fig 515A, NG17 – preliminary design 06/05 – hostel + offices
fig 515B, NG17 – preliminary design 06/05 – hostel + offices
fig 497A, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 497B, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 497C, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 491A, Collage Rules
fig 470A, Old vs. new
No posts selected…
fig 515A NG17 – preliminary design 06/05 – hostel + offices, posted by Cedric Du Bois at 07.05.19 (filed under: concrete wood)
fig 515B NG17 – preliminary design 06/05 – hostel + offices, posted by Cedric Du Bois at 07.05.19 (filed under: concrete wood)
fig 497A Werfbezoek hoofdkwartier BNP Paribas Fortis, posted by Cedric Du Bois at 25.03.19 (filed under: concrete)
fig 497B Werfbezoek hoofdkwartier BNP Paribas Fortis, posted by Cedric Du Bois at 25.03.19 (filed under: concrete)
fig 497C Werfbezoek hoofdkwartier BNP Paribas Fortis, posted by Cedric Du Bois at 25.03.19 (filed under: concrete)
fig 491A Collage Rules, posted by Cedric Du Bois at 06.03.19 (filed under:)
fig 470A Old vs. new, posted by Cedric Du Bois at 25.02.19 (filed under:)