610A, Masterplan 25/03 & 1/04 2020
fig 585A, Proposal Masterplan
fig 719A, photo, Vynckier 2, Vynckier 2, Snede
fig 34A, model, Lignatur floor/ roof element, Lignatur floor element - hollow core slab
fig 34B, model, Lignatur floor/ roof element, Lignatur floor element - Detail possibilties ducts
fig 93A, TECHNICAL DETAILS, Technical detail on the guiding rails
fig 93B, TECHNICAL DETAILS, Technical detail on the connection between the steel structure & foundation
fig 213A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 548A, Parkeergebouw Ledeberg, Nieuw Parkeergebouw Ledeberg
fig 102A, drawing, club house
fig 311A, Analysing the parking lot
fig 311B, Analysing the parking lot
fig 311C, Analysing the parking lot
fig 311D, Analysing the parking lot
fig 311E, Analysing the parking lot
fig 137A, model, photos models
fig 137B, photo, photos models
fig 137C, model, photos models
fig 137D, photos models
fig 137E, photos models
fig 592A, drawing, 25/03
fig 592B, drawing, 25/03
fig 592C, model, 25/03
fig 315A, Tetris Within A Tetris
fig 924A, Design facades
fig 796A, bOb van Reeth, House Botte
fig 980A, photo, Site visit W6
fig 980B, photo, Site visit W6
fig 980C, photo, Site visit W6
fig 500A, Section A110
fig 59A, PUNCHED/PUNCTURED BEAM
fig 59B, PUNCHED/PUNCTURED BEAM
fig 59C, PUNCHED/PUNCTURED BEAM
fig 427A, WTC remodel – a tower can have a lot of different plans
fig 427B, WTC remodel – a tower can have a lot of different plans
fig 427C, WTC remodel – a tower can have a lot of different plans
fig 427D, WTC remodel – a tower can have a lot of different plans
fig 427E, WTC remodel – a tower can have a lot of different plans
fig 427F, WTC remodel – a tower can have a lot of different plans
fig 427G, WTC remodel – a tower can have a lot of different plans
fig 427H, WTC remodel – a tower can have a lot of different plans
fig 427I, WTC remodel – a tower can have a lot of different plans
fig 427J, WTC remodel – a tower can have a lot of different plans
fig 427K, WTC remodel – a tower can have a lot of different plans
fig 427L, WTC remodel – a tower can have a lot of different plans
fig 427M, WTC remodel – a tower can have a lot of different plans
fig 427N, WTC remodel – a tower can have a lot of different plans
fig 427O, WTC remodel – a tower can have a lot of different plans
fig 427P, WTC remodel – a tower can have a lot of different plans
fig 427Q, WTC remodel – a tower can have a lot of different plans
fig 427R, WTC remodel – a tower can have a lot of different plans
fig 427S, WTC remodel – a tower can have a lot of different plans
fig 427T, WTC remodel – a tower can have a lot of different plans
fig 427U, WTC remodel – a tower can have a lot of different plans
fig 427V, WTC remodel – a tower can have a lot of different plans
fig 427W, WTC remodel – a tower can have a lot of different plans
fig 427X, WTC remodel – a tower can have a lot of different plans
fig 427Y, WTC remodel – a tower can have a lot of different plans
fig 427Z, WTC remodel – a tower can have a lot of different plans
fig 427, WTC remodel – a tower can have a lot of different plans
fig 427, WTC remodel – a tower can have a lot of different plans
fig 427, WTC remodel – a tower can have a lot of different plans
fig 427, WTC remodel – a tower can have a lot of different plans
fig 427, WTC remodel – a tower can have a lot of different plans
fig 427, WTC remodel – a tower can have a lot of different plans
fig 838A, Becher Price
fig 325A, work documents 20180417
fig 325B, work documents 20180417
fig 325C, work documents 20180417
fig 672A, drawing, Dwarse snede
fig 513A, Structural analysis, AFASIA, P. FLammer
fig 661A, drawing, 27/05
fig 661B, drawing, 27/05
fig 661C, model, 27/05
fig 661D, drawing, 27/05
fig 661E, drawing, 27/05
fig 661F, drawing, 27/05
fig 661G, model, 27/05
fig 661H, model, 27/05
fig 479A, work in progress
fig 479B, work in progress
fig 653A, primary arcs
fig 145A, STRUCTURAL DESIGN PRINCIPLES
fig 145B, STRUCTURAL DESIGN PRINCIPLES
fig 145C, STRUCTURAL DESIGN PRINCIPLES
fig 145D, STRUCTURAL DESIGN PRINCIPLES
fig 145E, STRUCTURAL DESIGN PRINCIPLES
fig 145F, STRUCTURAL DESIGN PRINCIPLES
fig 145G, STRUCTURAL DESIGN PRINCIPLES
fig 643A, MASTERPLAN VYNCKIER
fig 496A, photo, maquettefoto A. Lavalléestraat
fig 399A, drawing, New vs old structure, steel vs concrete
fig 201A, Floors sections
fig 306A, Site Visit 2
fig 306B, Site Visit 2
fig 306C, Site Visit 2
fig 306D, Site Visit 2
fig 941A, model, Analyse Picobello
fig 941B, model, Analyse Picobello
fig 941C, Analyse Picobello
fig 5A, photo, Concrete Structure, Concrete Grid Structure
fig 5B, photo, Concrete Structure, Concrete Skylight
fig 549A, Parkeergebouw Ledeberg, Nieuw Parkeergebouw Ledeberg
