PRIMARY STRUCTURES, by Cedric Du Bois LOGIN
back-button
fig 486A, A110 – 2M wide cohousing
fig 480A, NG17 – preliminary design 06/05 – hostel + offices
fig 480B, model, NG17 – preliminary design 06/05 – hostel + offices, Part of structure with cantilever
fig 462A, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 462B, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 462C, Werfbezoek hoofdkwartier BNP Paribas Fortis
fig 456A, Collage Rules
fig 435A, Old vs. new
No posts selected…
fig 486A A110 – 2M wide cohousing, posted by Cedric Du Bois at 21.05.19 (filed under: steel)
fig 480A NG17 – preliminary design 06/05 – hostel + offices, posted by Cedric Du Bois at 07.05.19 (filed under: concrete wood)
fig 480B NG17 – preliminary design 06/05 – hostel + offices, posted by Cedric Du Bois at 07.05.19 (filed under: concrete wood)
fig 462A Werfbezoek hoofdkwartier BNP Paribas Fortis, posted by Cedric Du Bois at 25.03.19 (filed under: concrete)
fig 462B Werfbezoek hoofdkwartier BNP Paribas Fortis, posted by Cedric Du Bois at 25.03.19 (filed under: concrete)
fig 462C Werfbezoek hoofdkwartier BNP Paribas Fortis, posted by Cedric Du Bois at 25.03.19 (filed under: concrete)
fig 456A Collage Rules, posted by Cedric Du Bois at 06.03.19 (filed under:)
fig 435A Old vs. new, posted by Cedric Du Bois at 25.02.19 (filed under:)