fig 457A, Enclosed house
fig 840A, Becher prize
fig 840B, Becher prize
fig 453A, renovated structure
fig 430A, model, jury WTC
fig 430B, model, jury WTC
fig 430C, model, jury WTC
fig 953A, onderzoek structuur – vorm – werking
fig 953B, onderzoek structuur – vorm – werking
fig 931A, Design model 1/50
fig 931B, Design model 1/50
fig 623A, Masterplan level 1
fig 337A, Ingang wtc via kern
fig 207A, model
fig 378A, Model structure
fig 851A, ERFGOEDDEPOT TREZOOR KORTRIJK
fig 851B, ERFGOEDDEPOT TREZOOR KORTRIJK
fig 851C, ERFGOEDDEPOT TREZOOR KORTRIJK
fig 330A, CONCEPTBEELD_1
fig 542A, Aansluiting staalframebouw
fig 766A, drawing, Città Analoga, Aldo Rossi
fig 691A, 3RROR cad to jpg
fig 739A, photo, Strabag – Stapelplein Gent, Hole for crane inside basement
fig 506A, drawing, PICARDSTRAAT DETAILSECTION
fig 248A, photo, exploring the deep plan
fig 917A, industrial buildings, grafted onto rammed earth wall with common functions
fig 917B, industrial buildings, grafted onto rammed earth wall with common functions
fig 917C, industrial buildings, grafted onto rammed earth wall with common functions
fig 917D, industrial buildings, grafted onto rammed earth wall with common functions
fig 917E, industrial buildings, grafted onto rammed earth wall with common functions
fig 301A, WTC Plan/Section Studentdorms
fig 67A, College Football Hall of Fame, Robert Venturi & Denise Scott Brown
fig 67B, College Football Hall of Fame, Robert Venturi & Denise Scott Brown
fig 701A, De Nieuwe Vynckier – Incubator – Section
fig 553A, Section Store Shed
fig 345A, La Fábrica – Ricardo Bofill
fig 967A, analyse maquette
fig 967B, analyse maquette
fig 172A, drawing, Research new structures in combination with existing
fig 172B, drawing, Research new structures in combination with existing
fig 172C, drawing, Research new structures in combination with existing, acoustic solutions - new vs. existing (2)
fig 172D, drawing, Research new structures in combination with existing
fig 172E, drawing, Research new structures in combination with existing
fig 172F, photo, Research new structures in combination with existing, A
fig 172G, photo, Research new structures in combination with existing, B
fig 172H, Research new structures in combination with existing, Fase 1
fig 172I, Research new structures in combination with existing, fase 3
fig 384A, CATHEDRALE COMMUNALE_SECTIONS
fig 384B, CATHEDRALE COMMUNALE_SECTIONS
fig 566A, bouw fabriek schoorsteen
fig 566B, bouw fabriek schoorsteen
fig 566C, bouw fabriek schoorsteen
fig 740A, photo, Jubileumlaan, construction soilmixwall
fig 380A, Final design: looking inside the model
fig 380B, Final design: looking inside the model
fig 1004A, End Presentation, Models
fig 1004B, End Presentation, Models
fig 1004C, End Presentation, Models
fig 485A, Structure LaVallée
fig 489A, NG17 – preliminary design 06/05 – hostel + offices
fig 489B, NG17 – preliminary design 06/05 – hostel + offices
fig 962A, FINAL DESIGN
fig 227A, proces_29
fig 670A, drawing, Masterplan
fig 215A, studio, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 963A, FINAL DESIGN
fig 963B, FINAL DESIGN
fig 852A, MAISTER HEADQ., concrete pink architecture facade
fig 791A, Alfred Hardy
fig 791B, Alfred Hardy
fig 791C, Alfred Hardy
fig 791D, Alfred Hardy
fig 159A, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159B, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159C, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159D, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159E, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159F, photo, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159G, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159H, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159I, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159J, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159K, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159L, drawing, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159M, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 159N, Research Drawings about the existing structure in the ‘zonder-naamstraat site’
fig 504A, TOWER
fig 504B, TOWER
fig 504C, TOWER
fig 504D, TOWER
fig 277A, Steel connections WTC +24
fig 277B, Steel connections WTC +24
fig 277C, Steel connections WTC +24
fig 277D, Steel connections WTC +24
fig 277E, Steel connections WTC +24
fig 277F, Steel connections WTC +24
fig 277G, Steel connections WTC +24
fig 277H, Steel connections WTC +24
fig 452A, Enclosed houses
fig 452B, photo, Enclosed houses
fig 780A, drawing, Eames Case Study House 8, Axo deciphering the different constuctive elements inside the Eames House.
fig 286A, sketch on existing plan
fig 251A, DEEP PLAN construction detail 1, structural detail 1
fig 786A, Isometrie – Lange & Esthers Houses – Mies VDR
fig 552A, Prefab Walls
fig 209A, drawing, proces_10
fig 847A, drawing, Analysis aircraft shed
fig 847B, drawing, Analysis aircraft shed
fig 847C, drawing, Analysis aircraft shed
fig 847D, drawing, Analysis aircraft shed
fig 847E, drawing, Analysis aircraft shed
fig 847F, drawing, Analysis aircraft shed
fig 749A, photo, Vynckier 2, Principe oud en nieuw, Maquette
fig 682A, Maquette Masterplan
fig 164A, photo, CREE LCT building system, Floor slab with the holes in it for the steel bar of the columns
fig 164B, CREE LCT building system, wall piece with the columns attached
fig 966A, finaale maquette
fig 966B, finaale maquette
fig 966C, finaale maquette
fig 90A, Connection of a steel beam to a concrete wall
fig 90B, Connection of a steel beam to a concrete wall
fig 64A, DOME – EPS + SPRAYED CONCRETE, DOME - EPS + SPRAYED CONCRETE
fig 64B, DOME – EPS + SPRAYED CONCRETE
fig 64C, DOME – EPS + SPRAYED CONCRETE
fig 64D, DOME – EPS + SPRAYED CONCRETE
fig 64E, DOME – EPS + SPRAYED CONCRETE
fig 64F, DOME – EPS + SPRAYED CONCRETE
fig 64G, DOME – EPS + SPRAYED CONCRETE
fig 652A, drawing parochiezaal
fig 684A, ingrepen op aanwezige context
fig 684B, ingrepen op aanwezige context
fig 7A, drawing, types of compound beam
fig 287A, WTC 1 axo tetris
fig 33A, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre Gentbrugge - site
fig 33B, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre - Primary structure
fig 33C, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre Gentbrugge - Concrete ceiling
fig 33D, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre - fragment
fig 33E, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre - Concrete cantilever
fig 33F, photo, Factory “De Porre” – Gentbrugge, Factory Mill De Porre Gentbrugge - steel truss
fig 219A, drawing, proces_19
fig 318A, Axonometric WTC
fig 398A, Brewery visit
fig 398B, Brewery visit
fig 69A, models
fig 468A, GEORGE & GILBERT
fig 468B, GEORGE & GILBERT
fig 812A, Beton model y-kolom
fig 812B, Beton model y-kolom
fig 812C, Beton model y-kolom
fig 362A, WTC 1 – model of mosque
fig 362B, WTC 1 – model of mosque
fig 407A, drawing, open apartment
fig 130A, Example sites photos
fig 130B, Example sites photos
fig 130C, Example sites photos
fig 372A, cathédrale communale work documents
fig 372B, cathédrale communale work documents
fig 640A, Maquette
fig 640B, Maquette
fig 488A, detail – wood & wood connection
fig 488B, detail – wood & wood connection
fig 488C, detail – wood & wood connection
fig 418A, drawing, snede
fig 537A, ECAM – Agwa Architects
fig 537B, ECAM – Agwa Architects
fig 38A, drawing, pergola without roof connection
fig 357A, Overlaying Bamboo “hinge”
fig 319A, exploded sokkel
fig 492A, DETAIL – brick meets wood
fig 908A, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 908B, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 908C, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 908D, LOT48 Wiedauwkaai, MODULAR CONTAINER UNITS
fig 115A, photo, Site visit
fig 115B, photo, Site visit
fig 115C, photo, Site visit
fig 115D, photo, Site visit
fig 115E, photo, Site visit
fig 802A, Briona 72
fig 764A, Analyse Robert Venturi en Denise Scott Brown, Sainsbury Wing National Gallery
fig 764B, Analyse Robert Venturi en Denise Scott Brown, Sainsbury Wing National Gallery
fig 764C, Analyse Robert Venturi en Denise Scott Brown, Sainsbury Wing National Gallery
fig 927A, Vertical farming
fig 927B, Vertical farming
fig 381A, ANALYSIS WTC
fig 381B, ANALYSIS WTC
fig 626A, drawing, Section of a Tulou, traditional housing in China
fig 626B, drawing, Section of a Tulou, traditional housing in China
fig 240A, drawing, axonometry Marta and Luciana
fig 815A, photo, A. Mangiarotti
fig 815B, photo, A. Mangiarotti
fig 815C, A. Mangiarotti
fig 815D, drawing, A. Mangiarotti
fig 815E, photo, A. Mangiarotti
fig 815F, photo, A. Mangiarotti
fig 182A, drawing, Masterplan final site gentbrugge
fig 182B, drawing, Masterplan final site gentbrugge, coworking
fig 182C, drawing, Masterplan final site gentbrugge
fig 182D, photo, Masterplan final site gentbrugge
fig 182E, photo, Masterplan final site gentbrugge
fig 182F, photo, Masterplan final site gentbrugge
fig 928A, Design spaces
fig 928B, Design spaces
fig 928C, Design spaces
fig 971A, The Family – Isamu Noguchi (Photo by Ezra Stoller)
fig 445A, Adjacent
fig 81A, drawing, ANALYSE EXISTING STRUCTURES
fig 817A, Willemen Infra Asfaltcentrale Gent
fig 817B, Willemen Infra Asfaltcentrale Gent
fig 150A, Composite steel columns
fig 899A, model, I-joist factory
fig 899B, I-joist factory
fig 899C, I-joist factory
fig 410A, axo details
fig 410B, drawing, axo details
fig 6A, drawing, Drawing connection of steel structure
fig 6B, drawing, Drawing connection of steel structure
fig 222A, model, proces_22
fig 686A, floorplan
fig 686B, floorplan
fig 686C, floorplan
fig 637A, Masterplan model
fig 239A, PHOTO
fig 43A, photo, Hot Rivet, knooppunt staalstructuur
fig 56A, sketches container : Stacking;Connection
fig 56B, sketches container : Stacking;Connection
fig 56C, sketches container : Stacking;Connection
fig 56D, sketches container : Stacking;Connection
fig 56E, sketches container : Stacking;Connection
fig 149A, Sketches
fig 149B, Sketches
fig 807A, Vliegtuigloods Grimbergen
fig 187A, studio at carlos ramos’ pavillion
fig 934A, Analyse Nachtergaele models
fig 934B, Analyse Nachtergaele models
fig 934C, Analyse Nachtergaele models
fig 934D, Analyse Nachtergaele models
fig 934E, Analyse Nachtergaele models
fig 934F, Analyse Nachtergaele models
fig 977A, Fotoreeks
fig 977B, Fotoreeks
fig 977C, Fotoreeks
fig 977D, Fotoreeks
fig 977E, Fotoreeks
fig 88A, MODEL #4
fig 328A, Werf station parking
fig 328B, Werf station parking, plan ondergrondse parking
fig 328C, Werf station parking, wapening om 4 bogen op aan te sluiten, door een fout is het beton te hoog gegoten waardoor alles terug is uitgekapt. Hierdoor komt de wapening in het beton bloot te liggen.
fig 328D, Werf station parking, beton voor de Kiss&Ride wordt gegoten.
fig 328E, Werf station parking, achteringang met een tijdelijke muur die door de uitsparingen makkelijk weggehaald kan worden.
fig 328F, Werf station parking, peilers uit gewapend beton waar het tunneldak op is gelegd. Hier komen 2 rijstroken.
fig 328G, Werf station parking, doorgang naar ondergrondse parking en naar afrit
fig 700A, De Nieuwe Vynckier – Incubator – Concept
fig 836A, drawing, Facq building, concrete detail with BSF-connection
fig 933A, drawing, Final design plan and drawings
fig 933B, drawing, Final design plan and drawings
fig 933C, drawing, Final design plan and drawings
fig 933D, drawing, Final design plan and drawings
fig 933E, drawing, Final design plan and drawings
fig 933F, drawing, Final design plan and drawings
fig 933G, drawing, Final design plan and drawings
fig 52A, CONSTRUCTION SITE
fig 958A, FINAL DESIGN
fig 204A, meetings, its. Ivo Tavares Studio - fotografo de arquitectura - architectural photographer
fig 805A, Haus ohne eigenschaften
fig 722A, photo, Vynckier 2, Vynckier 2, Wachtgevel
fig 629A, drawing, SECTION VYNCKIER
fig 775A, photo, Thomas Ruff Collages, Autographe, Wavre,Teamwork with Jill Gielen.
fig 775B, photo, Thomas Ruff Collages, Mopac, Lommel,Teamwork with Jill Gielen.
fig 775C, photo, Thomas Ruff Collages, Stukwerkers, Gent,Teamwork with Jill Gielen.
fig 902A, drawing, I-joist factory
fig 312A, A Cut Into Our Model
fig 312B, A Cut Into Our Model
fig 312C, A Cut Into Our Model
fig 762A, Analyse Robert Venturi en Denise Scott Brown, Big Donut Drive-in
fig 997A, End Presentation, Model
fig 997B, End Presentation, Model
fig 997C, model, End Presentation, Model
fig 997D, model, End Presentation, Model
fig 997E, model, End Presentation, Model
fig 997F, model, End Presentation, Model
fig 299A, WTC – plan section
fig 77A, Concrete building elements
fig 77B, Concrete building elements
fig 77C, Concrete building elements
fig 77D, Concrete building elements
fig 77E, Concrete building elements
fig 77F, Concrete building elements
fig 77G, Concrete building elements
fig 77H, Concrete building elements
fig 446A, photo, Gilbert & George
fig 710A, photo, Vynckier, Masterplan, Zicht op plein
fig 1013A, drawing, Plan 1/500 mobility hub
fig 620A, Structuur Schijf
fig 481A, detail – concrete & wood connection
fig 202A, WALL LIMIT AXONOMETRIC
fig 35A, drawing, Floor systems of bricks
fig 35B, drawing, Floor systems of bricks
fig 35C, drawing, Floor systems of bricks
fig 35D, model, Floor systems of bricks
fig 404A, drawing, DETAIL_SILO
fig 575A, Digital masterplan, scale 1/1000
fig 526A, drawing, Sketch of Art & Architecture Building
fig 731A, Primary Circles_Model
fig 405A, drawing, SECTION_BREWERY_AA’
fig 546A, Jun Igarashi – Hat H house
fig 339A, Detail of 1 Bligh Street
fig 335A, REFERENTIE_3
fig 483A, Stut-opties
fig 106A, drawing, SITE
fig 106B, drawing, SITE
fig 95A, Tube and Coupler Scaffolds
fig 95B, Tube and Coupler Scaffolds
fig 95C, Tube and Coupler Scaffolds
fig 95D, Tube and Coupler Scaffolds
fig 95E, Tube and Coupler Scaffolds
fig 95F, Tube and Coupler Scaffolds
fig 938A, Luminus
fig 973A, bOb Van Reeth, House Botte, 1968-70
fig 753A, detail schetsen
fig 753B, detail schetsen
fig 753C, detail schetsen
fig 753D, detail schetsen
fig 753E, detail schetsen
fig 753F, detail schetsen
fig 914A, FIETSBRUG WIEDAUWKAAI
fig 914B, FIETSBRUG WIEDAUWKAAI
fig 914C, FIETSBRUG WIEDAUWKAAI
fig 914D, photo, FIETSBRUG WIEDAUWKAAI
fig 914E, FIETSBRUG WIEDAUWKAAI
fig 914F, FIETSBRUG WIEDAUWKAAI
fig 914G, FIETSBRUG WIEDAUWKAAI
fig 914H, FIETSBRUG WIEDAUWKAAI
fig 639A, Staal-beton kolom
fig 639B, Staal-beton kolom
fig 687A, research existing structure
fig 189A, MAIN PLAN
fig 443A, VERNACULAR
fig 571A, model, Masterplan Vynckiersite
fig 571B, model, Masterplan Vynckiersite
fig 667A, Masterplan Vynckier
fig 600A, photo, Recycled U, Een manier van bouwen die de aarde zo min mogelijk belast. Als schakel tussen wonen en industrie die de site verbindt.
fig 600B, Recycled U
fig 173A, model, model analyse
fig 533A, drawing, Magney House – Glenn Murcutt – section
fig 533B, drawing, Magney House – Glenn Murcutt – section
fig 261A, drawing, WTC_subtraction, WTC_subtraction
fig 261B, drawing, WTC_subtraction, WTC_axonometry
fig 229A, proces_31
fig 160A, PROCES – AFBREKEN VS OPBOUW
fig 160B, PROCES – AFBREKEN VS OPBOUW
fig 530A, Werf, Temporary school of Villejuif, Jean Prouvé
fig 123A, New structures
fig 820A, SUPERSTUDIO Un catalogo di ville 1968-1970, Villa Suburbana A6
fig 738A, drawing, axo Manchester and Tulou, axonometric drawing
fig 955A, structuur – detail knoop
fig 413A, Final design detail
fig 413B, Final design detail
fig 101A, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101B, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101C, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101D, drawing, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 101E, drawing, WASSERIJ DER VLAANDEREN – ISO LOODS
fig 431A, CATHEDRALE COMMUNALE_JURY
fig 431B, CATHEDRALE COMMUNALE_JURY
fig 431C, CATHEDRALE COMMUNALE_JURY
fig 431D, CATHEDRALE COMMUNALE_JURY
fig 431E, CATHEDRALE COMMUNALE_JURY
fig 431F, CATHEDRALE COMMUNALE_JURY
fig 431G, CATHEDRALE COMMUNALE_JURY
fig 431H, CATHEDRALE COMMUNALE_JURY
fig 431I, CATHEDRALE COMMUNALE_JURY
fig 431J, CATHEDRALE COMMUNALE_JURY
fig 431K, CATHEDRALE COMMUNALE_JURY
fig 431L, CATHEDRALE COMMUNALE_JURY
fig 784A, Mies van der Rohe – Kruiskolom
fig 752A, ontwerpschetsen
fig 752B, ontwerpschetsen
fig 752C, ontwerpschetsen
fig 752D, ontwerpschetsen
fig 752E, ontwerpschetsen
fig 752F, ontwerpschetsen
fig 752G, ontwerpschetsen
fig 752H, ontwerpschetsen
fig 752I, ontwerpschetsen
fig 752J, ontwerpschetsen
fig 752K, ontwerpschetsen
fig 752L, ontwerpschetsen
fig 752M, ontwerpschetsen
fig 245A, model, Axel Fangueiro and Luna Fonseca
fig 859A, WOODPROTECT ; Storage of wooden sleepers
fig 234A, model, João Branco and Alejandra Calvo
fig 825A, Structural Plan Pattyn Factory
fig 216A, drawing, proces_13
fig 347A, Scheme structures silo
fig 347B, Scheme structures silo
fig 264A, Manhattan project
fig 264B, Manhattan project
fig 264C, Manhattan project
fig 972A, drawing, Renaat Braem, ideology of reconstruction 1950
fig 972B, drawing, Renaat Braem, ideology of reconstruction 1950
fig 972C, photo, Renaat Braem, ideology of reconstruction 1950
fig 797A, analysis facade hangar
fig 772A, Peter Behrens, AEG Turbinefabriek Berlijn (1909)
fig 582A, Proposal Facade Vynckier site
fig 21A, photo, Tram depot Marconi – site visit
fig 21B, photo, Tram depot Marconi – site visit
fig 21C, photo, Tram depot Marconi – site visit
fig 937A, drawing, Jury 27mei2021
fig 937B, Jury 27mei2021
fig 937C, Jury 27mei2021
fig 937D, Jury 27mei2021
fig 937E, Jury 27mei2021
fig 910A, Analyse Picobello Roeselare
fig 910B, Analyse Picobello Roeselare
fig 760A, fire station Mechelen
fig 824A, Structure Pattyn Factory
fig 612A, drawing, Section connection Manchester and CONNECTING GRID 1.0
fig 61A, roof on/between containers
fig 61B, roof on/between containers
fig 61C, roof on/between containers
fig 61D, roof on/between containers
fig 61E, roof on/between containers, KONICA MINOLTA DIGITAL CAMERA
fig 61F, roof on/between containers
fig 271A, Citygroup Center
fig 271B, Citygroup Center
fig 271C, Citygroup Center
fig 450A, Collage Gilbert and Georges
fig 188A, porto class 17
fig 157A, model masterplan
fig 472A, FUNDERING
fig 146A, Visit Industrial Natural stone factory
fig 146B, Visit Industrial Natural stone factory
fig 393A, model, Cathedrale Communale
fig 393B, model, Cathedrale Communale
fig 393C, model, Cathedrale Communale
fig 393D, model, Cathedrale Communale
fig 393E, model, Cathedrale Communale
fig 393F, model, Cathedrale Communale
fig 393G, model, Cathedrale Communale
fig 811A, Detail betonnen loods Ieper
fig 811B, Detail betonnen loods Ieper
fig 392A, model, Cathedrale Communale
fig 392B, model, Cathedrale Communale
fig 392C, model, Cathedrale Communale
fig 392D, model, Cathedrale Communale
fig 392E, model, Cathedrale Communale
fig 392F, model, Cathedrale Communale
fig 392G, model, Cathedrale Communale
fig 392H, model, Cathedrale Communale
fig 392I, model, Cathedrale Communale
fig 702A, De Nieuwe Vynckier – Incubator – Model
fig 203A, sketch
fig 280A, werfbezoek – ultiem grid 740 x 740
fig 280B, werfbezoek – ultiem grid 740 x 740
fig 344A, How to become a Niemeyer
fig 849A, Structure analysis Erfoeddepot Trezoor, Kortrijk
fig 849B, Structure analysis Erfoeddepot Trezoor, Kortrijk
fig 849C, Structure analysis Erfoeddepot Trezoor, Kortrijk
fig 482A, test housing tower
fig 354A, WERKMAQUETTE_3.3_BUREN
fig 989A, Walkway
fig 989B, Walkway
fig 989C, Walkway
fig 417A, sfeer
fig 499A, Housing tower – AXO
fig 133A, photo, Final urban model
fig 133B, Final urban model
fig 133C, model, Final urban model
fig 726A, stil leven de werf
fig 726B, stil leven de werf
fig 726C, stil leven de werf
fig 726D, stil leven de werf
fig 726E, stil leven de werf
fig 726F, stil leven de werf
fig 726G, stil leven de werf
fig 726H, stil leven de werf
fig 858A, Concrete stacking blocks ; variations in form and size
fig 636A, circular building
fig 636B, circular building
fig 162A, REFERENCE – ALDO VAN EYCK SONSBEEK PAVILJOEN
fig 557A, section engine room archive
fig 411A, Torre Velasca
fig 411B, Torre Velasca
fig 114A, drawing, Existing structure
fig 114B, drawing, Existing structure, Axo
fig 114C, drawing, Existing structure, Section
fig 114D, photo, Existing structure
fig 114E, photo, Existing structure
fig 114F, photo, Existing structure
fig 735A, drawing, Manchester, concept apartments and stores
fig 735B, drawing, Manchester, concept structure
fig 735C, drawing, Manchester, concept offices
fig 735D, drawing, Manchester, entrance
fig 735E, drawing, Manchester, CLT structure details
fig 735F, drawing, Manchester, process
fig 735G, drawing, Manchester, plan
fig 735H, drawing, Manchester, section 1
fig 735I, drawing, Manchester, section 2
fig 735J, model, Manchester, courtyard
fig 735K, model, Manchester, facade
fig 302A, WTC Sketch
fig 28A, photo, Industrial warehouse, connection between foundation and column
fig 28B, photo, Industrial warehouse, connection between column and beam
fig 28C, photo, Industrial warehouse
fig 28D, photo, Industrial warehouse, connection between beams
fig 28E, photo, Industrial warehouse, connection between column and beam
fig 28F, photo, Industrial warehouse
fig 233A, model, Valentin Graf and Borja Fernandez
fig 708A, photo, Vynckier, Masterplan, Maquette
fig 313A, Experience the real stuff
fig 313B, Experience the real stuff
fig 313C, Experience the real stuff
fig 314A, Conceptual thinking
fig 502A, Axonometric NG17
fig 341A, Axo concrete factory
fig 259A, model detail
fig 451A, collage de canal.brussels á la G&G
fig 400A, drawing, Connection to the floor
fig 290A, Reference: Standard Bank Centre – Hentrich, Petschnigg & Partners ( 1970)
fig 267A, OCBC Bank
fig 340A, Manitoba hydro place
fig 987A, photo, Construction site
fig 987B, photo, Construction site
fig 987C, photo, Construction site
fig 987D, photo, Construction site
fig 551A, Vynckier Manchester I Foundation
fig 813A, photo, Autographe, Teamwork with Jill Gielen.
fig 813B, photo, Autographe, Teamwork with Jill Gielen.
fig 813C, photo, Autographe, Teamwork with Jill Gielen.
fig 813D, photo, Autographe, Teamwork with Jill Gielen.
fig 647A, New Shed structure
fig 647B, New Shed structure
fig 994A, Hangend gebouw onder viaduct
fig 994B, Hangend gebouw onder viaduct
fig 994C, Hangend gebouw onder viaduct
fig 994D, Hangend gebouw onder viaduct
fig 994E, Hangend gebouw onder viaduct
fig 26A, photo, Lumat Site Gent
fig 26B, photo, Lumat Site Gent
fig 26C, photo, Lumat Site Gent
fig 2A, photo, ‘De Nobele’ – Site, Alongside the structure there's a workspace for a local artist.
fig 2B, photo, ‘De Nobele’ – Site, The unfinished upper part of the old textile factory.
fig 2C, photo, ‘De Nobele’ – Site, Detail of a main concrete column.
fig 2D, ‘De Nobele’ – Site, Analysis on which structure stays and which one disappears.
fig 2E, photo, ‘De Nobele’ – Site, Detail of the naked concrete structure.
fig 634A, shed structure
fig 634B, shed structure
fig 475A, Wachtstaven
fig 948A, Analyse
fig 462A, Tree Tops 2.0
fig 111A, ComFlor® 51+
fig 111B, model, ComFlor® 51+
fig 111C, photo, ComFlor® 51+
fig 761A, Nieuwstraat Sint-Gillis-Waas
fig 161A, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 161B, drawing, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 161C, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 161D, Conceptual Drawings ‘Zonder-Naamstraat Site’
fig 662A, Markthal
fig 662B, model, Markthal
fig 662C, drawing, Markthal
fig 662D, model, Markthal
fig 662E, model, Markthal
fig 662F, model, Markthal
fig 662G, model, Markthal
fig 662H, drawing, Markthal
fig 662I, drawing, Markthal
fig 662J, drawing, Markthal
fig 662K, drawing, Markthal
fig 662L, model, Markthal
fig 662M, drawing, Markthal
fig 707A, photo, Vynckier, Masterplan, Structuur site
fig 165A, analysing site Gents Bakkershuis
fig 544A, Bijgebouw Manchester 1
fig 654A, accordeon raam detail
fig 419A, waffle slab
fig 419B, waffle slab
fig 402A, drawing, Drawing of buildup wintergarden
fig 864A, Circular Stacking ; RUFF
fig 53A, visit construction site
fig 53B, visit construction site
fig 53C, visit construction site
fig 783A, Mies van der Rohe – Farnsworth House
fig 965A, omgevings maquette voorontwerp
fig 965B, omgevings maquette voorontwerp
fig 584A, drawing, VERTICAL FARMING WITH WATER PURIFICATION
fig 584B, photo, VERTICAL FARMING WITH WATER PURIFICATION
fig 599A, Proposal masterplan Vynckier site
fig 650A, Building shed structure new addition
fig 818A, axo, STORAGE FOR GRANULATES, NEXT TO CONCRETE PLANT
fig 276A, Structure WTC 1 +3 & +24
fig 276B, Structure WTC 1 +3 & +24
fig 276C, Structure WTC 1 +3 & +24
fig 276D, Structure WTC 1 +3 & +24
fig 276E, Structure WTC 1 +3 & +24
fig 276F, Structure WTC 1 +3 & +24
fig 276G, Structure WTC 1 +3 & +24
fig 276H, Structure WTC 1 +3 & +24
fig 276I, Structure WTC 1 +3 & +24
fig 276J, Structure WTC 1 +3 & +24
fig 276K, Structure WTC 1 +3 & +24
fig 986A, photo, 1/5000 identiteit vlekken (studie)
fig 986B, photo, 1/5000 identiteit vlekken (studie)
fig 174A, drawing, current structure analyse
fig 512A, model, END MODEL CNC
fig 512B, model, END MODEL CNC
fig 512C, END MODEL CNC
fig 107A, drawing, details in color
fig 107B, details in color
fig 107C, details in color
fig 107D, details in color
fig 107E, details in color
fig 107F, drawing, details in color
fig 767A, Teatro del Mondo, Aldo Rossi
fig 70A, photo, Pictures Nonnemeersstraat, Ghent
fig 70B, photo, Pictures Nonnemeersstraat, Ghent
fig 412A, analyse plint
fig 412B, analyse plint
fig 412C, drawing, analyse plint
fig 412D, analyse plint
fig 651A, Circle Building section
fig 583A, model, Proposal Masterplan Model
fig 529A, photo, Vynckier 1981-94
fig 529B, photo, Vynckier 1981-94
fig 511A, model, END MODEL
fig 511B, model, END MODEL
fig 511C, model, END MODEL
fig 921A, EL Beton A0 analyse
fig 466A, belibel
fig 176A, FINAL MODEL
fig 176B, FINAL MODEL
fig 284A, werfbezoek – kraan in liftschacht
fig 116A, drawing, Program, Freeing the site of cars by putting them in a tower of the same height as his modernistic neighbor.
fig 116B, photo, Program, Entering the city via the E17 viaduct
fig 116C, drawing, Program
fig 116D, photo, Program
fig 116E, drawing, Program, Program
fig 36A, photo, Woonzorgcentrum Van Lierde, the blocks can be used for structural and non-structural purposes
fig 243A, model, Luciana Ligeiro and Marta Faustino
fig 223A, drawing, proces_23
fig 212A, final isometric Axel and Luna
fig 470A, volumestudie
fig 926A, Vertical farming
fig 926B, Vertical farming
fig 926C, Vertical farming
fig 926D, Vertical farming
fig 926E, Vertical farming
fig 926F, Vertical farming
fig 421A, drawing, pt.2
fig 421B, drawing, pt.2
fig 421C, drawing, pt.2
fig 808A, Ruff Collage | Admisol, Toonzaal + woning | Luc Van Landuyt | 1978
fig 124A, photo, Construction clt
fig 940A, Analyse Robert Venturi en Denise Scott Brown
fig 940B, Analyse Robert Venturi en Denise Scott Brown
fig 940C, Analyse Robert Venturi en Denise Scott Brown
fig 940D, Analyse Robert Venturi en Denise Scott Brown
fig 519A, The Smithsons’ New Brutalism
fig 747A, photo, Vynckier 2, Principe, Maquette
fig 455A, depotdesign
fig 230A, proces_32
fig 993A, Plan Walkway
fig 993B, Plan Walkway
fig 993C, Plan Walkway
fig 993D, Plan Walkway
fig 375A, STRUCTUREMODEL_SERVICEFLATS_1
fig 375B, STRUCTUREMODEL_SERVICEFLATS_1
fig 568A, photo, WATER TOWER, Public square as entrance.
fig 568B, photo, WATER TOWER, Manchester's are for living and the heart of industry (water tower) between them.
fig 169A, research / site model
fig 169B, research / site model
fig 169C, research / site model
fig 282A, werfbezoek – zettingsvoegen
fig 19A, photo, SUPPORTING FACADE STRUCTURE, steel supporting structure
fig 110A, drawing, Current structure analyse
fig 110B, drawing, Current structure analyse
fig 110C, Current structure analyse
fig 110D, Current structure analyse
fig 110E, drawing, Current structure analyse
fig 110F, drawing, Current structure analyse
fig 110G, drawing, Current structure analyse
fig 247A, WTC pattern of the pillars
fig 194A, meetings
fig 269A, Shanghai Tower
fig 461A, Structure, Libelco
fig 461B, Structure, Libelco
fig 217A, drawing, proces_17
fig 946A, Gottfried Semper
fig 946B, Gottfried Semper
fig 704A, Model
fig 211A, proces_12
fig 678A, 27/05
fig 678B, 27/05
fig 678C, 27/05
fig 678D, drawing, 27/05
fig 678E, model, 27/05
fig 678F, model, 27/05
fig 678G, 27/05
fig 678H, drawing, 27/05
fig 678I, drawing, 27/05
fig 678J, 27/05
fig 678K, drawing, 27/05
fig 678L, drawing, 27/05
fig 952A, MODEL 1/100
fig 952B, MODEL 1/100
fig 952C, MODEL 1/100
fig 952D, MODEL 1/100
fig 671A, model, Schijf x Manchester
fig 671B, Schijf x Manchester
fig 671C, Schijf x Manchester
fig 671D, Schijf x Manchester
fig 671E, Schijf x Manchester
fig 256A, drawing, Structural core
fig 256B, drawing, Structural core
fig 175A, drawing, Project BOMA
fig 175B, drawing, Project BOMA
fig 175C, drawing, Project BOMA
fig 175D, drawing, Project BOMA
fig 175E, drawing, Project BOMA
fig 175F, drawing, Project BOMA
fig 175G, drawing, Project BOMA
fig 175H, Project BOMA
fig 632A, Structure ConnectingGrid
fig 426A, FINAL Model WTC
fig 426B, FINAL Model WTC
fig 426C, FINAL Model WTC
fig 85A, photo, Analysis of the site, structure, detail, 2D build-up of steel truss
fig 85B, photo, Analysis of the site, structure, detail, isometric
fig 85C, photo, Analysis of the site, structure, detail, isometric
fig 85D, photo, Analysis of the site, structure, detail, isometric
fig 85E, photo, Analysis of the site, structure, detail, isometric
fig 85F, photo, Analysis of the site, structure, detail, Site
fig 85G, photo, Analysis of the site, structure, detail, isometric
fig 833A, drawing, section detail structure
fig 866A, THE RESULT, Plans, sections and axonometry with Alexandre Moens
fig 866B, THE RESULT, Plans, sections and axonometry with Alexandre Moens
fig 866C, drawing, THE RESULT, Plans, sections and axonometry with Alexandre Moens
fig 480A, Werkmaquettes concept DAUWSTRAAT/PICARDSTRAAT, Processed with VSCO with preset
fig 480B, Werkmaquettes concept DAUWSTRAAT/PICARDSTRAAT, Processed with VSCO with preset
fig 950A, Omgeving isometrie
fig 950B, Omgeving isometrie
fig 238A, AXONOMETRIC, Jukyung & Uk
fig 556A, Model Engine Room
fig 556B, Model Engine Room
fig 295A, Civic Center – SOM
fig 580A, drawing, Drawing proposal Masterplan
fig 1020A, photo, conceptual text
fig 105A, WASSERIJ DER VLAANDEREN
fig 105B, WASSERIJ DER VLAANDEREN
fig 105C, WASSERIJ DER VLAANDEREN
fig 105D, WASSERIJ DER VLAANDEREN
fig 105E, WASSERIJ DER VLAANDEREN
fig 105F, WASSERIJ DER VLAANDEREN
fig 105G, WASSERIJ DER VLAANDEREN
fig 105H, WASSERIJ DER VLAANDEREN
fig 105I, WASSERIJ DER VLAANDEREN
fig 105J, WASSERIJ DER VLAANDEREN
fig 105K, WASSERIJ DER VLAANDEREN
fig 105L, WASSERIJ DER VLAANDEREN
fig 105M, WASSERIJ DER VLAANDEREN
fig 105N, WASSERIJ DER VLAANDEREN
fig 105O, photo, WASSERIJ DER VLAANDEREN
fig 105P, WASSERIJ DER VLAANDEREN
fig 105Q, WASSERIJ DER VLAANDEREN
fig 105R, WASSERIJ DER VLAANDEREN
fig 105S, WASSERIJ DER VLAANDEREN
fig 105T, WASSERIJ DER VLAANDEREN
fig 105U, WASSERIJ DER VLAANDEREN
fig 105V, WASSERIJ DER VLAANDEREN
fig 105W, WASSERIJ DER VLAANDEREN
fig 105X, WASSERIJ DER VLAANDEREN
fig 505A, drawing, DAUWSTRAAT DETAILSECTION
fig 220A, drawing, proces_20
fig 742A, STADSPARK VYNCKIER/ DE SCHIJF
fig 742B, STADSPARK VYNCKIER/ DE SCHIJF
fig 742C, STADSPARK VYNCKIER/ DE SCHIJF
fig 742D, STADSPARK VYNCKIER/ DE SCHIJF
fig 742E, STADSPARK VYNCKIER/ DE SCHIJF
fig 742F, STADSPARK VYNCKIER/ DE SCHIJF
fig 742G, STADSPARK VYNCKIER/ DE SCHIJF
fig 742H, STADSPARK VYNCKIER/ DE SCHIJF
fig 742I, STADSPARK VYNCKIER/ DE SCHIJF
fig 742J, STADSPARK VYNCKIER/ DE SCHIJF
fig 742K, STADSPARK VYNCKIER/ DE SCHIJF
fig 932A, model, Final design Model 1/100
fig 932B, model, Final design Model 1/100
fig 932C, model, Final design Model 1/100
fig 932D, model, Final design Model 1/100
fig 932E, model, Final design Model 1/100
fig 932F, model, Final design Model 1/100
fig 932G, model, Final design Model 1/100
fig 932H, model, Final design Model 1/100
fig 932I, model, Final design Model 1/100
fig 270A, Willis Tower